Data Dubai

Qline (Qpoint Phaseii) 3c-Lw-R-054

Qline (Qpoint Phaseii) 3c-Lw-R-054Finished100% built108 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Qline (Qpoint Phaseii) 3c-Lw-R-054: ChatGPT · Claude · Perplexity

Qline (Qpoint Phaseii) 3c-Lw-R-054 is a project by Al Mazaya Emirates Real Estate Development Owned By Mazaya Alghad One Person Company L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
0
all property types · trailing 12 complete months
DLD verified
Off-plan share
—
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAl Mazaya Emirates Real Estate Development Owned By Mazaya Alghad One Person Company L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD27 Dec 2015
Construction started1 Jul 2015
Declared completion1 Nov 2016 — registry date, not a handover promise
Units in the project108
Project area9 098 sqm
Escrow agentMashreq Bank Psc
Project number1704

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 3 technical inspections for this project, from 23 Mar 2016 at 45.2% to 4 Jan 2017 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2016-11-012016-03-232017-01-04

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
4 Jan 2017100.0% +9.0 pp
20 Sep 201691.0% +45.9 pp
23 Mar 201645.2% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Qline (Qpoint Phaseii) 3c-Lw-R-054: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

025507520162017025507520162017

registered sales per calendar year; the current year is incomplete

YearSalesMedian priceMedian AED/sqftTotal registered value
201781AED 454k 500AED 38.34M
201627AED 625k 770AED 14.77M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent by year, 2017–2026

30k40k50k60k201720182019202020212022202320242025202630k40k50k60k2017202020232026

1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
Year1-bed flat
2026 YTD 48k
2025 44k
2024 42k
2023 38k
2022 35k
2021 32k
2020 36k
2019 44k
2018 51k
2017 54k

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 0 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Qline (Qpoint Phaseii) 3c-Lw-R-054. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Qpoint Liwan-Plot R053
Finished · Al Mazaya Real Estate Fz-Llc
51 m100%67
Qpoint Liwan-Plot R055
Finished · Al Mazaya Real Estate Fz-Llc
93 m100%82
Qpoint Liwan-Plot R052
Finished · Al Mazaya Real Estate Fz-Llc
100 m100%67
Qline (Qpoint Phaseii) 3c-Lw-R-064
Finished · Al Mazaya Emirates Real Estate Development Owned By Mazaya Alghad One Person Company L.L.C
146 m100%121
Qpoint Liwan-Plot R051
Finished · Al Mazaya Real Estate Fz-Llc
149 m100%58
Qpoint Liwan-Plot R050
Finished · Al Mazaya Real Estate Fz-Llc
204 m100%73
Qpoint Liwan-Plot R048
Finished · Al Mazaya Real Estate Fz-Llc
205 m100%50
Qpoint Liwan-Plot R047
Finished · Al Mazaya Real Estate Fz-Llc
231 m100%96
Qpoint Liwan-Plot R046
Finished · Al Mazaya Real Estate Fz-Llc
267 m100%57
Sunrise Boulevard 12
Finished · Lux Real Estate
340 m100%6

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Liwan1

Questions about Qline (Qpoint Phaseii) 3c-Lw-R-054

Who is the developer of Qline (Qpoint Phaseii) 3c-Lw-R-054?

The Dubai Land Department project registry lists Al Mazaya Emirates Real Estate Development Owned By Mazaya Alghad One Person Company L.L.C as the developer of Qline (Qpoint Phaseii) 3c-Lw-R-054.

Is Qline (Qpoint Phaseii) 3c-Lw-R-054 completed?

The DLD registry status of Qline (Qpoint Phaseii) 3c-Lw-R-054 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 1 Nov 2016 — a registry date, not a handover promise.

How many homes are in Qline (Qpoint Phaseii) 3c-Lw-R-054?

The DLD registry records 108 units in Qline (Qpoint Phaseii) 3c-Lw-R-054.

What is the price per square foot in Qline (Qpoint Phaseii) 3c-Lw-R-054?

Too few sales were registered in Qline (Qpoint Phaseii) 3c-Lw-R-054 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Qline (Qpoint Phaseii) 3c-Lw-R-054?

The escrow agent recorded by DLD for Qline (Qpoint Phaseii) 3c-Lw-R-054 is Mashreq Bank Psc.

Where is Qline (Qpoint Phaseii) 3c-Lw-R-054?

Qline (Qpoint Phaseii) 3c-Lw-R-054 is in the Liwan1 community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Qpoint Liwan-Plot R053, about 51 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Qline (Qpoint Phaseii) 3c-Lw-R-054 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/qline-qpoint-phaseii-3c-lw-r-054/”. Reuse is permitted with attribution.