Data Dubai

Zenith Tower A2

Zenith Tower A2Finished100% built161 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Zenith Tower A2: ChatGPT · Claude · Perplexity

Zenith Tower A2 is a project by Zenith Smart Real Estate Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
2 -75.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 2 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperZenith Smart Real Estate Development L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD10 Dec 2014
Construction started20 Oct 2013
Declared completion25 Aug 2016 — registry date, not a handover promise
Units in the project161
Project area14 372 sqm
Escrow agentAbu Dhabi Commercial Bank
Project number923

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Dec 2021: in the 58 months since, no month reached the five registered sales a median needs (37 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 4 technical inspections for this project, from 26 Mar 2015 at 42.8% to 1 Oct 2017 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2016-08-252015-03-262017-10-01

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
1 Oct 2017100.0% +5.7 pp
1 Aug 201794.3% +33.8 pp
1 Feb 201660.5% +17.7 pp
26 Mar 201542.8% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios insufficient data 1— — — — —
1-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
18 Nov 20262 B/R FlatReady 1 016 sqftAED 920 000 905
13 Jul 2026Studio FlatReady 447 sqftAED 465 000 1 040
7 Apr 20261 B/R FlatReady 854 sqftAED 850 000 996

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Zenith Tower A2: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

051015201520162017201820192020202120222023202420252026051015201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

012JanFebMarAprMayJunJulAugSepOctNovDec012FebAprJunAugOctDec

registered sales per month, Jan 2022 – Dec 2022

YearSalesMedian priceMedian AED/sqftTotal registered value
20262— —AED 1.31M
20258AED 420k 888AED 4.48M
20246AED 570k 705AED 3.58M
202314AED 418k 721AED 6.56M
20227AED 525k 574AED 4.14M
202110AED 542k 503AED 5.03M
202011AED 445k 445AED 4.80M
20193— —AED 1.83M
201812AED 618k 949AED 7.55M
201713AED 490k 1 020AED 7.98M
201610AED 590k 1 065AED 6.99M
20158AED 500k 956AED 4.55M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent by year, 2017–2023

40k50k60k70k201720182019202020212022202340k50k60k70k2017201920212023

1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
Year1-bed flat
2023 58k
2021 50k
2020 52k
2019 58k
2018 60k
2017 65k

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Dec 20217 AED 545k531 475 – 537

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 2 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Zenith Tower A2. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Chess Tower
Cancelled · Al Masah International Real Estate Development (Llc)
80 m41%—
Grand Horizon 1
Finished · Gulf General Investments Co. (P.S.C)
81 m100%126
Elite 9 Sports Residence
Finished · Range 3 Investments Limited
156 m100%288
Eagle Heights
Finished · Smart Investment Limited
160 m100%292
Olympic Park 6
Finished · Gulf General Investments Co. (P.S.C)
162 m100%154
Arabian & Spainsh Tower (Phase 2)
Cancelled · Dubai Sports City (L. L. C)
188 m27%—
Victory Heights - Phase 2
Finished · Victory Heights Real Estate Development L.L.C
276 m100%30
Canal Residence West (Phase 1)
Finished · Dubai Sports City (L. L. C)
281 m100%612
Champions Tower2
Active · Fast Solutions Real Estate Development
283 m78%172
Royale Residence2
Finished · Pan Global Development L.L.C
284 m100%196

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Dubai Sports City

Questions about Zenith Tower A2

Who is the developer of Zenith Tower A2?

The Dubai Land Department project registry lists Zenith Smart Real Estate Development L.L.C as the developer of Zenith Tower A2.

Is Zenith Tower A2 completed?

The DLD registry status of Zenith Tower A2 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 25 Aug 2016 — a registry date, not a handover promise.

How many homes are in Zenith Tower A2?

The DLD registry records 161 units in Zenith Tower A2.

What is the price per square foot in Zenith Tower A2?

Too few sales were registered in Zenith Tower A2 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Zenith Tower A2?

The escrow agent recorded by DLD for Zenith Tower A2 is Abu Dhabi Commercial Bank.

Where is Zenith Tower A2?

Zenith Tower A2 is in the Dubai Sports City community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Chess Tower, about 80 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Zenith Tower A2 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/zenith-tower-a2/”. Reuse is permitted with attribution.