Blue Wave
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Blue Wave: ChatGPT · Claude · Perplexity
Blue Wave is a project by Tiger Properties, recorded at 100% complete at its last Dubai Land Department inspection. 41 sales registered in the trailing 12 months at a median AED 520k (954 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 41 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Tiger Properties |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 20 Oct 2019 |
| Construction started | 1 Nov 2019 |
| Declared completion | 30 Jan 2023 — registry date, not a handover promise |
| Units in the project | 578 |
| Project area | 40 873 sqm |
| Escrow agent | Abu Dhabi Commercial Bank |
| Project number | 2165 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Sep 2026: in the 1 months since, no month reached the five registered sales a median needs (3 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 22 Jun 2020 at 5.3% to 30 Jan 2023 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 30 Jan 2023 | 100.0% | +3.0 pp |
| 9 Jan 2023 | 97.0% | +40.6 pp |
| 7 Apr 2022 | 56.5% | +25.2 pp |
| 6 Sep 2021 | 31.3% | +9.1 pp |
| 15 Mar 2021 | 22.3% | +17.0 pp |
| 22 Jun 2020 | 5.3% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios | 32 | AED 512k | 952 | 544 sqft | — | — |
| 1-bedroom apartments low sample (9) | 9 | AED 800k | 957 | 836 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 9 Nov 2026 | Studio Flat | Ready | 537 sqft | AED 550 000 | 1 024 |
| 4 Nov 2026 | Studio Flat | Ready | 591 sqft | AED 510 000 | 864 |
| 21 Oct 2026 | 1 B/R Flat | Ready | 658 sqft | AED 700 000 | 1 064 |
| 7 Oct 2026 | Studio Flat | Ready | 580 sqft | AED 540 000 | 932 |
| 1 Oct 2026 | Studio Flat | Ready | 439 sqft | AED 445 000 | 1 013 |
| 24 Sep 2026 | Studio Flat | Ready | 440 sqft | AED 485 000 | 1 101 |
| 24 Sep 2026 | Studio Flat | Ready | 407 sqft | AED 460 000 | 1 130 |
| 24 Sep 2026 | Studio Flat | Ready | 550 sqft | AED 532 000 | 966 |
| 17 Sep 2026 | Studio Flat | Ready | 537 sqft | AED 510 000 | 949 |
| 16 Sep 2026 | Studio Flat | Ready | 413 sqft | AED 445 000 | 1 077 |
| 10 Sep 2026 | Studio Flat | Ready | 576 sqft | AED 490 000 | 851 |
| 7 Sep 2026 | Studio Flat | Ready | 580 sqft | AED 520 000 | 897 |
| 7 Sep 2026 | 1 B/R Flat | Ready | 836 sqft | AED 750 000 | 897 |
| 25 Aug 2026 | 1 B/R Flat | Ready | 658 sqft | AED 730 000 | 1 110 |
| 4 Aug 2026 | Studio Flat | Ready | 550 sqft | AED 455 000 | 827 |
| 3 Jul 2026 | Studio Flat | Ready | 586 sqft | AED 530 000 | 905 |
| 25 Jun 2026 | 1 B/R Flat | Ready | 849 sqft | AED 825 000 | 971 |
| 17 Jun 2026 | Studio Flat | Ready | 382 sqft | AED 415 000 | 1 085 |
| 1 Jun 2026 | Studio Flat | Ready | 382 sqft | AED 307 704 | 805 |
| 21 May 2026 | Studio Flat | Ready | 586 sqft | AED 530 000 | 905 |
| 19 May 2026 | Studio Flat | Ready | 592 sqft | AED 525 000 | 887 |
| 18 May 2026 | Studio Flat | Ready | 576 sqft | AED 520 000 | 903 |
| 18 May 2026 | Studio Flat | Ready | 593 sqft | AED 535 000 | 903 |
| 18 May 2026 | Studio Flat | Ready | 586 sqft | AED 520 000 | 888 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Blue Wave: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 34 | AED 520k | 955 | AED 18.44M |
| 2025 | 58 | AED 492k | 922 | AED 32.58M |
| 2024 | 79 | AED 520k | 889 | AED 45.27M |
| 2023 | 140 | AED 440k | 798 | AED 72.20M |
| 2022 | 104 | AED 456k | 800 | AED 45.44M |
| 2021 | 56 | AED 439k | 760 | AED 27.67M |
| 2020 | 110 | AED 397k | 863 | AED 47.70M |
| 2019 | 1 | — | — | AED 349k |
| 2017 | 1 | — | — | AED 22.81M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2023–2026
| Year | Studio | 1-bed flat | 2-bed flat | Gross yield |
|---|---|---|---|---|
| 2026 YTD | 42k | 58k | 80k | 8.24% |
| 2025 | 42k | 55k | 79k | 9.23% |
| 2024 | 38k | 55k | 70k | 7.44% |
| 2023 | 36k | 50k | 70k | 8.46% |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Sep 2026 | 8 | AED 500k | 958 | 897 – 1 083 |
| Aug 2026 | 2 | — | — | — |
| Jul 2026 | 1 | — | — | — |
| Jun 2026 | 3 | — | — | — |
| May 2026 | 6 | AED 522k | 903 | 892 – 904 |
| Apr 2026 | 4 | — | — | — |
| Mar 2026 | 2 | — | — | — |
| Feb 2026 | 2 | — | — | — |
| Jan 2026 | 3 | — | — | — |
| Dec 2025 | 2 | — | — | — |
| Nov 2025 | 5 | AED 540k | 981 | 912 – 1 015 |
| Oct 2025 | 6 | AED 540k | 977 | 928 – 1 268 |
| Sep 2025 | 7 | AED 500k | 968 | 924 – 1 052 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai Land Residence Complex
Questions about Blue Wave
Who is the developer of Blue Wave?
The Dubai Land Department project registry lists Tiger Properties as the developer of Blue Wave.
Is Blue Wave completed?
The DLD registry status of Blue Wave is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 30 Jan 2023 — a registry date, not a handover promise.
How many homes are in Blue Wave?
The DLD registry records 578 units in Blue Wave.
What is the price per square foot in Blue Wave?
Over the last 12 complete months the median registered sale in Blue Wave was AED 520k, or AED 954 per sqft, from 41 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Blue Wave?
The escrow agent recorded by DLD for Blue Wave is Abu Dhabi Commercial Bank.
Where is Blue Wave?
Blue Wave is in the Dubai Land Residence Complex community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗