Data Dubai

Candace Aster Hotel Apartments

Candace Aster Hotel ApartmentsFinished100% built229 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Candace Aster Hotel Apartments: ChatGPT · Claude · Perplexity

Candace Aster Hotel Apartments is a project by Azizi Developments L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 15 sales registered in the trailing 12 months at a median AED 564k (1 377 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 564k +7.9% y/y
≈ US$ 154k · typical range AED 540k – AED 802k
DLD verified
Median price per sqft
AED 1 377/sqft +19.4% y/y
typical range 1 144 – 1 464 AED/sqft
DLD verified
Registered sales
15 -11.8% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
6.7%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 15 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAzizi Developments L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD20 Mar 2016
Construction started1 Mar 2016
Declared completion20 Sep 2017 — registry date, not a handover promise
Units in the project229
Project area11 765 sqm
Escrow agentAbu Dhabi Commercial Bank
Project number1738

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Sep 2024: in the 25 months since, no month reached the five registered sales a median needs (35 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 6 technical inspections for this project, from 9 Aug 2016 at 20.0% to 5 Dec 2017 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2017-09-202016-08-092017-12-05

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
5 Dec 2017100.0% +1.5 pp
9 Nov 201798.5% +13.2 pp
6 Aug 201785.3% +23.5 pp
25 Apr 201761.8% +25.2 pp
3 Jan 201736.6% +16.6 pp
9 Aug 201620.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios low sample (11) 11AED 545k 1 424 377 sqft — —
1-bedroom apartments insufficient data 2— — — — —
2-bedroom apartments insufficient data 2— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
20 Nov 20262 B/R Hotel ApartmentReady 1 137 sqftAED 1 300 000 1 143
30 Sep 2026Studio Hotel ApartmentReady 371 sqftAED 540 000 1 456
21 Sep 2026Studio Hotel ApartmentReady 380 sqftAED 560 000 1 474
20 Jul 2026Studio Hotel ApartmentReady 840 sqftAED 575 000 685
7 Jul 2026Studio Hotel ApartmentReady 374 sqftAED 550 000 1 473
29 Apr 2026Studio Hotel ApartmentReady 374 sqftAED 515 000 1 377
29 Apr 2026Studio Hotel ApartmentReady 375 sqftAED 525 000 1 400
24 Apr 2026Studio Hotel ApartmentOff-plan 378 sqftAED 491 768 1 302
13 Mar 20261 B/R Hotel ApartmentReady 761 sqftAED 870 000 1 144
17 Feb 20262 B/R Hotel ApartmentReady 1 137 sqftAED 1 275 000 1 121
11 Feb 2026Studio Hotel ApartmentReady 380 sqftAED 480 000 1 264
3 Feb 2026Studio Hotel ApartmentReady 376 sqftAED 568 000 1 512
29 Dec 20252 B/R Hotel ApartmentReady 1 137 sqftAED 1 160 002 1 020
18 Dec 20251 B/R Hotel ApartmentReady 760 sqftAED 870 000 1 145
14 Nov 2025Studio Hotel ApartmentReady 379 sqftAED 540 000 1 424
10 Nov 2025Studio Hotel ApartmentReady 377 sqftAED 600 000 1 592

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Candace Aster Hotel Apartments: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

05010020162017201820192020202120222023202420252026050100201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

024OctNovDecJanFebMarAprMayJunJulAugSep024NovJanMarMayJulSep

registered sales per month, Oct 2024 – Sep 2025

YearSalesMedian priceMedian AED/sqftTotal registered value
202611AED 555k 1 377AED 6.46M
202519AED 535k 1 214AED 10.99M
202438AED 737k 1 132AED 27.32M
202329AED 420k 1 105AED 13.10M
20226AED 355k 901AED 2.28M
202112AED 325k 841AED 4.15M
20204— —AED 1.24M
201915AED 400k 1 071AED 6.15M
201832AED 507k 1 311AED 21.83M
201799AED 507k 1 316AED 68.63M
201675AED 493k 1 287AED 37.19M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Sep 20246 AED 534k1 193 1 124 – 1 256
Aug 20247 AED 853k1 128 1 029 – 1 174
Jul 20243 —— —
Jun 20243 —— —
May 202410 AED 838k1 119 1 100 – 1 172
Apr 20243 —— —
Mar 20241 —— —
Feb 20240 —— —
Jan 20240 —— —
Dec 20230 —— —
Nov 20232 —— —
Oct 20232 —— —
Sep 20234 —— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 15 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Candace Aster Hotel Apartments. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Azizi. Freesia
Finished · Azizi Developments L.L.C
100 m100%98
Candace Acacia Hotel Apartments
Finished · Azizi Developments L.L.C
107 m100%318
Azizi. Daisy
Finished · Azizi Developments L.L.C
158 m100%129
Micasa Avenue
Finished · Diamond Real Estate Developer
392 m100%64
Victoria Residency
Finished · C P L Real Estate Development L.L.C
397 m100%103
Azizi. Tulip
Finished · Azizi Developments L.L.C
449 m100%97
Roy Mediterranean Hotel Apartments
Finished · Azizi Developments L.L.C
521 m100%273
Alfurjan Package 4
Finished · Alfurjan ( L.L.C )
713 m100%244
Alfurjan Package 6
Finished · Alfurjan ( L.L.C )
877 m100%151
Azizi. Liatris
Finished · Azizi Developments L.L.C
927 m100%129

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Al Furjan

Questions about Candace Aster Hotel Apartments

Who is the developer of Candace Aster Hotel Apartments?

The Dubai Land Department project registry lists Azizi Developments L.L.C as the developer of Candace Aster Hotel Apartments.

Is Candace Aster Hotel Apartments completed?

The DLD registry status of Candace Aster Hotel Apartments is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 20 Sep 2017 — a registry date, not a handover promise.

How many homes are in Candace Aster Hotel Apartments?

The DLD registry records 229 units in Candace Aster Hotel Apartments.

What is the price per square foot in Candace Aster Hotel Apartments?

Over the last 12 complete months the median registered sale in Candace Aster Hotel Apartments was AED 564k, or AED 1 377 per sqft, from 15 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Candace Aster Hotel Apartments?

The escrow agent recorded by DLD for Candace Aster Hotel Apartments is Abu Dhabi Commercial Bank.

Where is Candace Aster Hotel Apartments?

Candace Aster Hotel Apartments is in the Al Furjan community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Azizi. Freesia, about 100 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Candace Aster Hotel Apartments — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/candace-aster-hotel-apartments/”. Reuse is permitted with attribution.