Val By Kasco
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Val By Kasco: ChatGPT · Claude · Perplexity
Val By Kasco is a project by Kasco Real Estate Development L.L.C, recorded at 82% complete at its last Dubai Land Department inspection. 5 sales registered in the trailing 12 months at a median AED 1.70M (1 694 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 5 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Kasco Real Estate Development L.L.C |
| Status | Active |
| Construction progress | 82% — at the last DLD inspection |
| Registered with DLD | 15 Nov 2024 |
| Construction started | 1 Aug 2024 |
| Declared completion | 30 Dec 2026 — registry date, not a handover promise |
| Units in the project | 134 |
| Project area | 10 964 sqm |
| Escrow agent | Abu Dhabi Commercial Bank |
| Project number | 3142 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2025: in the 14 months since, no month reached the five registered sales a median needs (8 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 8 technical inspections for this project, from 19 Jun 2024 at 0.0% to 17 Nov 2026 at 81.7%. Over the inspections since 2 Jun 2025 it moved 3.93 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 17 Nov 2026 | 81.7% | +9.2 pp |
| 19 Aug 2026 | 72.5% | +15.2 pp |
| 6 May 2026 | 57.4% | +16.0 pp |
| 30 Jan 2026 | 41.4% | +15.1 pp |
| 31 Oct 2025 | 26.3% | +13.3 pp |
| 2 Jun 2025 | 13.0% | +5.8 pp |
| 14 Feb 2025 | 7.2% | +7.2 pp |
| 19 Jun 2024 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
Off-plan sale registrations in Val By Kasco (126) already equal 100% of the 121 homes in the DLD unit register, as of 23 Nov 2026. Few homes, if any, are left without a registered sale — the count includes resales, so a small number may still be unsold.
| Homes | In unit register | Registered sales |
|---|---|---|
| Studios | 55 | 56 |
| 1 bedroom | 44 | 48 |
| 2 bedrooms | 22 | 22 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios insufficient data | 1 | — | — | — | — | — |
| 1-bedroom apartments insufficient data | 2 | — | — | — | — | — |
| 2-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 19 Oct 2026 | 2 B/R Flat | Off-plan | 1 690 sqft | AED 2 847 000 | 1 684 |
| 21 Sep 2026 | 1 B/R Flat | Off-plan | 847 sqft | AED 1 697 272 | 2 003 |
| 31 Aug 2026 | Studio Flat | Off-plan | 450 sqft | AED 980 000 | 2 176 |
| 17 Jul 2026 | 1 B/R Flat | Off-plan | 804 sqft | AED 1 330 000 | 1 653 |
| 15 Jul 2026 | 2 B/R Flat | Off-plan | 1 690 sqft | AED 2 864 000 | 1 694 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Val By Kasco: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Sep 2025 – Aug 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 5 | AED 1.70M | 1 694 | AED 9.72M |
| 2025 | 121 | AED 1.28M | 1 861 | AED 166.63M |
| 2023 | 1 | — | — | AED 32.00M |
| 2015 | 1 | — | — | AED 21.70M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Aug 2025 | 6 | AED 1.11M | 2 017 | 1 768 – 2 100 |
| Jul 2025 | 5 | AED 1.53M | 1 993 | 1 930 – 2 281 |
| Jun 2025 | 17 | AED 1.08M | 2 051 | 1 962 – 2 215 |
| May 2025 | 27 | AED 1.32M | 1 782 | 1 539 – 2 038 |
| Apr 2025 | 8 | AED 1.20M | 1 661 | 1 554 – 1 891 |
| Mar 2025 | 28 | AED 1.23M | 1 868 | 1 550 – 2 202 |
| Feb 2025 | 27 | AED 1.37M | 1 861 | 1 698 – 2 142 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 5 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Jaddaf Waterfront
Questions about Val By Kasco
Who is the developer of Val By Kasco?
The Dubai Land Department project registry lists Kasco Real Estate Development L.L.C as the developer of Val By Kasco.
Is Val By Kasco completed?
The DLD registry status of Val By Kasco is Active, 82% complete at the last DLD inspection. The declared completion date in the registry is 30 Dec 2026 — a registry date, not a handover promise.
How many homes are in Val By Kasco?
The DLD registry records 134 units in Val By Kasco. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in Val By Kasco?
Over the last 12 complete months the median registered sale in Val By Kasco was AED 1.70M, or AED 1 694 per sqft, from 5 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Val By Kasco?
The escrow agent recorded by DLD for Val By Kasco is Abu Dhabi Commercial Bank.
Where is Val By Kasco?
Val By Kasco is in the Jaddaf Waterfront community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗