Burj View Residence
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Burj View Residence: ChatGPT · Claude · Perplexity
Burj View Residence is a project by Al Madar Investment (L.L.C), recorded at 100% complete at its last Dubai Land Department inspection. 15 sales registered in the trailing 12 months at a median AED 640k (1 183 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 15 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Al Madar Investment (L.L.C) |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 27 Oct 2015 |
| Construction started | 1 Feb 2015 |
| Declared completion | 4 Aug 2016 — registry date, not a handover promise |
| Units in the project | 120 |
| Project area | 9 231 sqm |
| Escrow agent | Abu Dhabi Commercial Bank |
| Project number | 1691 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2025: in the 15 months since, no month reached the five registered sales a median needs (17 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 3 technical inspections for this project, from 14 Jan 2016 at 58.5% to 22 Dec 2016 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 22 Dec 2016 | 100.0% | +18.0 pp |
| 17 Jul 2016 | 82.0% | +23.4 pp |
| 14 Jan 2016 | 58.5% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (9) | 9 | AED 600k | 1 207 | 465 sqft | — | — |
| 2-bedroom apartments low sample (6) | 6 | AED 1.48M | 1 105 | 1 311 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 2 Nov 2026 | 2 B/R Flat | Ready | 1 395 sqft | AED 1 550 000 | 1 111 |
| 20 Oct 2026 | 2 B/R Flat | Ready | 1 397 sqft | AED 1 400 000 | 1 002 |
| 24 Sep 2026 | Studio Flat | Ready | 517 sqft | AED 600 000 | 1 161 |
| 21 Sep 2026 | Studio Flat | Ready | 464 sqft | AED 492 500 | 1 061 |
| 13 Aug 2026 | 2 B/R Flat | Ready | 1 395 sqft | AED 1 550 000 | 1 111 |
| 22 Jul 2026 | 2 B/R Flat | Ready | 651 sqft | AED 500 000 | 768 |
| 13 Jul 2026 | Studio Flat | Ready | 467 sqft | AED 600 000 | 1 284 |
| 7 Jul 2026 | Studio Flat | Ready | 465 sqft | AED 640 000 | 1 377 |
| 15 Jun 2026 | Studio Flat | Ready | 464 sqft | AED 560 000 | 1 207 |
| 10 Mar 2026 | Studio Flat | Ready | 465 sqft | AED 550 000 | 1 183 |
| 19 Feb 2026 | Studio Flat | Ready | 467 sqft | AED 550 000 | 1 177 |
| 12 Feb 2026 | 2 B/R Flat | Ready | 1 341 sqft | AED 1 650 000 | 1 230 |
| 13 Jan 2026 | Studio Flat | Ready | 510 sqft | AED 695 000 | 1 364 |
| 25 Nov 2025 | Studio Flat | Ready | 465 sqft | AED 695 000 | 1 495 |
| 20 Nov 2025 | 2 B/R Flat | Ready | 1 157 sqft | AED 1 270 000 | 1 098 |
| 11 Nov 2025 | 2 B/R Flat | Ready | 1 281 sqft | AED 1 625 000 | 1 269 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Burj View Residence: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Aug 2025 – Jul 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 12 | AED 600k | 1 180 | AED 9.79M |
| 2025 | 54 | AED 1.08M | 1 319 | AED 56.20M |
| 2024 | 115 | AED 662k | 911 | AED 88.57M |
| 2023 | 60 | AED 633k | 774 | AED 38.18M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2017–2026
Studio: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | Studio | 1-bed flat | 2-bed flat | Gross yield |
|---|---|---|---|---|
| 2026 YTD | 52k | 72k | — | — |
| 2025 | 52k | 73k | — | 6.99% |
| 2024 | 34k | 48k | — | 7.19% |
| 2023 | 31k | 44k | 62k | 6.59% |
| 2022 | 27k | 39k | 59k | — |
| 2021 | 24k | 38k | 54k | — |
| 2020 | 29k | — | 59k | — |
| 2019 | 34k | 46k | 66k | — |
| 2018 | 43k | 64k | 79k | — |
| 2017 | 46k | 66k | 85k | — |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jul 2025 | 5 | AED 1.10M | 1 256 | 1 221 – 1 358 |
| Jun 2025 | 8 | AED 942k | 1 315 | 1 248 – 1 391 |
| May 2025 | 0 | — | — | — |
| Apr 2025 | 8 | AED 1.11M | 1 330 | 1 245 – 1 377 |
| Mar 2025 | 9 | AED 1.59M | 1 228 | 1 223 – 1 425 |
| Feb 2025 | 7 | AED 683k | 1 418 | 1 310 – 1 427 |
| Jan 2025 | 12 | AED 724k | 1 376 | 1 299 – 1 395 |
| Dec 2024 | 6 | AED 1.37M | 1 394 | 1 324 – 1 523 |
| Nov 2024 | 9 | AED 760k | 1 370 | 1 325 – 1 418 |
| Oct 2024 | 9 | AED 672k | 1 390 | 1 304 – 1 401 |
| Sep 2024 | 9 | AED 662k | 1 398 | 1 341 – 1 412 |
| Aug 2024 | 1 | — | — | — |
| Jul 2024 | 0 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 15 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Burj View Residence. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| La Fontana Di Trevi Finished · Triveni Builders & Promoters Limited |
394 m | 100% |
| Villa Lantana 2 Finished · Dbt One Residential Projects L.L.C |
427 m | 100% |
| Pearl Mizin Cancelled · Pearl Properties L.L.C |
444 m | 26% |
| Jewelz Residence Finished · Danube Properties Development L.L.C |
529 m | 100% |
| Aryene Greens Active · Diamond Star Real Estate Development L.L.C |
541 m | 80% |
| Vincitore Palacio Finished · Vincitore Real Estate Development L.L.C |
546 m | 100% |
| Samana Green Finished · Samana International Real Estate Development L.L.C |
569 m | 100% |
| Lincoln Park Finished · Damac Development(L L C) |
622 m | 100% |
| Platinum 1 Finished · Acw Holding Ltd |
720 m | 100% |
| The Light Finished · Acw Holding Ltd |
726 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Arjan
Questions about Burj View Residence
Who is the developer of Burj View Residence?
The Dubai Land Department project registry lists Al Madar Investment (L.L.C) as the developer of Burj View Residence.
Is Burj View Residence completed?
The DLD registry status of Burj View Residence is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 4 Aug 2016 — a registry date, not a handover promise.
How many homes are in Burj View Residence?
The DLD registry records 120 units in Burj View Residence.
What is the price per square foot in Burj View Residence?
Over the last 12 complete months the median registered sale in Burj View Residence was AED 640k, or AED 1 183 per sqft, from 15 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Burj View Residence?
The escrow agent recorded by DLD for Burj View Residence is Abu Dhabi Commercial Bank.
Where is Burj View Residence?
Burj View Residence is in the Arjan community. 10 other projects with a page on this site are registered within 1.2 km; the closest is La Fontana Di Trevi, about 394 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗