DubaiData

Seven City Jlt

Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily

Seven City Jlt is a project by Seven Tides Real Estate Development L.L.C, recorded at 28% complete at its last Dubai Land Department inspection. 114 sales registered in the trailing 12 months at a median AED 620k (1 258 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 620k -10.1%
IQR AED 532k – AED 896k
DLD verified
Median price per sqft
AED 1 258/sqft -16.4%
IQR 1 168 – 1 369 AED/sqft
DLD verified
Registered sales
114 -51.3%
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 114 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperSeven Tides Real Estate Development L.L.C DLD verified
StatusActive DLD verified
Construction progress28% — at the last DLD inspection DLD verified
Registered with DLD24 May 2018 DLD verified
Construction started1 Jul 2018 DLD verified
Declared completion24 Nov 2025 — registry date, not a handover promise DLD verified
Units in the project2 666 DLD verified
Project area165 767 sqm DLD verified
Escrow agentDubai Islamic Bank (Public Joint Stock Company) DLD verified
Project number2065 DLD verified

Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 0001 5002 000Oct 2021May 2022Dec 2022Jul 2023Feb 2024Sep 2024Apr 2025Nov 2025Jun 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2026: in the 1 months since, no month reached the five registered sales a median needs (4 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 12 technical inspections for this project, from 19 Feb 2019 at 7.5% to 8 May 2024 at 28.4%. Over the inspections since 1 Mar 2023 it moved 0.92 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2025-11-242019-02-192024-05-08

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
8 May 202428.4% +2.4 pp
7 Nov 202326.0% +4.8 pp
10 Jul 202321.2% +5.9 pp
1 Mar 202315.3% +2.4 pp
13 Jun 202212.9% +0.4 pp
12 Oct 202112.5% +1.2 pp
6 Jun 202111.4% +3.1 pp
19 Oct 20208.3% +0.2 pp
2 Apr 20208.1% +0.0 pp
7 Nov 20198.1% +0.1 pp
3 Jul 20198.0% +0.5 pp
19 Feb 20197.5% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

The same figures as a table

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Aug 20264 —1 144 1 124 – 1 420
Jul 20268 AED 835k1 131 1 100 – 1 198
Jun 20265 AED 505k1 228 1 204 – 1 240
May 20267 AED 750k1 173 994 – 1 296
Apr 20265 AED 510k1 259 1 186 – 1 392
Mar 20268 AED 819k1 145 1 033 – 1 227
Feb 202611 AED 600k1 319 1 304 – 1 338
Jan 20267 AED 560k1 319 1 287 – 1 325
Dec 202513 AED 760k1 168 1 168 – 1 330
Nov 202515 AED 616k1 371 1 293 – 1 485
Oct 202512 AED 628k1 393 1 248 – 1 531
Sep 20257 AED 1.18M1 391 1 121 – 2 007
Aug 20254 —1 348 1 171 – 1 433

Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios 77AED 550k 1 308 415 sqft — —
1-bedroom apartments 20AED 862k 1 089 775 sqft — —
2-bedroom apartments insufficient data 2— — — — —
3-bedroom apartments low sample (15) 15AED 1.92M 1 263 1 517 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

05001 00020192020202120222023202420252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
202664AED 590k 1 227AED 49.43M
2025189AED 690k 1 471AED 156.16M
2024416AED 650k 1 421AED 349.21M
2023589AED 580k 1 204AED 476.87M
2022227AED 780k 1 032AED 212.65M
20211 341AED 439k 1 011AED 810.16M
2020270AED 394k 963AED 118.75M
2019480AED 391k 943AED 210.76M

Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
28 Sep 2026Studio Flat — SEVEN CITY JLTOff-plan 385 sqftAED 480 000 1 245
17 Sep 2026Studio Flat — SEVEN CITY JLTOff-plan 387 sqftAED 440 000 1 136
16 Sep 20261 B/R Flat — SEVEN CITY JLTOff-plan 775 sqftAED 800 000 1 033
1 Sep 2026Studio Flat — SEVEN CITY JLTOff-plan 415 sqftAED 485 000 1 168
26 Aug 2026Studio Flat — SEVEN CITY JLTOff-plan 415 sqftAED 475 000 1 144
25 Aug 2026Studio Flat — SEVEN CITY JLTOff-plan 415 sqftAED 590 000 1 420
24 Aug 2026Studio Flat — SEVEN CITY JLTOff-plan 401 sqftAED 600 000 1 496
17 Aug 20261 B/R Flat — SEVEN CITY JLTOff-plan 801 sqftAED 900 000 1 124
3 Aug 2026Studio Flat — SEVEN CITY JLTOff-plan 415 sqftAED 435 618 1 049
31 Jul 20261 B/R Flat — SEVEN CITY JLTOff-plan 775 sqftAED 875 000 1 129
30 Jul 20263 B/R Flat — SEVEN CITY JLTOff-plan 1 516 sqftAED 1 576 798 1 040
21 Jul 2026Studio Flat — SEVEN CITY JLTOff-plan 415 sqftAED 470 000 1 132

Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in DMCC Master Community

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Seven City Jlt — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/seven-city-jlt/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Seven City Jlt. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.