Dusk By Binghatti
Updated 25 Nov 2026 · latest DLD registrations 25 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Dusk By Binghatti: ChatGPT · Claude · Perplexity
Dusk By Binghatti is a project by Binghatti Developers Fze, recorded at 100% complete at its last Dubai Land Department inspection. 9 sales registered in the trailing 12 months at a median AED 1.04M (1 928 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 25 Nov 2026 · sample 9 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Binghatti Developers Fze |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 29 Aug 2024 |
| Construction started | 1 Jan 2024 |
| Declared completion | 31 Dec 2024 — registry date, not a handover promise |
| Units in the project | 107 |
| Project area | 7 268 sqm |
| Escrow agent | Abu Dhabi Islamic Bank |
| Project number | 3024 |
Source: DLD project registry (Mashrooi) · Data through 25 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 25 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Sep 2025: in the 13 months since, no month reached the five registered sales a median needs (12 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 2 technical inspections for this project, from 15 May 2024 at 46.2% to 24 Apr 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 24 Apr 2025 | 100.0% | +53.8 pp |
| 15 May 2024 | 46.2% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 25 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (5) | 5 | AED 994k | 1 928 | 454 sqft | — | — |
| 1-bedroom apartments insufficient data | 4 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 25 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 20 Nov 2026 | 1 B/R Flat | Ready | 938 sqft | AED 1 200 000 | 1 280 |
| 11 Nov 2026 | Studio Flat | Ready | 453 sqft | AED 994 498 | 2 198 |
| 15 Oct 2026 | Studio Flat | Ready | 453 sqft | AED 725 000 | 1 602 |
| 25 Jun 2026 | 1 B/R Flat | Ready | 1 067 sqft | AED 1 550 000 | 1 453 |
| 4 Mar 2026 | 1 B/R Flat | Ready | 1 072 sqft | AED 2 066 998 | 1 929 |
| 26 Jan 2026 | Studio Flat | Ready | 465 sqft | AED 1 007 498 | 2 166 |
| 22 Jan 2026 | 1 B/R Flat | Ready | 930 sqft | AED 1 871 998 | 2 013 |
| 20 Jan 2026 | Studio Flat | Ready | 424 sqft | AED 620 000 | 1 463 |
| 24 Dec 2025 | Studio Flat | Ready | 454 sqft | AED 994 498 | 2 190 |
| 20 Nov 2025 | Studio Flat | Ready | 539 sqft | AED 1 039 998 | 1 928 |
| 18 Nov 2025 | 1 B/R Flat | Ready | 865 sqft | AED 1 326 000 | 1 532 |
Source: Registered DLD transactions · Data through 25 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Dusk By Binghatti: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Oct 2025 – Sep 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 6 | AED 1.28M | 1 765 | AED 7.84M |
| 2025 | 56 | AED 1.04M | 1 599 | AED 64.16M |
| 2024 | 62 | AED 1.20M | 1 447 | AED 103.86M |
| 2020 | 1 | — | — | AED 8.00M |
Source: Registered DLD transactions · Data through 25 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Sep 2025 | 11 | AED 1.25M | 1 980 | 1 406 – 2 072 |
| Aug 2025 | 7 | AED 1.28M | 2 038 | 1 717 – 2 128 |
| Jul 2025 | 3 | — | — | — |
| Jun 2025 | 5 | AED 994k | 2 162 | 2 003 – 2 178 |
| May 2025 | 3 | — | — | — |
| Apr 2025 | 10 | AED 725k | 1 464 | 1 442 – 1 550 |
| Mar 2025 | 8 | AED 800k | 1 600 | 1 423 – 1 629 |
| Feb 2025 | 1 | — | — | — |
| Jan 2025 | 2 | — | — | — |
| Dec 2024 | 24 | AED 841k | 1 496 | 1 357 – 1 744 |
| Nov 2024 | 24 | AED 1.26M | 1 511 | 1 409 – 1 688 |
| Oct 2024 | 13 | AED 1.19M | 1 258 | 1 255 – 1 267 |
Source: Registered DLD transactions · Data through 25 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 9 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Jumeirah Village Circle
Questions about Dusk By Binghatti
Who is the developer of Dusk By Binghatti?
The Dubai Land Department project registry lists Binghatti Developers Fze as the developer of Dusk By Binghatti.
Is Dusk By Binghatti completed?
The DLD registry status of Dusk By Binghatti is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 31 Dec 2024 — a registry date, not a handover promise.
How many homes are in Dusk By Binghatti?
The DLD registry records 107 units in Dusk By Binghatti.
What is the price per square foot in Dusk By Binghatti?
Over the last 12 complete months the median registered sale in Dusk By Binghatti was AED 1.04M, or AED 1 928 per sqft, from 9 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Dusk By Binghatti?
The escrow agent recorded by DLD for Dusk By Binghatti is Abu Dhabi Islamic Bank.
Where is Dusk By Binghatti?
Dusk By Binghatti is in the Jumeirah Village Circle community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 25 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 25 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗