Me Do Re 2 is a project by Me Do Re Developments Dmcc, recorded at 98% complete at its last Dubai Land Department inspection. 10 sales registered in the trailing 12 months at a median AED 2.74M (2 487 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 10 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Me Do Re Developments Dmcc |
| Status | Active |
| Construction progress | 98% — at the last DLD inspection |
| Registered with DLD | 25 Jun 2024 |
| Construction started | 11 Oct 2020 |
| Declared completion | 31 Dec 2025 — registry date, not a handover promise |
| Units in the project | 407 |
| Project area | 39 923 sqm |
| Escrow agent | Commercial Bank Of Dubai(Psc) |
| Project number | 3056 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2025: in the 15 months since, no month reached the five registered sales a median needs (17 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 3 technical inspections for this project, from 1 May 2024 at 80.5% to 9 Mar 2026 at 97.8%. Over the inspections since 20 May 2025 it moved 0.24 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 9 Mar 2026 | 97.8% | +2.3 pp |
| 20 May 2025 | 95.5% | +14.9 pp |
| 1 May 2024 | 80.5% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
The DLD unit register lists 396 homes in Me Do Re 2, and 330 off-plan sale registrations have been recorded since August 2024, as of 23 Nov 2026. After 2.2 years of sales, resales make up a growing part of those registrations, so we do not turn them into an unsold count.
| Homes | In unit register | Registered sales |
|---|---|---|
| Studios | 68 | 61 |
| 1 bedroom | 204 | 162 |
| 2 bedrooms | 103 | 89 |
| 3 bedrooms | 19 | 18 |
| 4+ bedrooms | 2 | 0 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios insufficient data | 3 | — | — | — | — | — |
| 1-bedroom apartments insufficient data | 3 | — | — | — | — | — |
| 2-bedroom apartments insufficient data | 3 | — | — | — | — | — |
| 3-bedroom apartments insufficient data | 1 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 24 Sep 2026 | 3 B/R Flat | Off-plan | 2 010 sqft | AED 4 626 000 | 2 302 |
| 3 Sep 2026 | Studio Flat | Off-plan | 427 sqft | AED 1 260 000 | 2 949 |
| 8 Jul 2026 | 2 B/R Flat | Off-plan | 1 311 sqft | AED 2 812 000 | 2 146 |
| 29 Jun 2026 | Studio Flat | Off-plan | 427 sqft | AED 1 060 000 | 2 480 |
| 19 Mar 2026 | Studio Flat | Off-plan | 427 sqft | AED 1 245 000 | 2 913 |
| 16 Mar 2026 | 1 B/R Flat | Off-plan | 1 230 sqft | AED 2 772 000 | 2 254 |
| 30 Jan 2026 | 2 B/R Flat | Off-plan | 1 217 sqft | AED 3 000 000 | 2 465 |
| 21 Nov 2025 | 1 B/R Flat | Off-plan | 1 241 sqft | AED 3 176 000 | 2 558 |
| 13 Nov 2025 | 1 B/R Flat | Off-plan | 991 sqft | AED 2 700 000 | 2 725 |
| 6 Nov 2025 | 2 B/R Flat | Off-plan | 1 000 sqft | AED 2 495 000 | 2 494 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Me Do Re 2: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Aug 2025 – Jul 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 7 | AED 2.77M | 2 465 | AED 16.77M |
| 2025 | 156 | AED 2.43M | 2 229 | AED 407.27M |
| 2024 | 167 | AED 2.02M | 2 186 | AED 324.86M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jul 2025 | 21 | AED 2.19M | 2 194 | 2 128 – 2 233 |
| Jun 2025 | 15 | AED 2.64M | 2 337 | 2 243 – 2 471 |
| May 2025 | 26 | AED 2.46M | 2 241 | 2 170 – 2 339 |
| Apr 2025 | 24 | AED 2.61M | 2 286 | 2 198 – 2 353 |
| Mar 2025 | 17 | AED 2.41M | 2 252 | 2 093 – 2 287 |
| Feb 2025 | 16 | AED 2.64M | 2 273 | 2 051 – 2 345 |
| Jan 2025 | 27 | AED 2.26M | 2 094 | 2 060 – 2 163 |
| Dec 2024 | 26 | AED 2.22M | 2 129 | 2 079 – 2 314 |
| Nov 2024 | 52 | AED 2.06M | 2 087 | 1 979 – 2 247 |
| Oct 2024 | 43 | AED 1.62M | 2 205 | 2 102 – 2 294 |
| Sep 2024 | 43 | AED 1.13M | 2 246 | 2 174 – 2 437 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 10 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in DMCC Master Community
Questions about Me Do Re 2
Who is the developer of Me Do Re 2?
The Dubai Land Department project registry lists Me Do Re Developments Dmcc as the developer of Me Do Re 2.
Is Me Do Re 2 completed?
The DLD registry status of Me Do Re 2 is Active, 98% complete at the last DLD inspection. The declared completion date in the registry is 31 Dec 2025 — a registry date, not a handover promise.
How many homes are in Me Do Re 2?
The DLD registry records 407 units in Me Do Re 2. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in Me Do Re 2?
Over the last 12 complete months the median registered sale in Me Do Re 2 was AED 2.74M, or AED 2 487 per sqft, from 10 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Me Do Re 2?
The escrow agent recorded by DLD for Me Do Re 2 is Commercial Bank Of Dubai(Psc).
Where is Me Do Re 2?
Me Do Re 2 is in the DMCC Master Community community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗