DubaiData

Forest City Tower

Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily

Forest City Tower is a project by Al Helal Al Zahaby Real Estate Development L.L.C, recorded at 70% complete at its last Dubai Land Department inspection. 103 sales registered in the trailing 12 months at a median AED 1.25M (1 226 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 1.25M +36.0%
IQR AED 947k – AED 1.68M
DLD verified
Median price per sqft
AED 1 226/sqft +1.1%
IQR 1 165 – 1 315 AED/sqft
DLD verified
Registered sales
103 -20.2%
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 103 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperAl Helal Al Zahaby Real Estate Development L.L.C DLD verified
StatusActive DLD verified
Construction progress70% — at the last DLD inspection DLD verified
Registered with DLD27 Nov 2024 DLD verified
Construction started10 Oct 2024 DLD verified
Declared completion9 Apr 2027 — registry date, not a handover promise DLD verified
Units in the project253 DLD verified
Project area22 687 sqm DLD verified
Escrow agentEmirates Islamic Bank P.J.S.C. DLD verified
Project number3330 DLD verified

Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 0001 200Apr 2025Jun 2025Aug 2025Oct 2025Dec 2025Feb 2026Apr 2026Jun 2026Aug 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2026: in the 2 months since, no month reached the five registered sales a median needs (2 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 6 technical inspections for this project, from 24 Oct 2024 at 0.0% to 13 Aug 2026 at 70.1%. Over the inspections since 22 May 2025 it moved 3.86 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2027-04-092024-10-242026-08-13

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
13 Aug 202670.1% +14.1 pp
8 May 202656.0% +18.5 pp
3 Feb 202637.5% +16.6 pp
24 Oct 202520.9% +7.7 pp
22 May 202513.2% +13.2 pp
24 Oct 20240.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

The same figures as a table

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Jul 20267 AED 1.68M1 130 929 – 1 227
Jun 20260 —— —
May 20265 AED 1.75M1 199 1 189 – 1 243
Apr 20267 AED 965k1 293 1 186 – 1 340
Mar 20261 —— —
Feb 202611 AED 1.62M1 203 1 154 – 1 304
Jan 20266 AED 1.21M1 173 1 151 – 1 312
Dec 202518 AED 1.18M1 222 1 174 – 1 332
Nov 202525 AED 1.27M1 215 1 170 – 1 283
Oct 202520 AED 1.08M1 261 1 213 – 1 322
Sep 20255 AED 960k— —
Aug 20255 AED 946k1 264 1 264 – 1 265
Jul 202592 AED 926k1 212 1 172 – 1 253

Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios insufficient data 4— — — — —
1-bedroom apartments 41AED 945k 1 314 711 sqft — —
2-bedroom apartments 34AED 1.56M 1 206 1 365 sqft — —
3-bedroom apartments low sample (19) 19AED 2.10M 1 148 1 844 sqft — —
4-bedroom apartments insufficient data 2— — — — —
5-bedroom apartments insufficient data 2— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

0100200201620192023202420252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
202640AED 1.63M 1 201AED 60.55M
2025191AED 992k 1 220AED 217.68M
20241— —AED 1.07M
20231— —AED 18.30M
20191— —AED 15.00M
20161— —AED 20.40M

Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
28 Sep 20261 B/R Flat — FOREST CITY TOWEROff-plan 711 sqftAED 753 004 1 059
11 Sep 20261 B/R Flat — FOREST CITY TOWEROff-plan 713 sqftAED 944 550 1 325
12 Aug 20264 B/R Flat — FOREST CITY TOWEROff-plan 4 317 sqftAED 2 864 197 664
27 Jul 20261 B/R Flat — FOREST CITY TOWEROff-plan 709 sqftAED 659 166 929
20 Jul 20263 B/R Flat — FOREST CITY TOWEROff-plan 1 844 sqftAED 2 083 095 1 130
20 Jul 20262 B/R Flat — FOREST CITY TOWEROff-plan 1 369 sqftAED 1 680 852 1 227
20 Jul 20261 B/R Flat — FOREST CITY TOWEROff-plan 712 sqftAED 656 166 922
20 Jul 20261 B/R Flat — FOREST CITY TOWEROff-plan 708 sqftAED 911 691 1 287
16 Jul 20264 B/R Flat — FOREST CITY TOWEROff-plan 4 279 sqftAED 2 839 533 664
6 Jul 20265 B/R Flat — FOREST CITY TOWEROff-plan 3 611 sqftAED 2 396 308 664
14 May 20262 B/R Flat — FOREST CITY TOWEROff-plan 1 365 sqftAED 1 754 888 1 285
14 May 20263 B/R Flat — FOREST CITY TOWEROff-plan 1 844 sqftAED 2 191 888 1 189

Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Majan

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Forest City Tower — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/forest-city-tower/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Forest City Tower. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.