Data Dubai

Royal Park South 1

Royal Park South 1Finished100% built35 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Royal Park South 1: ChatGPT · Claude · Perplexity

Royal Park South 1 is a project by Metrical Real Estate Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 5 sales registered in the trailing 12 months at a median AED 4.90M. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 4.90M
≈ US$ 1.33M · typical range AED 4.50M – AED 5.00M
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
5 +150.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 5 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperMetrical Real Estate Development L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD21 Mar 2022
Construction started1 Dec 2021
Declared completion25 Jun 2023 — registry date, not a handover promise
Units in the project35
Project area7 884 sqm
Escrow agentDubai Islamic Bank (Public Joint Stock Company)
Project number2365

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Apr 2023: in the 42 months since, no month reached the five registered sales a median needs (16 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 3 technical inspections for this project, from 3 Mar 2022 at 13.2% to 25 May 2023 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2023-06-252022-03-032023-05-25

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
25 May 2023100.0% +22.1 pp
9 Dec 202277.9% +64.6 pp
3 Mar 202213.2% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
4-bedroom apartments low sample (5) 5AED 4.90M — 2 031 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
16 Nov 20264 B/R VillaReady 260 sqftAED 433 369 1 669
9 Oct 20264 B/R VillaReady 2 031 sqftAED 4 500 000 2 216
4 Sep 20264 B/R VillaReady 2 997 sqftAED 5 000 000 1 669
15 Jun 20264 B/R VillaReady 2 030 sqftAED 5 000 000 2 464
25 May 20264 B/R VillaReady 2 040 sqftAED 3 980 000 1 951
2 Feb 20264 B/R VillaReady 305 sqftAED 4 900 000 16 040

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Royal Park South 1: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

010202013202120222023202420252026010202013202120222023202420252026

registered sales per calendar year; the current year is incomplete

By month

024MayJunJulAugSepOctNovDecJanFebMarApr024JunAugOctDecFebApr

registered sales per month, May 2023 – Apr 2024

YearSalesMedian priceMedian AED/sqftTotal registered value
20265AED 4.90M —AED 23.38M
20252— —AED 10.95M
20243— —AED 12.90M
202325AED 3.15M 1 303AED 77.94M
202222AED 2.67M 1 244AED 60.67M
20212— —AED 24.10M
20132— —AED 16.72M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Apr 20235 AED 3.20M1 292 1 129 – 1 479
Mar 20236 AED 3.15M1 245 1 071 – 1 478
Feb 20232 —— —
Jan 20235 AED 2.58M1 220 1 133 – 1 272
Dec 202211 AED 2.66M1 271 1 130 – 1 331
Nov 202210 AED 2.70M1 039 843 – 1 266

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 5 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Jumeirah Village Circle

Questions about Royal Park South 1

Who is the developer of Royal Park South 1?

The Dubai Land Department project registry lists Metrical Real Estate Development L.L.C as the developer of Royal Park South 1.

Is Royal Park South 1 completed?

The DLD registry status of Royal Park South 1 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 25 Jun 2023 — a registry date, not a handover promise.

How many homes are in Royal Park South 1?

The DLD registry records 35 units in Royal Park South 1.

What is the price per square foot in Royal Park South 1?

Too few sales were registered in Royal Park South 1 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Royal Park South 1?

The escrow agent recorded by DLD for Royal Park South 1 is Dubai Islamic Bank (Public Joint Stock Company).

Where is Royal Park South 1?

Royal Park South 1 is in the Jumeirah Village Circle community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Royal Park South 1 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/royal-park-south-1/”. Reuse is permitted with attribution.