Greenridge
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Greenridge: ChatGPT · Claude · Perplexity
Greenridge is a project by Emaar Dubai South Dwc Llc, recorded at 36% complete at its last Dubai Land Department inspection. 10 sales registered in the trailing 12 months at a median AED 3.05M (1 623 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 10 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Emaar Dubai South Dwc Llc |
| Status | Active |
| Construction progress | 36% — at the last DLD inspection |
| Registered with DLD | 17 Sep 2024 |
| Construction started | 30 Jan 2025 |
| Declared completion | 31 Dec 2028 — registry date, not a handover promise |
| Units in the project | 520 |
| Project area | 127 197 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 3283 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Feb 2025: in the 20 months since, no month reached the five registered sales a median needs (16 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 9 Sep 2024 at 0.0% to 17 Jun 2026 at 35.6%. Over the inspections since 20 Mar 2025 it moved 2.34 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 17 Jun 2026 | 35.6% | +9.2 pp |
| 9 Feb 2026 | 26.4% | +20.8 pp |
| 29 Oct 2025 | 5.6% | +4.6 pp |
| 1 Jul 2025 | 1.0% | +0.3 pp |
| 20 Mar 2025 | 0.7% | +0.7 pp |
| 9 Sep 2024 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 3-bedroom apartments low sample (7) | 7 | AED 3.05M | 1 643 | 1 857 sqft | — | — |
| 4-bedroom apartments insufficient data | 3 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 12 Oct 2026 | 3 B/R Villa | Off-plan | 1 857 sqft | AED 3 050 888 | 1 643 |
| 28 Sep 2026 | 3 B/R Villa | Off-plan | 1 857 sqft | AED 3 050 888 | 1 643 |
| 25 Sep 2026 | 4 B/R Villa | Off-plan | 1 630 sqft | AED 1 800 004 | 1 104 |
| 8 Jun 2026 | 4 B/R Villa | Off-plan | 3 260 sqft | AED 3 585 888 | 1 100 |
| 19 May 2026 | 3 B/R Villa | Off-plan | 1 857 sqft | AED 3 034 950 | 1 635 |
| 7 May 2026 | 3 B/R Villa | Off-plan | 1 857 sqft | AED 3 174 888 | 1 710 |
| 25 Feb 2026 | 3 B/R Villa | Off-plan | 1 857 sqft | AED 3 050 888 | 1 643 |
| 28 Jan 2026 | 3 B/R Villa | Off-plan | 928 sqft | AED 1 494 935 | 1 611 |
| 17 Dec 2025 | 4 B/R Villa | Off-plan | 3 119 sqft | AED 3 650 000 | 1 170 |
| 21 Nov 2025 | 3 B/R Villa | Off-plan | 1 857 sqft | AED 2 989 870 | 1 610 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Greenridge: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Mar 2025 – Feb 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 8 | AED 3.05M | 1 639 | AED 22.24M |
| 2025 | 29 | AED 3.30M | 1 610 | AED 96.17M |
| 2024 | 496 | AED 3.34M | 1 311 | AED 1.65B |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Feb 2025 | 11 | AED 3.30M | 1 635 | 1 437 – 1 647 |
| Jan 2025 | 10 | AED 3.33M | 1 603 | 1 265 – 1 711 |
| Dec 2024 | 51 | AED 3.10M | 1 610 | 1 183 – 1 643 |
| Nov 2024 | 113 | AED 3.17M | 1 459 | 1 130 – 1 643 |
| Oct 2024 | 332 | AED 3.42M | 1 286 | 1 133 – 1 643 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 10 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai World Central
Questions about Greenridge
Who is the developer of Greenridge?
The Dubai Land Department project registry lists Emaar Dubai South Dwc Llc as the developer of Greenridge.
Is Greenridge completed?
The DLD registry status of Greenridge is Active, 36% complete at the last DLD inspection. The declared completion date in the registry is 31 Dec 2028 — a registry date, not a handover promise.
How many homes are in Greenridge?
The DLD registry records 520 units in Greenridge.
What is the price per square foot in Greenridge?
Over the last 12 complete months the median registered sale in Greenridge was AED 3.05M, or AED 1 623 per sqft, from 10 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Greenridge?
The escrow agent recorded by DLD for Greenridge is Mashreq Bank Psc.
Where is Greenridge?
Greenridge is in the Dubai World Central community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗