Data Dubai

4b Living

4b LivingFinished100% built74 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about 4b Living: ChatGPT · Claude · Perplexity

4b Living is a project by H S E Realty Real Estate L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 10 sales registered in the trailing 12 months at a median AED 784k (1 045 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 784k +0.7% y/y
≈ US$ 213k · typical range AED 741k – AED 832k
DLD verified
Median price per sqft
AED 1 045/sqft -0.9% y/y
typical range 1 004 – 1 113 AED/sqft
DLD verified
Registered sales
10 -83.1% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 10 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperH S E Realty Real Estate L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD15 Nov 2024
Construction started27 May 2024
Declared completion30 Aug 2025 — registry date, not a handover promise
Units in the project74
Project area4 721 sqm
Escrow agentAbu Dhabi Islamic Bank
Project number3089

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Nov 2025: in the 11 months since, no month reached the five registered sales a median needs (3 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 5 technical inspections for this project, from 15 Oct 2024 at 20.1% to 15 Sep 2026 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2025-08-302024-10-152026-09-15

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
15 Sep 2026100.0% +9.0 pp
4 Feb 202691.0% +22.2 pp
14 Oct 202568.8% +20.3 pp
18 Jun 202548.4% +28.3 pp
15 Oct 202420.1% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios insufficient data 1— — — — —
1-bedroom apartments low sample (9) 9AED 784k 1 036 732 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
23 Nov 2026Studio FlatReady 401 sqftAED 550 000 1 373
17 Jul 20261 B/R FlatOff-plan 853 sqftAED 849 000 995
17 Dec 20251 B/R FlatOff-plan 732 sqftAED 832 450 1 138
1 Dec 20251 B/R FlatOff-plan 644 sqftAED 639 625 994
20 Nov 20251 B/R FlatOff-plan 700 sqftAED 783 931 1 120
20 Nov 20251 B/R FlatOff-plan 732 sqftAED 852 800 1 166
20 Nov 20251 B/R FlatOff-plan 777 sqftAED 805 000 1 036
11 Nov 20251 B/R FlatOff-plan 702 sqftAED 740 700 1 055
11 Nov 2025Studio FlatOff-plan 365 sqftAED 398 000 1 091
3 Nov 20251 B/R FlatOff-plan 749 sqftAED 720 000 962
3 Nov 20251 B/R FlatOff-plan 742 sqftAED 765 000 1 031

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for 4b Living: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

020406020252026020406020252026

registered sales per calendar year; the current year is incomplete

By month

0246NovDecJanFebMarAprMayJunJulAugSepOct0246DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20261— —AED 849k
202568AED 778k 1 055AED 43.00M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Nov 20256 AED 774k1 055 1 033 – 1 106
Oct 202514 AED 795k1 071 1 035 – 1 129
Sep 20259 AED 802k1 079 1 041 – 1 088
Aug 202510 AED 766k1 028 1 012 – 1 086
Jul 202514 AED 681k1 047 992 – 1 065

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 10 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in International City Phase 3

Questions about 4b Living

Who is the developer of 4b Living?

The Dubai Land Department project registry lists H S E Realty Real Estate L.L.C as the developer of 4b Living.

Is 4b Living completed?

The DLD registry status of 4b Living is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 30 Aug 2025 — a registry date, not a handover promise.

How many homes are in 4b Living?

The DLD registry records 74 units in 4b Living.

What is the price per square foot in 4b Living?

Over the last 12 complete months the median registered sale in 4b Living was AED 784k, or AED 1 045 per sqft, from 10 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for 4b Living?

The escrow agent recorded by DLD for 4b Living is Abu Dhabi Islamic Bank.

Where is 4b Living?

4b Living is in the International City Phase 3 community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “4b Living — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/4b-living/”. Reuse is permitted with attribution.