Data Dubai

Al Helal Al Zahaby 3

Al Helal Al Zahaby 3Finished100% built67 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Al Helal Al Zahaby 3: ChatGPT · Claude · Perplexity

Al Helal Al Zahaby 3 is a project by Al Helal Al Zahaby Real Estate Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 8 sales registered in the trailing 12 months at a median AED 655k (949 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 655k -6.4% y/y
≈ US$ 178k · typical range AED 622k – AED 730k
DLD verified
Median price per sqft
AED 949/sqft -1.3% y/y
typical range 836 – 985 AED/sqft
DLD verified
Registered sales
8 +60.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 8 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAl Helal Al Zahaby Real Estate Development L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD10 Feb 2023
Construction started29 Mar 2022
Declared completion1 Aug 2023 — registry date, not a handover promise
Units in the project67
Project area5 231 sqm
Escrow agentEmirates Islamic Bank P.J.S.C.
Project number2468

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Oct 2023: in the 36 months since, no month reached the five registered sales a median needs (24 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 2 technical inspections for this project, from 30 Dec 2022 at 50.2% to 8 Nov 2023 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2023-08-012022-12-302023-11-08

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
8 Nov 2023100.0% +49.8 pp
30 Dec 202250.2% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments low sample (8) 8AED 655k 949 734 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
26 Jun 20261 B/R FlatReady 697 sqftAED 730 000 1 048
19 May 20261 B/R FlatReady 663 sqftAED 630 000 950
23 Feb 20261 B/R FlatReady 810 sqftAED 820 000 1 013
7 Jan 20261 B/R FlatReady 772 sqftAED 660 000 855
5 Jan 20261 B/R FlatReady 748 sqftAED 730 000 976
8 Dec 20251 B/R FlatReady 685 sqftAED 650 000 948
14 Nov 20251 B/R FlatReady 772 sqftAED 600 000 777
10 Nov 20251 B/R FlatReady 721 sqftAED 550 000 763

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Al Helal Al Zahaby 3: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

02040602014202120232024202520260204060201420212023202420252026

registered sales per calendar year; the current year is incomplete

By month

0123NovDecJanFebMarAprMayJunJulAugSepOct0123DecFebAprJunAugOct

registered sales per month, Nov 2023 – Oct 2024

YearSalesMedian priceMedian AED/sqftTotal registered value
20265AED 730k 976AED 3.57M
20258AED 655k 881AED 7.33M
20247AED 600k 721AED 8.40M
202371AED 583k 793AED 40.77M
20211— —AED 2.45M
20141— —AED 6.92M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent by year, 2023–2026

Median annual rent, AED thousand
Year1-bed flat
2026 YTD 58k
2025 55k
2024 53k
2023 50k

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Oct 202320 AED 559k797 784 – 797
Sep 202311 AED 584k793 782 – 796
Aug 20237 AED 589k793 787 – 793
Jul 20231 —— —
Jun 20235 AED 563k— —
May 202314 AED 596k805 782 – 909
Apr 20236 AED 606k887 860 – 913

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 8 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in International City Phase 3

Questions about Al Helal Al Zahaby 3

Who is the developer of Al Helal Al Zahaby 3?

The Dubai Land Department project registry lists Al Helal Al Zahaby Real Estate Development L.L.C as the developer of Al Helal Al Zahaby 3.

Is Al Helal Al Zahaby 3 completed?

The DLD registry status of Al Helal Al Zahaby 3 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 1 Aug 2023 — a registry date, not a handover promise.

How many homes are in Al Helal Al Zahaby 3?

The DLD registry records 67 units in Al Helal Al Zahaby 3.

What is the price per square foot in Al Helal Al Zahaby 3?

Over the last 12 complete months the median registered sale in Al Helal Al Zahaby 3 was AED 655k, or AED 949 per sqft, from 8 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Al Helal Al Zahaby 3?

The escrow agent recorded by DLD for Al Helal Al Zahaby 3 is Emirates Islamic Bank P.J.S.C..

Where is Al Helal Al Zahaby 3?

Al Helal Al Zahaby 3 is in the International City Phase 3 community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Al Helal Al Zahaby 3 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/al-helal-al-zahaby-3/”. Reuse is permitted with attribution.