Data Dubai

The East Crest By Meteora

The East Crest By MeteoraFinished100% built121 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about The East Crest By Meteora: ChatGPT · Claude · Perplexity

The East Crest By Meteora is a project by Meteora Real Estate Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 20 sales registered in the trailing 12 months at a median AED 872k (1 252 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 872k -4.2% y/y
≈ US$ 237k · typical range AED 800k – AED 976k
DLD verified
Median price per sqft
AED 1 252/sqft -3.5% y/y
typical range 1 136 – 1 300 AED/sqft
DLD verified
Registered sales
20 +33.3% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 20 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperMeteora Real Estate Development L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD27 Apr 2023
Construction started13 Mar 2023
Declared completion13 Mar 2025 — registry date, not a handover promise
Units in the project121
Project area7 915 sqm
Escrow agentAbu Dhabi Commercial Bank
Project number2558

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2024: in the 26 months since, no month reached the five registered sales a median needs (33 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 5 technical inspections for this project, from 23 Jan 2023 at 27.1% to 18 Nov 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2025-03-132023-01-232025-11-18

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
18 Nov 2025100.0% +13.5 pp
27 Aug 202486.5% +15.9 pp
8 May 202470.6% +18.4 pp
15 Nov 202352.2% +25.2 pp
23 Jan 202327.1% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments low sample (17) 17AED 850k 1 252 737 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
16 Oct 20261 B/R FlatReady 910 sqftAED 850 000 934
16 Sep 20261 B/R FlatReady 769 sqftAED 873 500 1 136
10 Sep 20261 B/R FlatReady 615 sqftAED 770 000 1 252
13 Aug 20261 B/R FlatReady 615 sqftAED 800 000 1 300
3 Aug 20261 B/R FlatReady 615 sqftAED 800 000 1 301
16 Jun 20261 B/R FlatReady 615 sqftAED 795 000 1 293
15 Jun 20261 B/R FlatReady 619 sqftAED 870 000 1 405
19 May 20261 B/R FlatReady 772 sqftAED 910 000 1 179
18 May 20261 B/R FlatReady 615 sqftAED 770 000 1 252
5 May 20261 B/R FlatReady 737 sqftAED 895 000 1 214
4 May 20261 B/R FlatReady 724 sqftAED 821 106 1 134
22 Apr 2026ShopReady 854 sqftAED 2 436 750 —
12 Feb 20261 B/R FlatReady 615 sqftAED 950 000 1 544
22 Jan 20261 B/R FlatReady 772 sqftAED 791 829 1 026
31 Dec 2025ShopReady 1 092 sqftAED 2 807 802 —
22 Dec 20251 B/R FlatReady 758 sqftAED 980 000 1 293
19 Dec 2025ShopReady 1 135 sqftAED 2 417 550 —
18 Dec 20251 B/R FlatReady 758 sqftAED 990 000 1 306
18 Dec 20251 B/R FlatReady 760 sqftAED 975 000 1 282
16 Dec 20251 B/R FlatReady 758 sqftAED 816 596 1 077

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for The East Crest By Meteora: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

025507520142023202420252026025507520142023202420252026

registered sales per calendar year; the current year is incomplete

By month

024SepOctNovDecJanFebMarAprMayJunJulAug024OctDecFebAprJunAug

registered sales per month, Sep 2024 – Aug 2025

YearSalesMedian priceMedian AED/sqftTotal registered value
202614AED 836k 1 252AED 13.33M
202519AED 975k 1 293AED 21.02M
202427AED 821k 1 160AED 21.89M
202391AED 767k 1 125AED 70.75M
20141— —AED 10.95M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Aug 20245 AED 821k1 135 1 114 – 1 160
Jul 20240 —— —
Jun 20240 —— —
May 20240 —— —
Apr 20244 —— —
Mar 20242 —— —
Feb 20241 —— —
Jan 202412 AED 758k1 168 1 117 – 1 182
Dec 202340 AED 762k1 137 1 108 – 1 185
Nov 202349 AED 775k1 120 1 072 – 1 174

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Jumeirah Village Circle

Questions about The East Crest By Meteora

Who is the developer of The East Crest By Meteora?

The Dubai Land Department project registry lists Meteora Real Estate Development L.L.C as the developer of The East Crest By Meteora.

Is The East Crest By Meteora completed?

The DLD registry status of The East Crest By Meteora is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 13 Mar 2025 — a registry date, not a handover promise.

How many homes are in The East Crest By Meteora?

The DLD registry records 121 units in The East Crest By Meteora.

What is the price per square foot in The East Crest By Meteora?

Over the last 12 complete months the median registered sale in The East Crest By Meteora was AED 872k, or AED 1 252 per sqft, from 20 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for The East Crest By Meteora?

The escrow agent recorded by DLD for The East Crest By Meteora is Abu Dhabi Commercial Bank.

Where is The East Crest By Meteora?

The East Crest By Meteora is in the Jumeirah Village Circle community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “The East Crest By Meteora — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/the-east-crest-by-meteora/”. Reuse is permitted with attribution.