Candace Acacia Hotel Apartments
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Candace Acacia Hotel Apartments: ChatGPT · Claude · Perplexity
Candace Acacia Hotel Apartments is a project by Azizi Developments L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 24 sales registered in the trailing 12 months at a median AED 532k (1 322 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 24 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Azizi Developments L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 20 Mar 2016 |
| Construction started | 1 Mar 2016 |
| Declared completion | 1 Nov 2017 — registry date, not a handover promise |
| Units in the project | 318 |
| Project area | 15 366 sqm |
| Escrow agent | Abu Dhabi Commercial Bank |
| Project number | 1737 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2024: in the 26 months since, no month reached the five registered sales a median needs (57 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 9 Aug 2016 at 22.1% to 28 Nov 2017 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 28 Nov 2017 | 100.0% | +1.0 pp |
| 9 Nov 2017 | 99.0% | +13.8 pp |
| 6 Aug 2017 | 85.2% | +24.2 pp |
| 25 Apr 2017 | 61.0% | +24.2 pp |
| 3 Jan 2017 | 36.9% | +14.8 pp |
| 9 Aug 2016 | 22.1% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (16) | 16 | AED 520k | 1 380 | 377 sqft | — | — |
| 1-bedroom apartments low sample (8) | 8 | AED 840k | 1 119 | 765 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 29 Oct 2026 | Studio Hotel Apartment | Ready | 377 sqft | AED 535 000 | 1 420 |
| 29 Sep 2026 | Studio Hotel Apartment | Ready | 377 sqft | AED 498 000 | 1 322 |
| 28 Sep 2026 | Studio Hotel Apartment | Ready | 463 sqft | AED 510 000 | 1 102 |
| 13 Aug 2026 | Studio Hotel Apartment | Ready | 377 sqft | AED 505 000 | 1 340 |
| 13 Jul 2026 | 1 B/R Hotel Apartment | Ready | 766 sqft | AED 800 000 | 1 045 |
| 10 Jul 2026 | 1 B/R Hotel Apartment | Ready | 759 sqft | AED 1 500 000 | 1 976 |
| 8 May 2026 | Studio Hotel Apartment | Ready | 377 sqft | AED 520 000 | 1 380 |
| 7 May 2026 | 1 B/R Hotel Apartment | Ready | 773 sqft | AED 900 000 | 1 164 |
| 6 May 2026 | 1 B/R Hotel Apartment | Ready | 765 sqft | AED 784 255 | 1 025 |
| 1 May 2026 | Studio Hotel Apartment | Ready | 377 sqft | AED 525 000 | 1 394 |
| 30 Apr 2026 | Studio Hotel Apartment | Ready | 377 sqft | AED 540 000 | 1 433 |
| 24 Apr 2026 | Studio Hotel Apartment | Off-plan | 427 sqft | AED 529 308 | 1 239 |
| 14 Apr 2026 | Studio Hotel Apartment | Ready | 377 sqft | AED 498 000 | 1 322 |
| 6 Apr 2026 | Studio Hotel Apartment | Ready | 413 sqft | AED 570 000 | 1 381 |
| 31 Mar 2026 | Studio Hotel Apartment | Ready | 377 sqft | AED 460 000 | 1 221 |
| 3 Mar 2026 | Studio Hotel Apartment | Ready | 377 sqft | AED 495 000 | 1 314 |
| 26 Feb 2026 | 1 B/R Hotel Apartment | Ready | 765 sqft | AED 850 000 | 1 111 |
| 25 Feb 2026 | Studio Hotel Apartment | Ready | 377 sqft | AED 550 000 | 1 460 |
| 29 Jan 2026 | 1 B/R Hotel Apartment | Ready | 736 sqft | AED 830 000 | 1 128 |
| 29 Jan 2026 | 1 B/R Hotel Apartment | Ready | 771 sqft | AED 850 000 | 1 102 |
| 26 Jan 2026 | Studio Hotel Apartment | Ready | 375 sqft | AED 520 000 | 1 386 |
| 18 Dec 2025 | Studio Hotel Apartment | Ready | 377 sqft | AED 520 000 | 1 380 |
| 24 Nov 2025 | Studio Hotel Apartment | Ready | 377 sqft | AED 530 000 | 1 404 |
| 11 Nov 2025 | 1 B/R Hotel Apartment | Ready | 722 sqft | AED 820 000 | 1 135 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Candace Acacia Hotel Apartments: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Sep 2024 – Aug 2025
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 21 | AED 535k | 1 322 | AED 13.77M |
| 2025 | 25 | AED 552k | 1 301 | AED 15.38M |
| 2024 | 38 | AED 609k | 1 139 | AED 25.40M |
| 2023 | 36 | AED 455k | 1 095 | AED 20.62M |
| 2022 | 13 | AED 355k | 902 | AED 4.95M |
| 2021 | 6 | AED 507k | 827 | AED 2.98M |
| 2020 | 14 | AED 502k | 851 | AED 6.99M |
| 2019 | 19 | AED 403k | 1 043 | AED 9.31M |
| 2018 | 43 | AED 533k | 1 373 | AED 26.16M |
| 2017 | 161 | AED 546k | 1 393 | AED 105.50M |
| 2016 | 69 | AED 533k | 1 368 | AED 37.14M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2018–2026
Studio: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | Studio | 1-bed flat | Gross yield |
|---|---|---|---|
| 2026 YTD | 46k | 70k | — |
| 2025 | 47k | 70k | 8.70% |
| 2024 | 45k | 66k | 8.46% |
| 2023 | 38k | 60k | 9.05% |
| 2022 | 31k | 48k | — |
| 2021 | 25k | 40k | — |
| 2020 | 26k | 44k | — |
| 2019 | 34k | 55k | 8.50% |
| 2018 | 37k | 59k | 7.06% |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Aug 2024 | 6 | AED 760k | 997 | 824 – 1 123 |
| Jul 2024 | 4 | — | — | — |
| Jun 2024 | 4 | — | — | — |
| May 2024 | 7 | AED 849k | 1 188 | 1 118 – 1 249 |
| Apr 2024 | 2 | — | — | — |
| Mar 2024 | 3 | — | — | — |
| Feb 2024 | 0 | — | — | — |
| Jan 2024 | 1 | — | — | — |
| Dec 2023 | 1 | — | — | — |
| Nov 2023 | 3 | — | — | — |
| Oct 2023 | 3 | — | — | — |
| Sep 2023 | 3 | — | — | — |
| Aug 2023 | 4 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Candace Acacia Hotel Apartments. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Candace Aster Hotel Apartments Finished · Azizi Developments L.L.C |
107 m | 100% |
| Azizi. Freesia Finished · Azizi Developments L.L.C |
207 m | 100% |
| Azizi. Daisy Finished · Azizi Developments L.L.C |
265 m | 100% |
| Micasa Avenue Finished · Diamond Real Estate Developer |
350 m | 100% |
| Roy Mediterranean Hotel Apartments Finished · Azizi Developments L.L.C |
491 m | 100% |
| Victoria Residency Finished · C P L Real Estate Development L.L.C |
504 m | 100% |
| Azizi. Tulip Finished · Azizi Developments L.L.C |
557 m | 100% |
| Alfurjan Package 4 Finished · Alfurjan ( L.L.C ) |
788 m | 100% |
| Alfurjan Package 6 Finished · Alfurjan ( L.L.C ) |
975 m | 100% |
| Azizi Berton Finished · Azizi Developments L.L.C |
978 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Al Furjan
Questions about Candace Acacia Hotel Apartments
Who is the developer of Candace Acacia Hotel Apartments?
The Dubai Land Department project registry lists Azizi Developments L.L.C as the developer of Candace Acacia Hotel Apartments.
Is Candace Acacia Hotel Apartments completed?
The DLD registry status of Candace Acacia Hotel Apartments is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 1 Nov 2017 — a registry date, not a handover promise.
How many homes are in Candace Acacia Hotel Apartments?
The DLD registry records 318 units in Candace Acacia Hotel Apartments.
What is the price per square foot in Candace Acacia Hotel Apartments?
Over the last 12 complete months the median registered sale in Candace Acacia Hotel Apartments was AED 532k, or AED 1 322 per sqft, from 24 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Candace Acacia Hotel Apartments?
The escrow agent recorded by DLD for Candace Acacia Hotel Apartments is Abu Dhabi Commercial Bank.
Where is Candace Acacia Hotel Apartments?
Candace Acacia Hotel Apartments is in the Al Furjan community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Candace Aster Hotel Apartments, about 107 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗
Cite or reuse this data
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Candace Acacia Hotel Apartments — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/candace-acacia-hotel-apartments/”. Reuse is permitted with attribution.