Harbour Gate
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Harbour Gate is a project by The Lagoons Phase One L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 51 sales registered in the trailing 12 months at a median AED 2.55M (2 219 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 51 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | The Lagoons Phase One L.L.C | DLD verified |
| Status | Finished | DLD verified |
| Construction progress | 100% — at the last DLD inspection | DLD verified |
| Registered with DLD | 31 Oct 2016 | DLD verified |
| Construction started | 2 Feb 2017 | DLD verified |
| Declared completion | 30 Aug 2022 — registry date, not a handover promise | DLD verified |
| Units in the project | 517 | DLD verified |
| Project area | 57 880 sqm | DLD verified |
| Escrow agent | First Abu Dhabi Bank P.J.S.C. | DLD verified |
| Project number | 1818 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2026: in the 1 months since, there were no registered sales at all, so no month reached the five registered sales a median needs · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 17 technical inspections for this project, from 30 Jul 2017 at 5.3% to 22 Jun 2022 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 22 Jun 2022 | 100.0% | +2.2 pp |
| 25 Apr 2022 | 97.8% | +1.7 pp |
| 6 Jan 2022 | 96.2% | +2.1 pp |
| 2 Sep 2021 | 94.0% | +5.4 pp |
| 9 May 2021 | 88.6% | +3.5 pp |
| 26 Jan 2021 | 85.1% | +5.1 pp |
| 8 Oct 2020 | 80.0% | +7.8 pp |
| 4 Jun 2020 | 72.2% | +10.7 pp |
| 28 Jan 2020 | 61.5% | +10.4 pp |
| 29 Oct 2019 | 51.1% | +15.4 pp |
| 17 Jul 2019 | 35.8% | +12.1 pp |
| 24 Mar 2019 | 23.7% | +5.3 pp |
| 20 Nov 2018 | 18.4% | +5.1 pp |
| 14 Aug 2018 | 13.3% | +3.9 pp |
| 2 May 2018 | 9.4% | +1.5 pp |
| 15 Jan 2018 | 7.8% | +2.6 pp |
| 30 Jul 2017 | 5.3% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Aug 2026 | 5 | AED 2.42M | 2 135 | 2 091 – 2 220 |
| Jul 2026 | 6 | AED 2.33M | 2 090 | 1 995 – 2 190 |
| Jun 2026 | 2 | — | — | — |
| May 2026 | 0 | — | — | — |
| Apr 2026 | 3 | — | — | — |
| Mar 2026 | 6 | AED 2.65M | 2 380 | 2 227 – 2 401 |
| Feb 2026 | 9 | AED 2.50M | 2 215 | 2 153 – 2 311 |
| Jan 2026 | 1 | — | — | — |
| Dec 2025 | 4 | — | — | — |
| Nov 2025 | 5 | AED 3.23M | 2 215 | 2 080 – 2 220 |
| Oct 2025 | 10 | AED 2.40M | 2 182 | 2 097 – 2 255 |
| Sep 2025 | 6 | AED 2.80M | 2 245 | 2 181 – 2 337 |
| Aug 2025 | 3 | — | — | — |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (13) | 13 | AED 1.55M | 2 249 | 684 sqft | — | — |
| 2-bedroom apartments | 25 | AED 2.55M | 2 220 | 1 148 sqft | — | — |
| 3-bedroom apartments low sample (13) | 13 | AED 3.53M | 2 153 | 1 639 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 32 | AED 2.55M | 2 220 | AED 78.27M |
| 2025 | 63 | AED 2.49M | 2 219 | AED 158.31M |
| 2024 | 58 | AED 2.43M | 2 108 | AED 148.85M |
| 2023 | 123 | AED 2.30M | 1 891 | AED 296.18M |
| 2022 | 134 | AED 2.38M | 1 890 | AED 328.47M |
| 2021 | 84 | AED 2.69M | 1 639 | AED 212.77M |
| 2020 | 23 | AED 1.50M | 1 335 | AED 32.59M |
| 2019 | 35 | AED 1.45M | 1 433 | AED 52.20M |
| 2018 | 77 | AED 1.42M | 1 412 | AED 108.41M |
| 2017 | 182 | AED 1.45M | 1 410 | AED 262.48M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 31 Aug 2026 | 2 B/R Flat — Harbour Gate | Ready | 1 149 sqft | AED 2 660 000 | 2 316 |
| 31 Aug 2026 | 2 B/R Flat — Harbour Gate | Ready | 1 203 sqft | AED 2 420 000 | 2 012 |
| 27 Aug 2026 | 1 B/R Flat — Harbour Gate | Ready | 684 sqft | AED 1 430 000 | 2 091 |
| 27 Aug 2026 | 2 B/R Flat — Harbour Gate | Ready | 1 082 sqft | AED 2 310 000 | 2 135 |
| 27 Aug 2026 | 2 B/R Flat — Harbour Gate | Ready | 1 149 sqft | AED 2 550 000 | 2 220 |
| 31 Jul 2026 | 2 B/R Flat — Harbour Gate | Ready | 1 148 sqft | AED 2 550 000 | 2 221 |
| 22 Jul 2026 | 1 B/R Flat — Harbour Gate | Ready | 686 sqft | AED 1 350 000 | 1 968 |
| 14 Jul 2026 | 3 B/R Flat — Harbour Gate | Ready | 1 639 sqft | AED 3 400 000 | 2 075 |
| 8 Jul 2026 | 1 B/R Flat — Harbour Gate | Ready | 680 sqft | AED 1 510 000 | 2 219 |
| 7 Jul 2026 | 2 B/R Flat — Harbour Gate | Ready | 1 381 sqft | AED 2 250 000 | 1 629 |
| 2 Jul 2026 | 2 B/R Flat — Harbour Gate | Ready | 1 140 sqft | AED 2 400 000 | 2 105 |
| 18 Jun 2026 | 2 B/R Flat — Harbour Gate | Ready | 1 148 sqft | AED 2 600 000 | 2 264 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai Creek Harbour
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Harbour Gate — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/harbour-gate/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Harbour Gate. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.