Durar1
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Durar1: ChatGPT · Claude · Perplexity
Durar1 is a project by Durar Al Emarat Properties (L.L.C), recorded at 100% complete at its last Dubai Land Department inspection. 27 sales registered in the trailing 12 months at a median AED 750k (943 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 27 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Durar Al Emarat Properties (L.L.C) |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 8 Nov 2008 |
| Construction started | 24 May 2008 |
| Declared completion | 15 Aug 2013 — registry date, not a handover promise |
| Units in the project | 241 |
| Project area | 23 739 sqm |
| Escrow agent | First Abu Dhabi Bank P.J.S.C. |
| Project number | 880 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jan 2026: in the 9 months since, no month reached the five registered sales a median needs (16 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 2 technical inspections for this project, from 17 Sep 2012 at 96.2% to 3 Oct 2013 at 99.4%. Over the inspections since 17 Sep 2012 it moved 0.25 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 3 Oct 2013 | 99.4% | +3.2 pp |
| 17 Sep 2012 | 96.2% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (18) | 18 | AED 710k | 952 | 753 sqft | — | — |
| 2-bedroom apartments low sample (9) | 9 | AED 1.05M | 926 | 1 159 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 9 Nov 2026 | 1 B/R Flat — DURAR 1A | Ready | 716 sqft | AED 580 000 | 810 |
| 5 Nov 2026 | 2 B/R Flat — DURAR 1A | Ready | 1 156 sqft | AED 930 000 | 805 |
| 21 Oct 2026 | 2 B/R Flat — DURAR 1B | Ready | 1 139 sqft | AED 1 055 000 | 926 |
| 7 Oct 2026 | 1 B/R Flat — DURAR 1B | Ready | 716 sqft | AED 625 000 | 873 |
| 7 Aug 2026 | 2 B/R Flat — DURAR 1B | Ready | 1 225 sqft | AED 1 300 000 | 1 061 |
| 24 Jun 2026 | 1 B/R Flat — DURAR 1A | Ready | 753 sqft | AED 700 000 | 930 |
| 11 Jun 2026 | 2 B/R Flat — DURAR 1B | Ready | 1 225 sqft | AED 716 590 | 585 |
| 18 May 2026 | 1 B/R Flat — DURAR 1A | Ready | 717 sqft | AED 710 000 | 991 |
| 13 May 2026 | 1 B/R Flat — DURAR 1A | Ready | 717 sqft | AED 750 000 | 1 046 |
| 5 May 2026 | 1 B/R Flat — DURAR 1A | Ready | 717 sqft | AED 710 000 | 991 |
| 4 May 2026 | 1 B/R Flat — DURAR 1A | Ready | 770 sqft | AED 790 000 | 1 026 |
| 22 Apr 2026 | 1 B/R Flat — DURAR 1A | Ready | 763 sqft | AED 605 382 | 794 |
| 6 Apr 2026 | 1 B/R Flat — DURAR 1A | Ready | 763 sqft | AED 805 000 | 1 055 |
| 3 Apr 2026 | 1 B/R Flat — DURAR 1A | Ready | 763 sqft | AED 699 000 | 916 |
| 18 Mar 2026 | 1 B/R Flat — DURAR 1A | Ready | 716 sqft | AED 750 000 | 1 048 |
| 9 Mar 2026 | 1 B/R Flat — DURAR 1B | Ready | 753 sqft | AED 710 000 | 943 |
| 6 Mar 2026 | 2 B/R Flat — DURAR 1B | Ready | 1 159 sqft | AED 1 187 000 | 1 024 |
| 13 Feb 2026 | 2 B/R Flat — DURAR 1A | Ready | 1 159 sqft | AED 1 127 000 | 972 |
| 26 Jan 2026 | 1 B/R Flat — DURAR 1A | Ready | 716 sqft | AED 687 140 | 960 |
| 20 Jan 2026 | 1 B/R Flat — DURAR 1A | Ready | 753 sqft | AED 850 000 | 1 129 |
| 16 Jan 2026 | 1 B/R Flat — DURAR 1A | Ready | 770 sqft | AED 750 000 | 975 |
| 13 Jan 2026 | 2 B/R Flat — DURAR 1B | Ready | 1 225 sqft | AED 1 160 000 | 947 |
| 8 Jan 2026 | 2 B/R Flat — DURAR 1B | Ready | 1 159 sqft | AED 1 025 000 | 884 |
| 29 Dec 2025 | 1 B/R Flat — DURAR 1B | Ready | 1 241 sqft | AED 840 000 | 677 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Durar1: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 21 | AED 750k | 972 | AED 17.71M |
| 2025 | 40 | AED 856k | 892 | AED 37.11M |
| 2024 | 117 | AED 902k | 868 | AED 110.68M |
| 2023 | 83 | AED 809k | 857 | AED 69.85M |
| 2022 | 2 | — | — | AED 1.16M |
| 2016 | 1 | — | — | AED 800k |
| 2014 | 5 | AED 1.02M | — | AED 4.69M |
| 2012 | 1 | — | — | AED 1.18M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2019–2026
2-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | 1-bed flat | 2-bed flat | Gross yield |
|---|---|---|---|
| 2026 YTD | 55k | 75k | 7.75% |
| 2025 | 55k | 75k | 7.42% |
| 2024 | 49k | 65k | 6.66% |
| 2023 | 40k | 60k | 5.95% |
| 2022 | 40k | 61k | — |
| 2021 | 41k | 61k | — |
| 2020 | 41k | 61k | — |
| 2019 | 41k | 63k | — |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jan 2026 | 5 | AED 850k | 960 | 947 – 975 |
| Dec 2025 | 2 | — | — | — |
| Nov 2025 | 4 | — | — | — |
| Oct 2025 | 4 | — | — | — |
| Sep 2025 | 2 | — | — | — |
| Aug 2025 | 5 | AED 850k | 967 | 694 – 1 119 |
| Jul 2025 | 3 | — | — | — |
| Jun 2025 | 4 | — | — | — |
| May 2025 | 6 | AED 720k | 912 | 803 – 985 |
| Apr 2025 | 1 | — | — | — |
| Mar 2025 | 2 | — | — | — |
| Feb 2025 | 1 | — | — | — |
| Jan 2025 | 6 | AED 1.30M | 938 | 869 – 973 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
Buildings in this project
| Building (DLD name) | Sales | Median price | Median AED/sqft | Off-plan |
|---|---|---|---|---|
| Durar 1a low sample (17) | 17 | AED 750k | 972 | 0.0% |
| Durar 1b low sample (10) | 10 | AED 932k | 905 | 0.0% |
| Durar Business Tower insufficient data | 0 | — | — | — |
| Durar 1 Bldg 2 insufficient data | 0 | — | — | — |
| Durar 1 Bldg 1 insufficient data | 0 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Durar1. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Shorooq Land 1 Finished · Wishes Land Real Estate Development L.L.C |
123 m | 100% |
| Shorooq Land 2 Finished · Wishes Land Real Estate Development L.L.C |
133 m | 100% |
| Desert Sun Tower Finished · Behnam Ali Keivan |
171 m | 100% |
| Sky Courts Finished · Sky Courts (L.L.C) |
183 m | 100% |
| Solitaire Cascades Finished · Universal Developers (Fzc) |
393 m | 100% |
| Safeer Residences 2 Cancelled · Alseeb Real Estate Development L.L.C |
437 m | 55% |
| Indigo Tower Finished · Indigo Valley Inc Limited |
489 m | 100% |
| Sondos Rosa Finished · Al Sondos Real Estate L.L.C |
541 m | 100% |
| Sondos Lilac Finished · Al Sondos Real Estate L.L.C |
545 m | 100% |
| Sondos Orchid Finished · Al Sondos Real Estate L.L.C |
586 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Dubai Land Residence Complex
Questions about Durar1
Who is the developer of Durar1?
The Dubai Land Department project registry lists Durar Al Emarat Properties (L.L.C) as the developer of Durar1.
Is Durar1 completed?
The DLD registry status of Durar1 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 15 Aug 2013 — a registry date, not a handover promise.
How many homes are in Durar1?
The DLD registry records 241 units in Durar1.
What is the price per square foot in Durar1?
Over the last 12 complete months the median registered sale in Durar1 was AED 750k, or AED 943 per sqft, from 27 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Durar1?
The escrow agent recorded by DLD for Durar1 is First Abu Dhabi Bank P.J.S.C..
Where is Durar1?
Durar1 is in the Dubai Land Residence Complex community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Shorooq Land 1, about 123 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗