DubaiData

Uh West By Ellington

Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily

Uh West By Ellington is a project by Ellington Properties Development L.L.C, recorded at 71% complete at its last Dubai Land Department inspection. 60 sales registered in the trailing 12 months at a median AED 2.08M (1 923 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 2.08M +16.7%
IQR AED 1.61M – AED 2.51M
DLD verified
Median price per sqft
AED 1 923/sqft +5.3%
IQR 1 816 – 2 069 AED/sqft
DLD verified
Registered sales
60 -16.7%
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 60 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperEllington Properties Development L.L.C DLD verified
StatusActive DLD verified
Construction progress71% — at the last DLD inspection DLD verified
Registered with DLD8 Aug 2023 DLD verified
Construction started26 May 2023 DLD verified
Declared completion3 Mar 2026 — registry date, not a handover promise DLD verified
Units in the project381 DLD verified
Project area36 320 sqm DLD verified
Escrow agentFirst Abu Dhabi Bank P.J.S.C. DLD verified
Project number2684 DLD verified

Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 5002 0002 500Sep 2023Jan 2024May 2024Sep 2024Jan 2025May 2025Sep 2025Jan 2026May 2026Sep 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jun 2026: in the 3 months since, no month reached the five registered sales a median needs (9 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 7 technical inspections for this project, from 31 May 2023 at 0.0% to 11 Jun 2026 at 71.3%. Over the inspections since 10 Apr 2025 it moved 3.24 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2026-03-032023-05-312026-06-11

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
11 Jun 202671.3% +11.8 pp
10 Feb 202659.5% +23.1 pp
30 Aug 202536.4% +10.5 pp
10 Apr 202525.9% +15.0 pp
4 Jul 202410.9% +4.1 pp
14 Mar 20246.8% +6.8 pp
31 May 20230.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

The same figures as a table

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Jun 20266 AED 2.10M1 921 1 796 – 1 960
May 20262 —— —
Apr 20260 —— —
Mar 20265 AED 1.68M1 826 1 825 – 1 962
Feb 20265 AED 1.75M1 946 1 888 – 2 104
Jan 20262 —— —
Dec 20257 AED 2.85M1 923 1 921 – 2 069
Nov 202512 AED 2.23M1 807 1 756 – 1 997
Oct 202512 AED 1.86M1 950 1 875 – 2 119
Sep 20258 AED 2.25M2 385 2 214 – 2 439
Aug 20255 AED 1.66M1 793 1 732 – 2 202
Jul 20255 AED 1.49M2 150 2 082 – 2 284
Jun 20259 AED 1.79M1 748 1 670 – 2 164

Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios insufficient data 3— — — — —
1-bedroom apartments 31AED 1.65M 1 881 879 sqft — —
2-bedroom apartments 20AED 2.49M 1 976 1 282 sqft — —
3-bedroom apartments insufficient data 3— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

01002002023202420252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
202629AED 1.75M 1 927AED 58.13M
202595AED 1.81M 1 871AED 196.81M
2024226AED 1.69M 1 763AED 424.30M
2023114AED 1.47M 1 608AED 251.05M

Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
24 Sep 20261 B/R Flat — UH WEST BY ELLINGTONOff-plan 879 sqftAED 1 603 828 1 826
3 Sep 2026Studio Flat — UH WEST BY ELLINGTONOff-plan 449 sqftAED 836 400 1 862
2 Sep 20261 B/R Flat — UH WEST BY ELLINGTONOff-plan 854 sqftAED 1 425 000 1 669
31 Aug 2026Studio Flat — UH WEST BY ELLINGTONOff-plan 449 sqftAED 950 000 2 115
27 Aug 20262 B/R Flat — UH WEST BY ELLINGTONOff-plan 1 202 sqftAED 2 422 828 2 016
17 Aug 20262 B/R Flat — UH WEST BY ELLINGTONOff-plan 1 254 sqftAED 2 350 000 1 874
3 Aug 20261 B/R Flat — UH WEST BY ELLINGTONOff-plan 838 sqftAED 1 882 828 2 248
14 Jul 20261 B/R Flat — UH WEST BY ELLINGTONOff-plan 843 sqftAED 1 280 828 1 520
13 Jul 20262 B/R Flat — UH WEST BY ELLINGTONOff-plan 1 272 sqftAED 2 600 000 2 045
25 Jun 20261 B/R Flat — UH WEST BY ELLINGTONOff-plan 956 sqftAED 1 543 828 1 615
24 Jun 20262 B/R Flat — UH WEST BY ELLINGTONOff-plan 1 272 sqftAED 2 450 000 1 927
22 Jun 20262 B/R Flat — UH WEST BY ELLINGTONOff-plan 1 282 sqftAED 3 112 828 2 429

Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Jumeirah Lakes Towers

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Uh West By Ellington — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/uh-west-by-ellington/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Uh West By Ellington. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.