Data Dubai

Qpoint Liwan-Plot R081

Qpoint Liwan-Plot R081Finished100% built95 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Qpoint Liwan-Plot R081: ChatGPT · Claude · Perplexity

Qpoint Liwan-Plot R081 is a project by Al Mazaya Real Estate Fz-Llc, recorded at 100% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
0
all property types · trailing 12 complete months
DLD verified
Off-plan share
—
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAl Mazaya Real Estate Fz-Llc
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD10 Jun 2009
Construction started19 Mar 2009
Declared completion2 Apr 2020 — registry date, not a handover promise
Units in the project95
Project area8 305 sqm
Escrow agentMashreq Bank Psc
Project number1207

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 21 technical inspections for this project, from 9 Sep 2012 at 36.1% to 2 Apr 2020 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2020-04-022012-09-092020-04-02

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
2 Apr 2020100.0% +1.0 pp
11 Feb 201999.0% +0.8 pp
5 Nov 201898.2% +2.2 pp
25 Jul 201896.0% +3.5 pp
15 Apr 201892.5% +3.8 pp
20 Dec 201788.7% +3.6 pp
9 Oct 201785.1% +5.0 pp
20 Jul 201780.1% +8.5 pp
6 Mar 201771.6% +0.9 pp
13 Oct 201670.8% +0.0 pp
29 May 201670.8% +0.0 pp
9 Feb 201670.8% +5.5 pp
5 Oct 201565.2% +6.2 pp
20 Apr 201559.0% +7.5 pp
30 Nov 201451.6% +4.3 pp
18 Aug 201447.2% +1.6 pp
2 Apr 201445.6% +0.1 pp
25 Dec 201345.5% +0.0 pp
19 Jun 201345.5% +3.3 pp
5 Feb 201342.2% +6.1 pp
9 Sep 201236.1% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Qpoint Liwan-Plot R081: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0122015202301220152023

registered sales per calendar year; the current year is incomplete

YearSalesMedian priceMedian AED/sqftTotal registered value
20232— —AED 1.18M
20151— —AED 485k

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 0 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Qpoint Liwan-Plot R081. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Qpoint Liwan-Plot R082
Finished · Al Mazaya Real Estate Fz-Llc
50 m100%95
Qpoint Liwan-Plot R072
Finished · Al Mazaya Real Estate Fz-Llc
88 m100%61
Qpoint Liwan-Plot R073
Finished · Al Mazaya Real Estate Fz-Llc
92 m100%61
Qpoint Liwan-Plot R071
Finished · Al Mazaya Real Estate Fz-Llc
110 m100%61
Qpoint Liwan-Plot R070
Finished · Al Mazaya Real Estate Fz-Llc
146 m100%61
Qpoint Liwan-Plot R069
Finished · Al Mazaya Real Estate Fz-Llc
189 m100%61
Qline (Qpoint Phase Ii) R085
Finished · Al Mazaya Emirates Real Estate Development Owned By Mazaya Alghad One Person Company L.L.C
228 m100%99
Qpoint Liwan-Plot R068
Finished · Al Mazaya Real Estate Fz-Llc
234 m100%62
Qpoint Liwan-Plot R096
Finished · Al Mazaya Holding Company
273 m100%55
Qpoint Liwan-Plot R097
Finished · Al Mazaya Real Estate Fz-Llc
275 m100%55

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Liwan1

Questions about Qpoint Liwan-Plot R081

Who is the developer of Qpoint Liwan-Plot R081?

The Dubai Land Department project registry lists Al Mazaya Real Estate Fz-Llc as the developer of Qpoint Liwan-Plot R081.

Is Qpoint Liwan-Plot R081 completed?

The DLD registry status of Qpoint Liwan-Plot R081 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 2 Apr 2020 — a registry date, not a handover promise.

How many homes are in Qpoint Liwan-Plot R081?

The DLD registry records 95 units in Qpoint Liwan-Plot R081.

What is the price per square foot in Qpoint Liwan-Plot R081?

Too few sales were registered in Qpoint Liwan-Plot R081 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Qpoint Liwan-Plot R081?

The escrow agent recorded by DLD for Qpoint Liwan-Plot R081 is Mashreq Bank Psc.

Where is Qpoint Liwan-Plot R081?

Qpoint Liwan-Plot R081 is in the Liwan1 community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Qpoint Liwan-Plot R082, about 50 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Qpoint Liwan-Plot R081 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/qpoint-liwan-plot-r081/”. Reuse is permitted with attribution.