A 99
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about A 99: ChatGPT · Claude · Perplexity
A 99 is a project by Arabian Gulf Properties, recorded at 48% complete at its last Dubai Land Department inspection. 5 sales registered in the trailing 12 months at a median AED 1.29M. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 5 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Arabian Gulf Properties |
| Status | Active |
| Construction progress | 48% — at the last DLD inspection |
| Registered with DLD | 11 Sep 2024 |
| Construction started | 31 Oct 2023 |
| Declared completion | 31 Oct 2026 — registry date, not a handover promise |
| Units in the project | 90 |
| Project area | 10 995 sqm |
| Escrow agent | United Bank Limited (Management Office) |
| Project number | 2768 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2025: in the 15 months since, no month reached the five registered sales a median needs (7 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 7 technical inspections for this project, from 1 May 2024 at 0.3% to 19 Oct 2026 at 47.8%. Over the inspections since 12 Jun 2025 it moved 0.81 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 19 Oct 2026 | 47.8% | +2.7 pp |
| 1 Jul 2026 | 45.1% | +2.8 pp |
| 8 Apr 2026 | 42.3% | +2.5 pp |
| 10 Oct 2025 | 39.8% | +5.2 pp |
| 12 Jun 2025 | 34.6% | +13.6 pp |
| 20 Dec 2024 | 21.0% | +20.7 pp |
| 1 May 2024 | 0.3% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
Off-plan sale registrations in A 99 (89) already equal 99% of the 90 homes in the DLD unit register, as of 23 Nov 2026. Few homes, if any, are left without a registered sale — the count includes resales, so a small number may still be unsold.
| Homes | In unit register | Registered sales |
|---|---|---|
| 2 bedrooms | 40 | 39 |
| 3 bedrooms | 50 | 50 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 2-bedroom apartments insufficient data | 3 | — | — | — | — | — |
| 3-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 20 Aug 2026 | 2 B/R Flat | Off-plan | 1 076 sqft | AED 1 346 250 | 1 251 |
| 14 Jul 2026 | 3 B/R Flat | Off-plan | 1 286 sqft | AED 1 368 787 | 1 064 |
| 25 Mar 2026 | 3 B/R Flat | Off-plan | 1 286 sqft | AED 1 049 381 | 816 |
| 30 Dec 2025 | 2 B/R Flat | Off-plan | 1 076 sqft | AED 1 086 723 | 1 009 |
| 6 Nov 2025 | 2 B/R Flat | Off-plan | 1 076 sqft | AED 1 292 400 | 1 201 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for A 99: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Aug 2025 – Jul 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 3 | — | — | AED 3.76M |
| 2025 | 86 | AED 1.16M | 986 | AED 104.87M |
| 2022 | 1 | — | — | AED 8.98M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jul 2025 | 9 | AED 1.33M | 1 036 | 1 026 – 1 046 |
| Jun 2025 | 7 | AED 1.22M | — | — |
| May 2025 | 2 | — | — | — |
| Apr 2025 | 20 | AED 1.13M | 985 | 968 – 1 023 |
| Mar 2025 | 26 | AED 1.12M | 1 007 | 976 – 1 036 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 5 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai Land Residence Complex
Questions about A 99
Who is the developer of A 99?
The Dubai Land Department project registry lists Arabian Gulf Properties as the developer of A 99.
Is A 99 completed?
The DLD registry status of A 99 is Active, 48% complete at the last DLD inspection. The declared completion date in the registry is 31 Oct 2026 — a registry date, not a handover promise.
How many homes are in A 99?
The DLD registry records 90 units in A 99. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in A 99?
Too few sales were registered in A 99 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.
Who holds the escrow account for A 99?
The escrow agent recorded by DLD for A 99 is United Bank Limited (Management Office).
Where is A 99?
A 99 is in the Dubai Land Residence Complex community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗