Damac Bay
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Damac Bay: ChatGPT · Claude · Perplexity
Damac Bay is a project by Damac J R Two Investment L.L.C, recorded at 34% complete at its last Dubai Land Department inspection. 48 sales registered in the trailing 12 months at a median AED 3.97M (3 317 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 48 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Damac J R Two Investment L.L.C |
| Status | Active |
| Construction progress | 34% — at the last DLD inspection |
| Registered with DLD | 26 Jan 2023 |
| Construction started | 15 Apr 2023 |
| Declared completion | 15 Jan 2027 — registry date, not a handover promise |
| Units in the project | 1 087 |
| Project area | 136 056 sqm |
| Escrow agent | Emirates Nbd Bank (P.J.S.C) |
| Project number | 2559 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 10 technical inspections for this project, from 18 Jan 2023 at 0.0% to 18 Aug 2026 at 33.8%. Over the inspections since 15 Apr 2025 it moved 1.08 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 18 Aug 2026 | 33.8% | +4.9 pp |
| 17 Apr 2026 | 28.9% | +4.4 pp |
| 15 Dec 2025 | 24.5% | +8.2 pp |
| 15 Apr 2025 | 16.3% | +7.5 pp |
| 11 Dec 2024 | 8.8% | +2.9 pp |
| 5 Jul 2024 | 5.9% | +1.7 pp |
| 13 Mar 2024 | 4.2% | +1.7 pp |
| 5 Dec 2023 | 2.5% | +2.4 pp |
| 7 Sep 2023 | 0.0% | +0.0 pp |
| 18 Jan 2023 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
Off-plan sale registrations in Damac Bay (1 130) already equal 100% of the 1 069 homes in the DLD unit register, as of 23 Nov 2026. Few homes, if any, are left without a registered sale — the count includes resales, so a small number may still be unsold.
| Homes | In unit register | Registered sales |
|---|---|---|
| 1 bedroom | 638 | 680 |
| 2 bedrooms | 269 | 288 |
| 3 bedrooms | 138 | 145 |
| 4+ bedrooms | 24 | 17 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments | 38 | AED 3.91M | 3 210 | 1 255 sqft | — | — |
| 2-bedroom apartments low sample (7) | 7 | AED 5.29M | 3 747 | 1 408 sqft | — | — |
| 3-bedroom apartments insufficient data | 3 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 20 Nov 2026 | 1 B/R Flat — TOWER B | Off-plan | 1 303 sqft | AED 3 833 280 | 2 942 |
| 29 Oct 2026 | 2 B/R Flat — TOWER C | Off-plan | 1 365 sqft | AED 4 936 000 | 3 617 |
| 26 Oct 2026 | 1 B/R Flat — TOWER A | Off-plan | 1 256 sqft | AED 3 874 560 | 3 085 |
| 19 Oct 2026 | 1 B/R Flat — TOWER B | Off-plan | 1 304 sqft | AED 3 856 320 | 2 958 |
| 5 Oct 2026 | 1 B/R Flat — TOWER B | Off-plan | 1 303 sqft | AED 3 678 825 | 2 823 |
| 5 Oct 2026 | 1 B/R Flat — TOWER C | Off-plan | 1 252 sqft | AED 4 093 440 | 3 269 |
| 25 Sep 2026 | 1 B/R Flat — TOWER B | Off-plan | 833 sqft | AED 3 089 000 | 3 707 |
| 25 Sep 2026 | 2 B/R Flat — TOWER C | Off-plan | 1 738 sqft | AED 7 100 000 | 4 086 |
| 9 Sep 2026 | 1 B/R Flat — TOWER C | Off-plan | 822 sqft | AED 3 414 000 | 4 152 |
| 28 Jul 2026 | 1 B/R Flat — TOWER A | Off-plan | 1 304 sqft | AED 4 177 150 | 3 205 |
| 8 Jun 2026 | 1 B/R Flat — TOWER B | Off-plan | 785 sqft | AED 3 119 000 | 3 973 |
| 21 May 2026 | 2 B/R Flat — TOWER C | Off-plan | 1 365 sqft | AED 5 292 000 | 3 878 |
| 28 Apr 2026 | 1 B/R Flat — TOWER A | Off-plan | 1 306 sqft | AED 3 686 440 | 2 823 |
| 16 Apr 2026 | 1 B/R Flat — TOWER A | Off-plan | 1 304 sqft | AED 4 071 000 | 3 123 |
| 13 Apr 2026 | 1 B/R Flat — TOWER A | Off-plan | 1 285 sqft | AED 3 949 000 | 3 072 |
| 9 Apr 2026 | 1 B/R Flat — TOWER A | Off-plan | 1 306 sqft | AED 3 951 360 | 3 026 |
| 6 Apr 2026 | 1 B/R Flat — TOWER A | Off-plan | 1 300 sqft | AED 4 034 000 | 3 104 |
| 30 Mar 2026 | 1 B/R Flat — TOWER A | Off-plan | 786 sqft | AED 3 488 120 | 4 439 |
| 26 Mar 2026 | 1 B/R Flat — TOWER A | Off-plan | 1 304 sqft | AED 3 919 680 | 3 007 |
| 9 Mar 2026 | 1 B/R Flat — TOWER B | Off-plan | 1 255 sqft | AED 3 895 650 | 3 103 |
| 6 Mar 2026 | 1 B/R Flat — TOWER B | Off-plan | 1 303 sqft | AED 4 137 000 | 3 175 |
| 4 Mar 2026 | 1 B/R Flat — TOWER B | Off-plan | 929 sqft | AED 3 484 000 | 3 749 |
| 27 Feb 2026 | 1 B/R Flat — TOWER B | Off-plan | 1 234 sqft | AED 4 093 000 | 3 317 |
| 18 Feb 2026 | 1 B/R Flat — TOWER B | Off-plan | 1 234 sqft | AED 3 843 180 | 3 114 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Damac Bay: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 35 | AED 3.95M | 3 293 | AED 145.17M |
| 2025 | 94 | AED 4.01M | 3 390 | AED 415.10M |
| 2024 | 163 | AED 4.20M | 3 558 | AED 782.77M |
| 2023 | 838 | AED 3.91M | 3 894 | AED 4.03B |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Oct 2026 | 5 | AED 3.87M | 3 085 | 2 958 – 3 269 |
| Sep 2026 | 3 | — | — | — |
| Aug 2026 | 0 | — | — | — |
| Jul 2026 | 1 | — | — | — |
| Jun 2026 | 1 | — | — | — |
| May 2026 | 1 | — | — | — |
| Apr 2026 | 5 | AED 3.95M | 3 072 | 3 026 – 3 104 |
| Mar 2026 | 5 | AED 3.90M | 3 175 | 3 103 – 3 749 |
| Feb 2026 | 8 | AED 4.06M | 3 488 | 3 263 – 4 111 |
| Jan 2026 | 6 | AED 3.93M | 3 607 | 3 287 – 4 206 |
| Dec 2025 | 5 | AED 4.24M | 3 374 | 3 211 – 3 551 |
| Nov 2025 | 8 | AED 3.95M | 3 359 | 3 129 – 4 010 |
| Oct 2025 | 6 | AED 4.24M | 3 852 | 3 353 – 4 280 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
Buildings in this project
| Building (DLD name) | Sales | Median price | Median AED/sqft | Off-plan |
|---|---|---|---|---|
| Damac Bay - Tower B | 20 | AED 3.92M | 3 264 | 100.0% |
| Damac Bay - Tower A low sample (18) | 18 | AED 3.99M | 3 205 | 100.0% |
| Damac Bay - Tower C low sample (10) | 10 | AED 4.32M | 3 982 | 100.0% |
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai Harbour
Questions about Damac Bay
Who is the developer of Damac Bay?
The Dubai Land Department project registry lists Damac J R Two Investment L.L.C as the developer of Damac Bay.
Is Damac Bay completed?
The DLD registry status of Damac Bay is Active, 34% complete at the last DLD inspection. The declared completion date in the registry is 15 Jan 2027 — a registry date, not a handover promise.
How many homes are in Damac Bay?
The DLD registry records 1 087 units in Damac Bay. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in Damac Bay?
Over the last 12 complete months the median registered sale in Damac Bay was AED 3.97M, or AED 3 317 per sqft, from 48 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Damac Bay?
The escrow agent recorded by DLD for Damac Bay is Emirates Nbd Bank (P.J.S.C).
Where is Damac Bay?
Damac Bay is in the Dubai Harbour community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Damac Bay. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.