Qpoint Liwan-Plot R051
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Qpoint Liwan-Plot R051: ChatGPT · Claude · Perplexity
Qpoint Liwan-Plot R051 is a project by Al Mazaya Real Estate Fz-Llc, recorded at 100% complete at its last Dubai Land Department inspection. 8 sales registered in the trailing 12 months at a median AED 642k (796 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 8 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Al Mazaya Real Estate Fz-Llc |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 9 Jun 2009 |
| Construction started | 25 Mar 2009 |
| Declared completion | 17 Jan 2017 — registry date, not a handover promise |
| Units in the project | 58 |
| Project area | 5 860 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 1196 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 11 technical inspections for this project, from 27 Jun 2012 at 21.0% to 6 Mar 2017 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 6 Mar 2017 | 100.0% | +24.2 pp |
| 12 Oct 2016 | 75.8% | +15.6 pp |
| 26 May 2016 | 60.2% | +10.8 pp |
| 23 Feb 2016 | 49.4% | +2.4 pp |
| 25 Oct 2015 | 47.0% | +1.6 pp |
| 30 Jun 2015 | 45.5% | +5.4 pp |
| 18 Feb 2015 | 40.1% | +5.9 pp |
| 6 Nov 2014 | 34.2% | +7.6 pp |
| 16 Jul 2014 | 26.7% | +5.8 pp |
| 17 Mar 2014 | 20.9% | -0.0 pp |
| 27 Jun 2012 | 21.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (6) | 6 | AED 615k | 806 | 750 sqft | — | — |
| 3-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 30 Jul 2026 | 1 B/R Flat — Mazaya 19 | Ready | 750 sqft | AED 610 000 | 814 |
| 18 Mar 2026 | 1 B/R Flat — Mazaya 19 | Ready | 877 sqft | AED 700 000 | 799 |
| 25 Feb 2026 | 3 B/R Flat — Mazaya 19 | Ready | 1 903 sqft | AED 1 200 000 | 631 |
| 23 Jan 2026 | 1 B/R Flat — Mazaya 19 | Ready | 750 sqft | AED 620 000 | 827 |
| 15 Jan 2026 | 1 B/R Flat — Mazaya 19 | Ready | 750 sqft | AED 595 000 | 794 |
| 23 Dec 2025 | 3 B/R Flat — Mazaya 19 | Ready | 1 903 sqft | AED 1 300 000 | 683 |
| 18 Nov 2025 | 1 B/R Flat — Mazaya 19 | Ready | 732 sqft | AED 595 000 | 813 |
| 10 Nov 2025 | 1 B/R Flat — Mazaya 19 | Ready | 917 sqft | AED 665 000 | 726 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Qpoint Liwan-Plot R051: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 5 | AED 620k | 799 | AED 3.73M |
| 2025 | 9 | AED 615k | 694 | AED 6.58M |
| 2024 | 7 | AED 595k | 675 | AED 4.20M |
| 2023 | 9 | AED 700k | 489 | AED 5.88M |
| 2022 | 3 | — | — | AED 945k |
| 2021 | 3 | — | — | AED 1.03M |
| 2020 | 1 | — | — | AED 600k |
| 2019 | 12 | AED 729k | 457 | AED 8.79M |
| 2018 | 4 | — | — | AED 2.38M |
| 2017 | 10 | AED 842k | 738 | AED 8.65M |
| 2016 | 16 | AED 592k | 732 | AED 11.06M |
| 2015 | 7 | AED 549k | 695 | AED 4.16M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent by year, 2018–2025
1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | 1-bed flat |
|---|---|
| 2025 | 45k |
| 2024 | 38k |
| 2023 | 34k |
| 2022 | 29k |
| 2021 | 27k |
| 2020 | 32k |
| 2019 | 38k |
| 2018 | 44k |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 8 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Qpoint Liwan-Plot R051. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Qpoint Liwan-Plot R052 Finished · Al Mazaya Real Estate Fz-Llc |
49 m | 100% |
| Qpoint Liwan-Plot R050 Finished · Al Mazaya Real Estate Fz-Llc |
56 m | 100% |
| Qpoint Liwan-Plot R053 Finished · Al Mazaya Real Estate Fz-Llc |
98 m | 100% |
| Qpoint Liwan-Plot R048 Finished · Al Mazaya Real Estate Fz-Llc |
119 m | 100% |
| Qline (Qpoint Phaseii) 3c-Lw-R-054 Finished · Al Mazaya Emirates Real Estate Development Owned By Mazaya Alghad One Person Company L.L.C |
149 m | 100% |
| Qpoint Liwan-Plot R055 Finished · Al Mazaya Real Estate Fz-Llc |
165 m | 100% |
| Qpoint Liwan-Plot R047 Finished · Al Mazaya Real Estate Fz-Llc |
176 m | 100% |
| Qpoint Liwan-Plot R100 Finished · Al Mazaya Real Estate Fz-Llc |
204 m | 100% |
| Qpoint Liwan-Plot R046 Finished · Al Mazaya Real Estate Fz-Llc |
235 m | 100% |
| Qpoint Liwan-Plot R099 Finished · Al Mazaya Real Estate Fz-Llc |
240 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Liwan1
Questions about Qpoint Liwan-Plot R051
Who is the developer of Qpoint Liwan-Plot R051?
The Dubai Land Department project registry lists Al Mazaya Real Estate Fz-Llc as the developer of Qpoint Liwan-Plot R051.
Is Qpoint Liwan-Plot R051 completed?
The DLD registry status of Qpoint Liwan-Plot R051 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 17 Jan 2017 — a registry date, not a handover promise.
How many homes are in Qpoint Liwan-Plot R051?
The DLD registry records 58 units in Qpoint Liwan-Plot R051.
What is the price per square foot in Qpoint Liwan-Plot R051?
Over the last 12 complete months the median registered sale in Qpoint Liwan-Plot R051 was AED 642k, or AED 796 per sqft, from 8 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Qpoint Liwan-Plot R051?
The escrow agent recorded by DLD for Qpoint Liwan-Plot R051 is Mashreq Bank Psc.
Where is Qpoint Liwan-Plot R051?
Qpoint Liwan-Plot R051 is in the Liwan1 community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Qpoint Liwan-Plot R052, about 49 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗