Damac City

Damac CityActive73% built511 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Damac City: ChatGPT · Claude · Perplexity

Damac City is a project by J A Parks L.L.C, recorded at 73% complete at its last Dubai Land Department inspection. 48 sales registered in the trailing 12 months at a median AED 2.72M (2 232 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 2.72M -2.7% y/y
≈ US$ 741k · typical range AED 1.87M – AED 4.23M
DLD verified
Median price per sqft
AED 2 232/sqft +0.7% y/y
typical range 2 161 – 2 679 AED/sqft
DLD verified
Registered sales
48 -35.1% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 48 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperJ A Parks L.L.C
StatusActive
Construction progress73% — at the last DLD inspection
Registered with DLD18 Mar 2022
Construction started1 Jun 2022
Declared completion30 Dec 2025 — registry date, not a handover promise
Units in the project511
Project area70 343 sqm
Escrow agentEmirates Nbd Bank (P.J.S.C)
Project number2374

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

2 0002 5003 000May 2022Nov 2022May 2023Nov 2023May 2024Nov 2024May 2025Nov 2025May 20262 0002 5003 000May 2022Nov 2023May 2025

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at May 2026: in the 5 months since, no month reached the five registered sales a median needs (6 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 13 technical inspections for this project, from 26 Sep 2022 at 0.1% to 30 Sep 2026 at 72.8%. Over the inspections since 4 Jul 2025 it moved 2.34 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2025-12-302022-09-262026-09-30

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
30 Sep 202672.8% +4.1 pp
15 Jul 202668.7% +9.8 pp
24 Mar 202658.8% +16.8 pp
15 Nov 202542.1% +4.1 pp
4 Jul 202537.9% +14.3 pp
1 Feb 202523.7% +3.6 pp
18 Oct 202420.0% +6.6 pp
20 Jun 202413.4% +3.3 pp
25 Mar 202410.1% +4.0 pp
15 Aug 20236.2% +0.2 pp
31 May 20236.0% +1.9 pp
24 Jan 20234.1% +4.0 pp
26 Sep 20220.1% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Homes and registered off-plan sales

Off-plan sale registrations in Damac City (613) already equal 100% of the 509 homes in the DLD unit register, as of 23 Nov 2026. Few homes, if any, are left without a registered sale — the count includes resales, so a small number may still be unsold.

HomesIn unit
register
Registered
sales
1 bedroom205263
2 bedrooms249295
3 bedrooms4550
4+ bedrooms105

Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗

Homes without a registered sale in all Dubai off-plan projects →

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments 23AED 1.87M 2 232 839 sqft — —
2-bedroom apartments 21AED 4.21M 2 329 1 827 sqft — —
3-bedroom apartments insufficient data 3— — — — —
4-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
12 Oct 20261 B/R Flat — TOWER BOff-plan 838 sqftAED 1 811 000 2 161
12 Oct 20261 B/R Flat — TOWER BOff-plan 839 sqftAED 1 873 000 2 232
9 Oct 20261 B/R Flat — TOWER AOff-plan 1 167 sqftAED 2 896 320 2 482
1 Sep 20263 B/R Flat — TOWER AOff-plan 2 119 sqftAED 5 369 000 2 533
9 Jun 20261 B/R Flat — TOWER BOff-plan 839 sqftAED 2 303 000 2 745
8 Jun 20261 B/R Flat — TOWER BOff-plan 839 sqftAED 1 839 000 2 192
18 May 20261 B/R Flat — TOWER BOff-plan 839 sqftAED 2 320 000 2 765
18 May 20262 B/R Flat — TOWER BOff-plan 1 704 sqftAED 4 592 000 2 695
14 May 20262 B/R Flat — TOWER BOff-plan 1 598 sqftAED 4 273 000 2 673
14 May 20261 B/R Flat — TOWER BOff-plan 839 sqftAED 2 141 790 2 553
14 May 20262 B/R Flat — TOWER AOff-plan 2 171 sqftAED 4 555 240 2 098
5 May 20261 B/R Flat — TOWER BOff-plan 839 sqftAED 2 233 910 2 663
4 May 20261 B/R Flat — TOWER BOff-plan 839 sqftAED 1 873 000 2 232
28 Apr 20261 B/R Flat — TOWER BOff-plan 839 sqftAED 2 722 790 3 245
20 Apr 20262 B/R Flat — TOWER AOff-plan 2 760 sqftAED 9 714 740 3 520
15 Apr 20261 B/R Flat — TOWER BOff-plan 839 sqftAED 2 303 000 2 745
9 Apr 20262 B/R Flat — TOWER BOff-plan 2 466 sqftAED 6 682 560 2 710
7 Apr 20262 B/R Flat — TOWER BOff-plan 2 553 sqftAED 6 737 280 2 639
30 Mar 20262 B/R Flat — TOWER AOff-plan 3 395 sqftAED 11 100 000 3 269
30 Mar 20262 B/R Flat — TOWER BOff-plan 1 550 sqftAED 3 284 498 2 119
27 Mar 20261 B/R Flat — TOWER BOff-plan 838 sqftAED 1 811 000 2 161
27 Mar 20262 B/R Flat — TOWER BOff-plan 2 189 sqftAED 4 368 184 1 995
27 Mar 20261 B/R Flat — TOWER BOff-plan 839 sqftAED 1 873 000 2 232
27 Mar 20262 B/R Flat — TOWER AOff-plan 1 827 sqftAED 3 757 372 2 057

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Damac City: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

020040020222023202420252026020040020222023202420252026

registered sales per calendar year; the current year is incomplete

By month

01020NovDecJanFebMarAprMayJunJulAugSepOct01020DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202644AED 2.65M 2 232AED 139.13M
202570AED 2.81M 2 334AED 242.87M
202433AED 2.54M 2 070AED 92.47M
202373AED 2.48M 2 425AED 209.60M
2022393AED 2.54M 2 221AED 1.17B

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
May 20267 AED 2.32M2 663 2 393 – 2 684
Apr 20265 AED 6.68M2 745 2 710 – 3 245
Mar 202619 AED 1.87M2 190 2 119 – 2 232
Feb 20263 —— —
Jan 20262 —— —
Dec 20252 —— —
Nov 20251 —— —
Oct 20252 —— —
Sep 20253 —— —
Aug 20251 —— —
Jul 20251 —— —
Jun 20257 AED 4.34M2 764 2 456 – 3 274
May 202511 AED 2.94M2 801 2 473 – 3 328

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

Buildings in this project

Building (DLD name)SalesMedian priceMedian AED/sqftOff-plan
Damac City Tower B 32AED 2.01M 2 232100.0%
Damac City Tower A low sample (16) 16AED 4.18M 2 482100.0%
Damac City Tower Podium insufficient data 0— ——

Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Dubai Water Canal

Questions about Damac City

Who is the developer of Damac City?

The Dubai Land Department project registry lists J A Parks L.L.C as the developer of Damac City.

Is Damac City completed?

The DLD registry status of Damac City is Active, 73% complete at the last DLD inspection. The declared completion date in the registry is 30 Dec 2025 — a registry date, not a handover promise.

How many homes are in Damac City?

The DLD registry records 511 units in Damac City. The split by number of bedrooms is in the unit register table on this page.

What is the price per square foot in Damac City?

Over the last 12 complete months the median registered sale in Damac City was AED 2.72M, or AED 2 232 per sqft, from 48 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Damac City?

The escrow agent recorded by DLD for Damac City is Emirates Nbd Bank (P.J.S.C).

Where is Damac City?

Damac City is in the Dubai Water Canal community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Damac City — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/damac-city/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Damac City. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.