Data Dubai

Burj Pacific

Burj PacificActive99% built145 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Burj Pacific: ChatGPT · Claude · Perplexity

Burj Pacific is a project by Pacific Ventures Limited, recorded at 99% complete at its last Dubai Land Department inspection. 9 sales registered in the trailing 12 months at a median AED 2.03M (1 300 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 2.03M -29.6% y/y
≈ US$ 554k · typical range AED 1.20M – AED 2.17M
DLD verified
Median price per sqft
AED 1 300/sqft -13.3% y/y
typical range 1 201 – 1 500 AED/sqft
DLD verified
Registered sales
9 -47.1% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 9 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperPacific Ventures Limited
StatusActive
Construction progress99% — at the last DLD inspection
Registered with DLD4 Feb 2013
Construction started1 Jan 2012
Declared completion31 Jan 2023 — registry date, not a handover promise
Units in the project145
Project area24 099 sqm
Escrow agentMashreq Bank Psc
Project number266

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Dec 2021: in the 58 months since, no month reached the five registered sales a median needs (38 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 31 technical inspections for this project, from 23 Jul 2013 at 2.2% to 19 Aug 2025 at 98.8%. Over the inspections since 22 Feb 2024 it moved 0.21 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2023-01-312013-07-232025-08-19

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
19 Aug 202598.8% +0.7 pp
27 Mar 202598.1% +0.5 pp
28 Sep 202497.6% +2.5 pp
22 Feb 202495.1% +2.6 pp
4 Sep 202392.5% +0.1 pp
18 Jul 202392.3% +0.4 pp
15 Mar 202392.0% +0.3 pp
31 Aug 202291.6% +0.4 pp
14 Mar 202291.2% +1.7 pp
22 Nov 202189.5% +1.4 pp
8 Jul 202188.1% +0.7 pp
31 Jan 202187.4% +0.3 pp
20 Jul 202087.0% +0.4 pp
10 Feb 202086.6% +2.6 pp
15 Oct 201984.0% +4.0 pp
16 Jun 201980.0% +5.0 pp
10 Feb 201975.1% +5.0 pp
3 Oct 201870.1% +7.0 pp
24 Jun 201863.0% +1.0 pp
9 May 201862.1% +4.5 pp
17 Jan 201857.6% +2.6 pp
6 Aug 201755.0% +14.9 pp
15 Jan 201740.1% +12.1 pp
29 Aug 201628.0% +3.0 pp
23 Nov 201525.1% +8.0 pp
2 Jul 201517.1% +6.3 pp
25 Mar 201510.8% +4.0 pp
22 Dec 20146.8% +4.2 pp
20 May 20142.6% +0.3 pp
21 Jan 20142.3% +0.1 pp
23 Jul 20132.2% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Homes and registered off-plan sales

Off-plan sale registrations in Burj Pacific (265) already equal 100% of the 143 homes in the DLD unit register, as of 23 Nov 2026. Few homes, if any, are left without a registered sale — the count includes resales, so a small number may still be unsold.

HomesIn unit
register
Registered
sales
1 bedroom5098
2 bedrooms59106
3 bedrooms2649
4+ bedrooms812

Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗

Homes without a registered sale in all Dubai off-plan projects →

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments insufficient data 3— — — — —
2-bedroom apartments insufficient data 4— — — — —
3-bedroom apartments insufficient data 2— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
9 Sep 20262 B/R FlatOff-plan 2 034 sqftAED 2 034 400 1 000
11 Feb 20261 B/R FlatOff-plan 840 sqftAED 1 008 000 1 201
11 Feb 20261 B/R FlatOff-plan 840 sqftAED 1 008 000 1 201
11 Feb 20261 B/R FlatOff-plan 1 001 sqftAED 1 202 000 1 201
16 Jan 20263 B/R FlatOff-plan 2 906 sqftAED 4 213 700 1 450
30 Dec 20253 B/R FlatOff-plan 2 906 sqftAED 4 359 375 1 500
12 Nov 20252 B/R FlatOff-plan 1 446 sqftAED 2 168 385 1 500
12 Nov 20252 B/R FlatOff-plan 1 446 sqftAED 2 168 385 1 500
5 Nov 20252 B/R FlatOff-plan 1 550 sqftAED 2 015 000 1 300

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Burj Pacific: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0204020132015201620172018201920202021202220232025202602040201520172019202120232026

registered sales per calendar year; the current year is incomplete

By month

0510JanFebMarAprMayJunJulAugSepOctNovDec0510FebAprJunAugOctDec

registered sales per month, Jan 2022 – Dec 2022

YearSalesMedian priceMedian AED/sqftTotal registered value
20265AED 1.20M 1 201AED 9.47M
202521AED 2.25M 1 500AED 57.76M
202311AED 1.32M 1 275AED 17.82M
202221AED 979k 768AED 20.12M
202134AED 825k 607AED 50.95M
202011AED 1.00M 628AED 27.79M
201950AED 1.05M 700AED 82.86M
201845AED 1.00M 600AED 54.52M
201744AED 1.21M 841AED 64.84M
201624AED 1.35M 828AED 32.23M
20153— —AED 3.40M
20134— —AED 3.23M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Dec 202112 AED 737k584 573 – 623
Nov 20216 AED 548k550 550 – 556

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 9 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Burj Pacific. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
The Sterling West House
Finished · Omniyat Properties Seventeen Limited
61 m100%195
The Sterling East House
Finished · Op 17 Limited
121 m100%234
Mag 318
Finished · Mag Property Development L.L.C
131 m100%451
Burj Views
Finished · Emaar Properties (P.J.S.C)
148 m100%748
Eni Coral Tower
Finished · Emirates National Investment Co (L.L.C)
184 m100%145
Reva Residences
Finished · Damac World Real Estate L.L.C
188 m100%604
Burj Al Nujoom
Finished · Althuraya Real Estate Development Limited
193 m100%408
51@Business Bay
Finished · Deyaar Development (P.J.S.C)
202 m100%176
Water'S Edge
Finished · Damac Star Properties (L L C)
257 m100%222
Tamani Arts Offices
Finished · The Developer Properties L.L.C
270 m100%969

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Business Bay

Questions about Burj Pacific

Who is the developer of Burj Pacific?

The Dubai Land Department project registry lists Pacific Ventures Limited as the developer of Burj Pacific.

Is Burj Pacific completed?

The DLD registry status of Burj Pacific is Active, 99% complete at the last DLD inspection. The declared completion date in the registry is 31 Jan 2023 — a registry date, not a handover promise.

How many homes are in Burj Pacific?

The DLD registry records 145 units in Burj Pacific. The split by number of bedrooms is in the unit register table on this page.

What is the price per square foot in Burj Pacific?

Over the last 12 complete months the median registered sale in Burj Pacific was AED 2.03M, or AED 1 300 per sqft, from 9 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Burj Pacific?

The escrow agent recorded by DLD for Burj Pacific is Mashreq Bank Psc.

Where is Burj Pacific?

Burj Pacific is in the Business Bay community. 10 other projects with a page on this site are registered within 1.2 km; the closest is The Sterling West House, about 61 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Burj Pacific — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/burj-pacific/”. Reuse is permitted with attribution.