Qpoint Liwan-Plot R068
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Qpoint Liwan-Plot R068: ChatGPT · Claude · Perplexity
Qpoint Liwan-Plot R068 is a project by Al Mazaya Real Estate Fz-Llc, recorded at 100% complete at its last Dubai Land Department inspection. 6 sales registered in the trailing 12 months at a median AED 580k (630 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 6 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Al Mazaya Real Estate Fz-Llc |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 10 Jun 2009 |
| Construction started | 28 May 2008 |
| Declared completion | 26 Sep 2013 — registry date, not a handover promise |
| Units in the project | 62 |
| Project area | 5 631 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 1221 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Apr 2026: in the 6 months since, there were no registered sales at all, so no month reached the five registered sales a median needs · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 2 technical inspections for this project, from 11 Nov 2012 at 99.0% to 15 Sep 2013 at 99.3%. Over the inspections since 11 Nov 2012 it moved 0.03 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 15 Sep 2013 | 99.3% | +0.3 pp |
| 11 Nov 2012 | 99.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments insufficient data | 4 | — | — | — | — | — |
| 2-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 22 Apr 2026 | 1 B/R Flat — MAZAYA 27 | Ready | 889 sqft | AED 640 000 | 720 |
| 7 Apr 2026 | 1 B/R Flat — MAZAYA 27 | Ready | 856 sqft | AED 520 000 | 608 |
| 7 Apr 2026 | 1 B/R Flat — MAZAYA 27 | Ready | 833 sqft | AED 520 000 | 624 |
| 7 Apr 2026 | 1 B/R Flat — MAZAYA 27 | Ready | 845 sqft | AED 520 000 | 615 |
| 7 Apr 2026 | 2 B/R Flat — MAZAYA 27 | Ready | 1 117 sqft | AED 710 000 | 636 |
| 11 Dec 2025 | 2 B/R Flat — MAZAYA 27 | Ready | 1 117 sqft | AED 800 000 | 716 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Qpoint Liwan-Plot R068: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Apr 2026 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 5 | AED 520k | 624 | AED 2.91M |
| 2025 | 4 | — | — | AED 2.67M |
| 2024 | 7 | AED 500k | 516 | AED 3.82M |
| 2023 | 4 | — | — | AED 2.05M |
| 2022 | 3 | — | — | AED 1.30M |
| 2021 | 2 | — | — | AED 680k |
| 2020 | 1 | — | — | AED 330k |
| 2019 | 3 | — | — | AED 1.91M |
| 2017 | 2 | — | — | AED 1.32M |
| 2016 | 14 | AED 694k | 702 | AED 10.59M |
| 2015 | 22 | AED 621k | 701 | AED 15.41M |
| 2014 | 38 | AED 504k | 681 | AED 14.91M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent by year, 2015–2025
1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | 1-bed flat |
|---|---|
| 2025 | 48k |
| 2024 | 41k |
| 2023 | 35k |
| 2022 | 30k |
| 2021 | 28k |
| 2020 | 30k |
| 2019 | 35k |
| 2018 | 40k |
| 2017 | 50k |
| 2016 | 52k |
| 2015 | 52k |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Apr 2026 | 5 | AED 520k | 624 | 615 – 636 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 6 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Qpoint Liwan-Plot R068. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Qpoint Liwan-Plot R069 Finished · Al Mazaya Real Estate Fz-Llc |
50 m | 100% |
| Qpoint Liwan-Plot R070 Finished · Al Mazaya Real Estate Fz-Llc |
100 m | 100% |
| Qpoint Liwan-Plot R071 Finished · Al Mazaya Real Estate Fz-Llc |
150 m | 100% |
| Qpoint Liwan-Plot R082 Finished · Al Mazaya Real Estate Fz-Llc |
189 m | 100% |
| Qpoint Liwan-Plot R072 Finished · Al Mazaya Real Estate Fz-Llc |
200 m | 100% |
| Qpoint Liwan-Plot R081 Finished · Al Mazaya Real Estate Fz-Llc |
234 m | 100% |
| Qpoint Liwan-Plot R073 Finished · Al Mazaya Real Estate Fz-Llc |
250 m | 100% |
| Qline (Qpoint Phase Ii) R085 Finished · Al Mazaya Emirates Real Estate Development Owned By Mazaya Alghad One Person Company L.L.C |
267 m | 100% |
| Qpoint Liwan-Plot R100 Finished · Al Mazaya Real Estate Fz-Llc |
365 m | 100% |
| Qpoint Liwan-Plot R099 Finished · Al Mazaya Real Estate Fz-Llc |
370 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Liwan1
Questions about Qpoint Liwan-Plot R068
Who is the developer of Qpoint Liwan-Plot R068?
The Dubai Land Department project registry lists Al Mazaya Real Estate Fz-Llc as the developer of Qpoint Liwan-Plot R068.
Is Qpoint Liwan-Plot R068 completed?
The DLD registry status of Qpoint Liwan-Plot R068 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 26 Sep 2013 — a registry date, not a handover promise.
How many homes are in Qpoint Liwan-Plot R068?
The DLD registry records 62 units in Qpoint Liwan-Plot R068.
What is the price per square foot in Qpoint Liwan-Plot R068?
Over the last 12 complete months the median registered sale in Qpoint Liwan-Plot R068 was AED 580k, or AED 630 per sqft, from 6 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Qpoint Liwan-Plot R068?
The escrow agent recorded by DLD for Qpoint Liwan-Plot R068 is Mashreq Bank Psc.
Where is Qpoint Liwan-Plot R068?
Qpoint Liwan-Plot R068 is in the Liwan1 community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Qpoint Liwan-Plot R069, about 50 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗