Data Dubai

Greenridge

GreenridgeActive36% built520 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Greenridge: ChatGPT · Claude · Perplexity

Greenridge is a project by Emaar Dubai South Dwc Llc, recorded at 36% complete at its last Dubai Land Department inspection. 10 sales registered in the trailing 12 months at a median AED 3.05M (1 623 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 3.05M -3.9% y/y
≈ US$ 831k · typical range AED 3.00M – AED 3.14M
DLD verified
Median price per sqft
AED 1 623/sqft +3.1% y/y
typical range 1 280 – 1 643 AED/sqft
DLD verified
Registered sales
10 -94.8% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 10 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperEmaar Dubai South Dwc Llc
StatusActive
Construction progress36% — at the last DLD inspection
Registered with DLD17 Sep 2024
Construction started30 Jan 2025
Declared completion31 Dec 2028 — registry date, not a handover promise
Units in the project520
Project area127 197 sqm
Escrow agentMashreq Bank Psc
Project number3283

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Feb 2025: in the 20 months since, no month reached the five registered sales a median needs (16 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 6 technical inspections for this project, from 9 Sep 2024 at 0.0% to 17 Jun 2026 at 35.6%. Over the inspections since 20 Mar 2025 it moved 2.34 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2028-12-312024-09-092026-06-17

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
17 Jun 202635.6% +9.2 pp
9 Feb 202626.4% +20.8 pp
29 Oct 20255.6% +4.6 pp
1 Jul 20251.0% +0.3 pp
20 Mar 20250.7% +0.7 pp
9 Sep 20240.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
3-bedroom apartments low sample (7) 7AED 3.05M 1 643 1 857 sqft — —
4-bedroom apartments insufficient data 3— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
12 Oct 20263 B/R VillaOff-plan 1 857 sqftAED 3 050 888 1 643
28 Sep 20263 B/R VillaOff-plan 1 857 sqftAED 3 050 888 1 643
25 Sep 20264 B/R VillaOff-plan 1 630 sqftAED 1 800 004 1 104
8 Jun 20264 B/R VillaOff-plan 3 260 sqftAED 3 585 888 1 100
19 May 20263 B/R VillaOff-plan 1 857 sqftAED 3 034 950 1 635
7 May 20263 B/R VillaOff-plan 1 857 sqftAED 3 174 888 1 710
25 Feb 20263 B/R VillaOff-plan 1 857 sqftAED 3 050 888 1 643
28 Jan 20263 B/R VillaOff-plan 928 sqftAED 1 494 935 1 611
17 Dec 20254 B/R VillaOff-plan 3 119 sqftAED 3 650 000 1 170
21 Nov 20253 B/R VillaOff-plan 1 857 sqftAED 2 989 870 1 610

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Greenridge: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

02004002024202520260200400202420252026

registered sales per calendar year; the current year is incomplete

By month

001MarAprMayJunJulAugSepOctNovDecJanFeb001AprJunAugOctDecFeb

registered sales per month, Mar 2025 – Feb 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20268AED 3.05M 1 639AED 22.24M
202529AED 3.30M 1 610AED 96.17M
2024496AED 3.34M 1 311AED 1.65B

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Feb 202511 AED 3.30M1 635 1 437 – 1 647
Jan 202510 AED 3.33M1 603 1 265 – 1 711
Dec 202451 AED 3.10M1 610 1 183 – 1 643
Nov 2024113 AED 3.17M1 459 1 130 – 1 643
Oct 2024332 AED 3.42M1 286 1 133 – 1 643

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 10 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Dubai World Central

Questions about Greenridge

Who is the developer of Greenridge?

The Dubai Land Department project registry lists Emaar Dubai South Dwc Llc as the developer of Greenridge.

Is Greenridge completed?

The DLD registry status of Greenridge is Active, 36% complete at the last DLD inspection. The declared completion date in the registry is 31 Dec 2028 — a registry date, not a handover promise.

How many homes are in Greenridge?

The DLD registry records 520 units in Greenridge.

What is the price per square foot in Greenridge?

Over the last 12 complete months the median registered sale in Greenridge was AED 3.05M, or AED 1 623 per sqft, from 10 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Greenridge?

The escrow agent recorded by DLD for Greenridge is Mashreq Bank Psc.

Where is Greenridge?

Greenridge is in the Dubai World Central community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Greenridge — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/greenridge/”. Reuse is permitted with attribution.