Sobha Hartland - The Crest
Data through 7 Sep 2026 · DLD project registry and registered sales · trailing 12 months Sep 2025 – Aug 2026 · rebuilt daily
Sobha Hartland - The Crest is a project by Sobha L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 258 sales registered in the trailing 12 months at a median AED 1.56M (2 227 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 7 Sep 2026 · sample 258 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Sobha L.L.C | DLD verified |
| Status | Finished | DLD verified |
| Construction progress | 100% — at the last DLD inspection | DLD verified |
| Registered with DLD | 14 Sep 2022 | DLD verified |
| Construction started | 1 Nov 2021 | DLD verified |
| Declared completion | 31 Dec 2025 — registry date, not a handover promise | DLD verified |
| Units in the project | 1 518 | DLD verified |
| Project area | 120 998 sqm | DLD verified |
| Escrow agent | Dubai Islamic Bank (Public Joint Stock Company) | DLD verified |
| Project number | 2447 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 7 Sep 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 7 Sep 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 9 technical inspections for this project, from 19 Aug 2022 at 20.9% to 17 Jun 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 17 Jun 2025 | 100.0% | +3.8 pp |
| 6 Mar 2025 | 96.2% | +4.7 pp |
| 11 Nov 2024 | 91.4% | +6.2 pp |
| 4 Jul 2024 | 85.2% | +27.1 pp |
| 29 Dec 2023 | 58.1% | +10.1 pp |
| 14 Aug 2023 | 48.0% | +10.1 pp |
| 13 Mar 2023 | 37.9% | +6.7 pp |
| 1 Dec 2022 | 31.2% | +10.3 pp |
| 19 Aug 2022 | 20.9% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 7 Sep 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Aug 2026 | 13 | AED 2.40M | 2 106 | 2 021 – 2 195 |
| Jul 2026 | 11 | AED 1.87M | 2 101 | 2 059 – 2 245 |
| Jun 2026 | 10 | AED 1.29M | 1 952 | 1 736 – 2 228 |
| May 2026 | 6 | AED 1.40M | 2 208 | 2 152 – 2 245 |
| Apr 2026 | 16 | AED 1.61M | 2 320 | 2 099 – 2 508 |
| Mar 2026 | 15 | AED 2.60M | 2 268 | 2 137 – 2 452 |
| Feb 2026 | 30 | AED 1.72M | 2 271 | 2 157 – 2 328 |
| Jan 2026 | 29 | AED 1.92M | 2 250 | 2 195 – 2 390 |
| Dec 2025 | 43 | AED 1.38M | 2 272 | 2 116 – 2 412 |
| Nov 2025 | 25 | AED 2.20M | 2 246 | 2 151 – 2 318 |
| Oct 2025 | 31 | AED 1.38M | 2 249 | 2 152 – 2 322 |
| Sep 2025 | 29 | AED 1.50M | 2 196 | 2 044 – 2 262 |
| Aug 2025 | 30 | AED 1.50M | 2 231 | 2 069 – 2 398 |
Source: Registered DLD transactions · Data through 7 Sep 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments | 140 | AED 1.32M | 2 287 | 587 sqft | — | — |
| 2-bedroom apartments | 85 | AED 2.48M | 2 190 | 1 272 sqft | — | — |
| 3-bedroom apartments | 25 | AED 3.30M | 2 117 | 1 559 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 7 Sep 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 130 | AED 1.70M | 2 209 | AED 274.25M |
| 2025 | 263 | AED 1.44M | 2 185 | AED 483.20M |
| 2024 | 168 | AED 1.40M | 2 017 | AED 279.04M |
| 2023 | 623 | AED 1.33M | 1 925 | AED 1.04B |
| 2022 | 882 | AED 1.32M | 1 925 | AED 1.45B |
Source: Registered DLD transactions · Data through 7 Sep 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 27 Aug 2026 | 3 B/R Flat — Sobha Hartland - The Crest | Ready | 1 559 sqft | AED 3 400 000 | 2 181 |
| 27 Aug 2026 | 2 B/R Flat — Sobha Hartland - The Crest | Ready | 807 sqft | AED 1 700 000 | 2 106 |
| 27 Aug 2026 | 2 B/R Flat — Sobha Hartland - The Crest | Ready | 1 272 sqft | AED 2 650 000 | 2 084 |
| 21 Aug 2026 | 1 B/R Flat — Sobha Hartland - The Crest | Ready | 682 sqft | AED 1 378 000 | 2 021 |
| 18 Aug 2026 | 1 B/R Flat — Sobha Hartland - The Crest | Ready | 512 sqft | AED 1 140 000 | 2 228 |
| 17 Aug 2026 | 1 B/R Flat — Sobha Hartland - The Crest | Ready | 684 sqft | AED 1 400 000 | 2 047 |
| 17 Aug 2026 | 3 B/R Flat — Sobha Hartland - The Crest | Ready | 1 559 sqft | AED 2 900 000 | 1 860 |
| 17 Aug 2026 | 2 B/R Flat — Sobha Hartland - The Crest | Ready | 1 276 sqft | AED 2 800 000 | 2 195 |
| 10 Aug 2026 | 2 B/R Flat — Sobha Hartland - The Crest | Ready | 1 272 sqft | AED 2 400 000 | 1 887 |
| 7 Aug 2026 | 2 B/R Flat — Sobha Hartland - The Crest | Ready | 1 046 sqft | AED 2 300 000 | 2 199 |
| 6 Aug 2026 | 3 B/R Flat — Sobha Hartland - The Crest | Ready | 1 469 sqft | AED 2 900 000 | 1 974 |
| 4 Aug 2026 | 2 B/R Flat — Sobha Hartland - The Crest | Ready | 1 276 sqft | AED 2 800 000 | 2 195 |
Source: Registered DLD transactions · Data through 7 Sep 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Sobha Hartland - The Crest — Dubai Data, Continental Club Property, data through 7 Sep 2026, https://datadubai.ae/projects/sobha-hartland-the-crest/”. Reuse is permitted with attribution.