DubaiData

Trussardi Residences 2

Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily

Trussardi Residences 2 is a project by M I R A Developments L.L.C, recorded at 5% complete at its last Dubai Land Department inspection. 79 sales registered in the trailing 12 months at a median AED 984k (2 119 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 984k +14.1%
IQR AED 891k – AED 1.54M
DLD verified
Median price per sqft
AED 2 119/sqft +2.6%
IQR 1 837 – 2 217 AED/sqft
DLD verified
Registered sales
79 +216.0%
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 79 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperM I R A Developments L.L.C DLD verified
StatusActive DLD verified
Construction progress5% — at the last DLD inspection DLD verified
Registered with DLD4 Mar 2025 DLD verified
Construction started1 Jun 2025 DLD verified
Declared completion3 Jul 2027 — registry date, not a handover promise DLD verified
Units in the project389 DLD verified
Project area29 261 sqm DLD verified
Escrow agentEmirates Islamic Bank P.J.S.C. DLD verified
Project number3556 DLD verified

Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 0001 5002 000Jul 2025Aug 2025Sep 2025Oct 2025Nov 2025Dec 2025Jan 2026Feb 2026Mar 2026Apr 2026May 2026Jun 2026Jul 2026Aug 2026Sep 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 2 technical inspections for this project, from 17 Feb 2025 at 0.0% to 14 May 2026 at 4.6%. Since 17 Feb 2025 the recorded percentage has moved 0.31 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2027-07-032025-02-172026-05-14

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
14 May 20264.6% +4.6 pp
17 Feb 20250.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

The same figures as a table

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Sep 202621 AED 960k850 850 – 921
Aug 20261 —— —
Jul 20265 AED 954k2 035 1 987 – 2 167
Jun 20260 —— —
May 20262 —— —
Apr 20265 AED 952k2 010 1 999 – 2 022
Mar 202610 AED 1.00M2 181 2 124 – 2 251
Feb 202612 AED 964k2 144 2 104 – 2 220
Jan 20266 AED 1.07M2 207 2 192 – 2 344
Dec 20257 AED 950k2 210 2 182 – 2 272
Nov 20254 —— —
Oct 20251 —— —
Sep 20254 —— —

Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios 45AED 952k 2 167 430 sqft — —
1-bedroom apartments low sample (19) 19AED 1.83M 1 999 933 sqft — —
2-bedroom apartments low sample (8) 8AED 3.19M 1 770 1 774 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

0204060202320252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
202667AED 984k 2 101AED 83.06M
202537AED 882k 2 086AED 37.63M
20231— —AED 24.44M

Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
29 Sep 2026Office — Trussardi Residences 2Off-plan 660 sqftAED 792 444 —
29 Sep 2026Office — Trussardi Residences 2Off-plan 819 sqftAED 982 572 —
29 Sep 2026Office — Trussardi Residences 2Off-plan 1 768 sqftAED 2 121 960 —
29 Sep 2026Office — Trussardi Residences 2Off-plan 993 sqftAED 1 191 312 —
29 Sep 2026Office — Trussardi Residences 2Off-plan 444 sqftAED 532 296 —
29 Sep 2026Office — Trussardi Residences 2Off-plan 791 sqftAED 948 984 —
29 Sep 2026Office — Trussardi Residences 2Off-plan 1 748 sqftAED 2 097 540 —
25 Sep 20262 B/R Flat — Trussardi Residences 2Off-plan 1 674 sqftAED 1 422 720 850
25 Sep 20261 B/R Flat — Trussardi Residences 2Off-plan 916 sqftAED 778 973 850
25 Sep 20261 B/R Flat — Trussardi Residences 2Off-plan 999 sqftAED 849 332 850
25 Sep 20261 B/R Flat — Trussardi Residences 2Off-plan 999 sqftAED 849 332 850
25 Sep 20261 B/R Flat — Trussardi Residences 2Off-plan 1 049 sqftAED 891 236 850

Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Trussardi Residences 2 — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/trussardi-residences-2/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Trussardi Residences 2. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.