The Lx
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
The Lx is a project by Mulk Properties L.L.C, recorded at 5% complete at its last Dubai Land Department inspection. 51 sales registered in the trailing 12 months at a median AED 2.41M. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 51 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Mulk Properties L.L.C | DLD verified |
| Status | Active | DLD verified |
| Construction progress | 5% — at the last DLD inspection | DLD verified |
| Registered with DLD | 27 May 2025 | DLD verified |
| Construction started | 1 Jun 2025 | DLD verified |
| Declared completion | 30 Aug 2027 — registry date, not a handover promise | DLD verified |
| Units in the project | 74 | DLD verified |
| Project area | 12 188 sqm | DLD verified |
| Escrow agent | United Bank Limited (Management Office) | DLD verified |
| Project number | 3772 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 2 technical inspections for this project, from 22 May 2025 at 0.0% to 4 Jun 2026 at 4.9%. Since 22 May 2025 the recorded percentage has moved 0.39 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 4 Jun 2026 | 4.9% | +4.9 pp |
| 22 May 2025 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 38 | AED 2.47M | — | AED 100.55M |
| 2025 | 13 | AED 2.31M | — | AED 30.75M |
| 2018 | 1 | — | — | AED 21.08M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 14 Aug 2026 | Office — The LX | Off-plan | 1 231 sqft | AED 2 277 664 | — |
| 3 Aug 2026 | Office — The LX | Off-plan | 1 683 sqft | AED 3 017 600 | — |
| 27 Jul 2026 | Office — The LX | Off-plan | 1 946 sqft | AED 3 599 915 | — |
| 8 Jun 2026 | Office — The LX | Off-plan | 1 471 sqft | AED 2 600 000 | — |
| 15 May 2026 | Office — The LX | Off-plan | 2 694 sqft | AED 4 710 895 | — |
| 13 May 2026 | Office — The LX | Off-plan | 1 196 sqft | AED 2 094 662 | — |
| 13 May 2026 | Office — The LX | Off-plan | 1 049 sqft | AED 1 838 095 | — |
| 6 May 2026 | Office — The LX | Off-plan | 1 651 sqft | AED 2 889 950 | — |
| 30 Apr 2026 | Office — The LX | Off-plan | 1 243 sqft | AED 2 563 200 | — |
| 30 Apr 2026 | Office — The LX | Off-plan | 1 211 sqft | AED 2 524 800 | — |
| 24 Apr 2026 | Office — The LX | Off-plan | 1 096 sqft | AED 2 337 700 | — |
| 23 Apr 2026 | Office — The LX | Off-plan | 1 122 sqft | AED 2 357 100 | — |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Arjan
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “The Lx — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/the-lx/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for The Lx. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.