Qpoint Liwan-Plot R050 is a project by Al Mazaya Real Estate Fz-Llc, recorded at 100% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Al Mazaya Real Estate Fz-Llc |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 9 Jun 2009 |
| Construction started | 1 May 2009 |
| Declared completion | 30 Jan 2014 — registry date, not a handover promise |
| Units in the project | 73 |
| Project area | 6 804 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 1194 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 4 technical inspections for this project, from 27 Jun 2012 at 81.9% to 19 Aug 2013 at 90.0%. Over the inspections since 27 Jun 2012 it moved 0.59 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 19 Aug 2013 | 90.0% | +3.8 pp |
| 10 Apr 2013 | 86.2% | +4.0 pp |
| 20 Nov 2012 | 82.2% | +0.3 pp |
| 27 Jun 2012 | 81.9% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Qpoint Liwan-Plot R050: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2016 | 1 | — | — | AED 561k |
| 2015 | 40 | AED 502k | 670 | AED 22.80M |
| 2014 | 32 | AED 745k | 689 | AED 26.16M |
| 2012 | 72 | AED 566k | — | AED 48.95M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent by year, 2021–2026
1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | 1-bed flat | 2-bed flat |
|---|---|---|
| 2026 YTD | 40k | — |
| 2025 | 38k | 50k |
| 2024 | 34k | 50k |
| 2023 | 31k | 43k |
| 2022 | 27k | 40k |
| 2021 | 30k | 37k |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 0 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Qpoint Liwan-Plot R050. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Qpoint Liwan-Plot R051 Finished · Al Mazaya Real Estate Fz-Llc |
56 m | 100% |
| Qpoint Liwan-Plot R052 Finished · Al Mazaya Real Estate Fz-Llc |
105 m | 100% |
| Qpoint Liwan-Plot R048 Finished · Al Mazaya Real Estate Fz-Llc |
113 m | 100% |
| Qpoint Liwan-Plot R053 Finished · Al Mazaya Real Estate Fz-Llc |
154 m | 100% |
| Qpoint Liwan-Plot R100 Finished · Al Mazaya Real Estate Fz-Llc |
159 m | 100% |
| Qpoint Liwan-Plot R047 Finished · Al Mazaya Real Estate Fz-Llc |
174 m | 100% |
| Qpoint Liwan-Plot R099 Finished · Al Mazaya Real Estate Fz-Llc |
191 m | 100% |
| Qline (Qpoint Phaseii) 3c-Lw-R-054 Finished · Al Mazaya Emirates Real Estate Development Owned By Mazaya Alghad One Person Company L.L.C |
204 m | 100% |
| Qpoint Liwan-Plot R055 Finished · Al Mazaya Real Estate Fz-Llc |
218 m | 100% |
| Qpoint Liwan-Plot R098 Finished · Al Mazaya Real Estate Fz-Llc |
229 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Liwan1
Questions about Qpoint Liwan-Plot R050
Who is the developer of Qpoint Liwan-Plot R050?
The Dubai Land Department project registry lists Al Mazaya Real Estate Fz-Llc as the developer of Qpoint Liwan-Plot R050.
Is Qpoint Liwan-Plot R050 completed?
The DLD registry status of Qpoint Liwan-Plot R050 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 30 Jan 2014 — a registry date, not a handover promise.
How many homes are in Qpoint Liwan-Plot R050?
The DLD registry records 73 units in Qpoint Liwan-Plot R050.
What is the price per square foot in Qpoint Liwan-Plot R050?
Too few sales were registered in Qpoint Liwan-Plot R050 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.
Who holds the escrow account for Qpoint Liwan-Plot R050?
The escrow agent recorded by DLD for Qpoint Liwan-Plot R050 is Mashreq Bank Psc.
Where is Qpoint Liwan-Plot R050?
Qpoint Liwan-Plot R050 is in the Liwan1 community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Qpoint Liwan-Plot R051, about 56 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗