Tower 108
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Tower 108: ChatGPT · Claude · Perplexity
Tower 108 is a project by Damac Development(L L C), recorded at 100% complete at its last Dubai Land Department inspection. 34 sales registered in the trailing 12 months at a median AED 820k (1 035 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 34 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Damac Development(L L C) |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 3 Apr 2014 |
| Construction started | 1 Jun 2014 |
| Declared completion | 24 Mar 2019 — registry date, not a handover promise |
| Units in the project | 418 |
| Project area | 34 186 sqm |
| Escrow agent | Abu Dhabi Islamic Bank |
| Project number | 1499 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Apr 2026: in the 6 months since, no month reached the five registered sales a median needs (12 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 13 technical inspections for this project, from 10 Dec 2014 at 8.8% to 24 Mar 2019 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 24 Mar 2019 | 100.0% | +3.2 pp |
| 12 Nov 2018 | 96.8% | +1.8 pp |
| 14 May 2018 | 95.0% | +4.3 pp |
| 10 Jan 2018 | 90.7% | +10.6 pp |
| 10 Aug 2017 | 80.1% | +14.1 pp |
| 11 May 2017 | 66.1% | +15.4 pp |
| 25 Dec 2016 | 50.7% | +17.3 pp |
| 28 Aug 2016 | 33.4% | +11.7 pp |
| 26 Apr 2016 | 21.7% | +6.1 pp |
| 13 Jan 2016 | 15.6% | +3.6 pp |
| 24 Aug 2015 | 12.0% | +2.3 pp |
| 15 Apr 2015 | 9.7% | +0.9 pp |
| 10 Dec 2014 | 8.8% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (13) | 13 | AED 540k | 1 248 | 438 sqft | — | — |
| 1-bedroom apartments low sample (15) | 15 | AED 910k | 939 | 892 sqft | — | — |
| 2-bedroom apartments low sample (6) | 6 | AED 1.26M | 959 | 1 326 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 19 Nov 2026 | 1 B/R Flat | Ready | 1 013 sqft | AED 840 000 | 830 |
| 17 Nov 2026 | 1 B/R Flat | Ready | 1 012 sqft | AED 825 000 | 815 |
| 6 Nov 2026 | 1 B/R Flat | Ready | 676 sqft | AED 700 000 | 1 036 |
| 26 Oct 2026 | Studio Hotel Apartment | Ready | 664 sqft | AED 491 683 | 741 |
| 7 Oct 2026 | Studio Flat | Ready | 452 sqft | AED 400 000 | 885 |
| 5 Oct 2026 | 1 B/R Flat | Ready | 890 sqft | AED 800 000 | 899 |
| 31 Jul 2026 | 2 B/R Flat | Ready | 1 367 sqft | AED 1 250 000 | 915 |
| 14 Jul 2026 | Studio Flat | Ready | 452 sqft | AED 450 000 | 996 |
| 13 Jul 2026 | Studio Flat | Ready | 433 sqft | AED 500 000 | 1 155 |
| 10 Jul 2026 | 1 B/R Flat | Ready | 943 sqft | AED 850 000 | 902 |
| 18 Jun 2026 | 1 B/R Flat | Ready | 821 sqft | AED 750 000 | 913 |
| 3 Jun 2026 | 2 B/R Flat | Ready | 1 310 sqft | AED 1 275 000 | 974 |
| 3 Jun 2026 | Studio Flat | Ready | 438 sqft | AED 458 618 | 1 047 |
| 3 Jun 2026 | 1 B/R Flat | Ready | 943 sqft | AED 1 009 000 | 1 069 |
| 19 May 2026 | 2 B/R Flat | Ready | 1 341 sqft | AED 1 158 300 | 864 |
| 29 Apr 2026 | 1 B/R Flat | Ready | 1 834 sqft | AED 1 010 000 | 551 |
| 27 Apr 2026 | 2 B/R Flat | Ready | 1 164 sqft | AED 1 100 000 | 945 |
| 13 Apr 2026 | 1 B/R Flat | Ready | 820 sqft | AED 910 000 | 1 110 |
| 10 Apr 2026 | 1 B/R Flat | Ready | 818 sqft | AED 860 000 | 1 051 |
| 8 Apr 2026 | Studio Flat | Ready | 433 sqft | AED 540 000 | 1 248 |
| 18 Mar 2026 | 1 B/R Flat | Ready | 944 sqft | AED 1 000 000 | 1 060 |
| 5 Mar 2026 | Studio Flat | Ready | 452 sqft | AED 590 000 | 1 306 |
| 10 Feb 2026 | 1 B/R Flat | Ready | 676 sqft | AED 780 000 | 1 154 |
| 28 Jan 2026 | 2 B/R Flat | Ready | 1 367 sqft | AED 1 500 000 | 1 098 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Tower 108: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 24 | AED 855k | 1 022 | AED 20.56M |
| 2025 | 64 | AED 815k | 1 086 | AED 53.78M |
| 2024 | 54 | AED 805k | 984 | AED 45.02M |
| 2023 | 71 | AED 753k | 894 | AED 57.41M |
| 2022 | 35 | AED 660k | 728 | AED 23.27M |
| 2021 | 67 | AED 725k | 749 | AED 51.00M |
| 2020 | 13 | AED 460k | 680 | AED 8.70M |
| 2019 | 34 | AED 988k | 1 126 | AED 34.75M |
| 2018 | 20 | AED 1.37M | 1 046 | AED 22.72M |
| 2017 | 69 | AED 1.04M | 1 029 | AED 72.46M |
| 2016 | 20 | AED 646k | 1 301 | AED 14.53M |
| 2015 | 11 | AED 703k | 1 522 | AED 8.28M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2019–2026
1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | Studio | 1-bed flat | 2-bed flat | Gross yield |
|---|---|---|---|---|
| 2026 YTD | 42k | 65k | 90k | — |
| 2025 | 47k | 70k | 100k | 8.06% |
| 2024 | 45k | 70k | 98k | 8.54% |
| 2023 | 42k | 62k | 88k | 8.29% |
| 2022 | 34k | 55k | 70k | 8.40% |
| 2021 | 29k | 48k | 65k | 6.92% |
| 2020 | 35k | 54k | 75k | — |
| 2019 | — | 68k | — | — |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Apr 2026 | 5 | AED 910k | 1 051 | 945 – 1 110 |
| Mar 2026 | 2 | — | — | — |
| Feb 2026 | 1 | — | — | — |
| Jan 2026 | 4 | — | — | — |
| Dec 2025 | 2 | — | — | — |
| Nov 2025 | 8 | AED 662k | 1 036 | 970 – 1 341 |
| Oct 2025 | 4 | — | — | — |
| Sep 2025 | 7 | AED 832k | 1 023 | 958 – 1 219 |
| Aug 2025 | 4 | — | — | — |
| Jul 2025 | 12 | AED 838k | 1 104 | 1 038 – 1 201 |
| Jun 2025 | 3 | — | — | — |
| May 2025 | 7 | AED 770k | 1 139 | 1 041 – 1 296 |
| Apr 2025 | 2 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Tower 108. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Ghalia Finished · Damac Development(L L C) |
147 m | 100% |
| Masaar Residences Finished · Masaar Tower Properties Development L.L.C |
241 m | 100% |
| Dusit Princess Rijas Active · Aces Property Development L.L.C |
253 m | 64% |
| Indigo Ville 8 Finished · Venus Properties Investment Ltd |
268 m | 100% |
| Prudential Towers Cancelled · Al Tajir Real Estate (L.L.C) |
316 m | 39% |
| Shamal Terraces 4 Finished · Lootah Real Estate Development L.L.C |
324 m | 100% |
| Shamal Residences 2 Finished · Lootah Real Estate Development L.L.C |
335 m | 100% |
| Shamal Waves Finished · Lootah Real Estate Development L.L.C |
352 m | 100% |
| Shamal Terraces 2 Finished · Lootah Real Estate Development L.L.C |
363 m | 100% |
| Shamal Terraces 3 Finished · Lootah Real Estate Development L.L.C |
365 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Jumeirah Village Circle
Questions about Tower 108
Who is the developer of Tower 108?
The Dubai Land Department project registry lists Damac Development(L L C) as the developer of Tower 108.
Is Tower 108 completed?
The DLD registry status of Tower 108 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 24 Mar 2019 — a registry date, not a handover promise.
How many homes are in Tower 108?
The DLD registry records 418 units in Tower 108.
What is the price per square foot in Tower 108?
Over the last 12 complete months the median registered sale in Tower 108 was AED 820k, or AED 1 035 per sqft, from 34 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Tower 108?
The escrow agent recorded by DLD for Tower 108 is Abu Dhabi Islamic Bank.
Where is Tower 108?
Tower 108 is in the Jumeirah Village Circle community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Ghalia, about 147 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗