Data Dubai

Grand Polo - Montura 3

Grand Polo - Montura 3Active1% built219 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Grand Polo - Montura 3: ChatGPT · Claude · Perplexity

Grand Polo - Montura 3 is a project by Emaar Development P.J.S.C., recorded at 1% complete at its last Dubai Land Department inspection. 8 sales registered in the trailing 12 months at a median AED 7.26M. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 7.26M -0.2% y/y
≈ US$ 1.98M · typical range AED 6.96M – AED 7.29M
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
8 -96.3% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 8 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperEmaar Development P.J.S.C.
StatusActive
Construction progress1% — at the last DLD inspection
Registered with DLD23 Apr 2025
Construction started13 Mar 2025
Declared completion30 Jun 2029 — registry date, not a handover promise
Units in the project219
Project area106 037 sqm
Escrow agentEmirates Islamic Bank P.J.S.C.
Project number3703

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 3 technical inspections for this project, from 18 Apr 2025 at 0.0% to 21 Apr 2026 at 1.1%. Since 18 Apr 2025 the recorded percentage has moved 0.09 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2029-06-302025-04-182026-04-21

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
21 Apr 20261.1% +0.5 pp
4 Nov 20250.6% +0.6 pp
18 Apr 20250.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
4 Nov 2026LandReady 5 346 sqftAED 7 249 888 —
17 Sep 2026LandReady 4 994 sqftAED 6 600 000 —
11 Sep 2026LandReady 5 062 sqftAED 6 600 000 —
27 Jul 2026LandReady 4 650 sqftAED 7 077 888 —
25 Feb 2026LandReady 4 973 sqftAED 7 373 888 —
3 Feb 2026LandReady 4 718 sqftAED 7 264 888 —
10 Dec 2025LandReady 6 828 sqftAED 8 700 000 —
20 Nov 2025LandReady 4 709 sqftAED 7 259 888 —
11 Nov 2025LandReady 4 650 sqftAED 7 254 888 —

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Grand Polo - Montura 3: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

010020020252026010020020252026

registered sales per calendar year; the current year is incomplete

By month

012NovDecJanFebMarAprMayJunJulAugSepOct012DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20265AED 7.08M —AED 34.92M
2025218AED 7.27M —AED 1.67B

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 8 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects by Emaar Development P.J.S.C.

Questions about Grand Polo - Montura 3

Who is the developer of Grand Polo - Montura 3?

The Dubai Land Department project registry lists Emaar Development P.J.S.C. as the developer of Grand Polo - Montura 3.

Is Grand Polo - Montura 3 completed?

The DLD registry status of Grand Polo - Montura 3 is Active, 1% complete at the last DLD inspection. The declared completion date in the registry is 30 Jun 2029 — a registry date, not a handover promise.

How many homes are in Grand Polo - Montura 3?

The DLD registry records 219 units in Grand Polo - Montura 3.

What is the price per square foot in Grand Polo - Montura 3?

Too few sales were registered in Grand Polo - Montura 3 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Grand Polo - Montura 3?

The escrow agent recorded by DLD for Grand Polo - Montura 3 is Emirates Islamic Bank P.J.S.C..

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Grand Polo - Montura 3 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/grand-polo-montura-3/”. Reuse is permitted with attribution.