Data Dubai

Greenway

GreenwayActive39% built232 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Greenway: ChatGPT · Claude · Perplexity

Greenway is a project by Emaar Dubai South Dwc Llc, recorded at 39% complete at its last Dubai Land Department inspection. 6 sales registered in the trailing 12 months at a median AED 3.55M (1 303 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 3.55M
≈ US$ 966k · typical range AED 3.37M – AED 4.05M
DLD verified
Median price per sqft
AED 1 303/sqft
typical range 1 120 – 1 684 AED/sqft
DLD verified
Registered sales
6 +500.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 6 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperEmaar Dubai South Dwc Llc
StatusActive
Construction progress39% — at the last DLD inspection
Registered with DLD25 Apr 2024
Construction started4 Oct 2024
Units in the project232
Project area56 325 sqm
Escrow agentDubai Islamic Bank (Public Joint Stock Company)
Project number3032

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2024: in the 27 months since, no month reached the five registered sales a median needs (11 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 8 technical inspections for this project, from 1 Apr 2024 at 0.0% to 20 Jul 2026 at 39.1%. Over the inspections since 7 Mar 2025 it moved 2.36 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%2024-04-012026-07-20

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
20 Jul 202639.1% +6.8 pp
17 Mar 202632.2% +9.1 pp
12 Dec 202523.2% +8.4 pp
19 Sep 202514.8% +7.8 pp
25 Jun 20257.0% +6.8 pp
7 Mar 20250.2% +0.2 pp
4 Nov 20240.0% +0.0 pp
1 Apr 20240.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
3-bedroom apartments insufficient data 2— — — — —
4-bedroom apartments insufficient data 4— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
2 Jul 20264 B/R VillaOff-plan 5 487 sqftAED 4 170 888 760
29 Jun 20264 B/R VillaOff-plan 2 967 sqftAED 3 150 000 1 062
15 Apr 20264 B/R VillaOff-plan 3 221 sqftAED 4 223 888 1 311
12 Feb 20263 B/R VillaOff-plan 1 860 sqftAED 3 406 888 1 831
12 Feb 20264 B/R VillaOff-plan 2 848 sqftAED 3 685 888 1 294
14 Nov 20253 B/R VillaOff-plan 1 857 sqftAED 3 355 888 1 808

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Greenway: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

01002002024202520260100200202420252026

registered sales per calendar year; the current year is incomplete

By month

0123AugSepOctNovDecJanFebMarAprMayJunJul0123SepNovJanMarMayJul

registered sales per month, Aug 2024 – Jul 2025

YearSalesMedian priceMedian AED/sqftTotal registered value
20265AED 3.69M 1 294AED 18.64M
20252— —AED 6.86M
2024232AED 3.60M 1 525AED 846.96M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Jul 2024115 AED 3.44M1 736 1 302 – 1 796
Jun 2024113 AED 3.83M1 329 1 239 – 1 709

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 6 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Dubai World Central

Questions about Greenway

Who is the developer of Greenway?

The Dubai Land Department project registry lists Emaar Dubai South Dwc Llc as the developer of Greenway.

Is Greenway completed?

The DLD registry status of Greenway is Active, 39% complete at the last DLD inspection.

How many homes are in Greenway?

The DLD registry records 232 units in Greenway.

What is the price per square foot in Greenway?

Over the last 12 complete months the median registered sale in Greenway was AED 3.55M, or AED 1 303 per sqft, from 6 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Greenway?

The escrow agent recorded by DLD for Greenway is Dubai Islamic Bank (Public Joint Stock Company).

Where is Greenway?

Greenway is in the Dubai World Central community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Greenway — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/greenway/”. Reuse is permitted with attribution.