Data Dubai

Mudon-Phase 2

Mudon-Phase 2Finished100% built405 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Mudon-Phase 2: ChatGPT · Claude · Perplexity

Mudon-Phase 2 is a project by Mdn Real Estate L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 22 sales registered in the trailing 12 months at a median AED 5.35M. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 5.35M -13.4% y/y
≈ US$ 1.46M · typical range AED 4.95M – AED 6.40M
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
22 +0.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 22 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperMdn Real Estate L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD21 May 2014
Construction started31 May 2014
Declared completion15 Nov 2015 — registry date, not a handover promise
Units in the project405
Project area400 417 sqm
Escrow agentMashreq Bank Psc
Project number1521

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 6 technical inspections for this project, from 5 Feb 2015 at 20.4% to 5 Dec 2016 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2015-11-152015-02-052016-12-05

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
5 Dec 2016100.0% +9.5 pp
29 Aug 201690.5% +12.6 pp
28 Apr 201678.0% +19.0 pp
16 Dec 201558.9% +14.5 pp
20 Aug 201544.5% +24.1 pp
5 Feb 201520.4% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
10 Nov 2026VillaReady 4 216 sqftAED 4 999 999 —
13 Oct 2026VillaReady 4 198 sqftAED 4 800 000 —
6 Oct 2026VillaReady 4 198 sqftAED 4 800 000 —
2 Sep 2026VillaReady 3 330 sqftAED 4 999 999 —
26 Aug 2026VillaReady 5 889 sqftAED 5 975 000 —
25 Aug 2026VillaReady 3 358 sqftAED 4 975 000 —
6 Jul 2026VillaReady 5 920 sqftAED 6 350 000 —
19 Jun 2026VillaReady 6 712 sqftAED 4 970 000 —
3 Jun 2026VillaReady 4 198 sqftAED 4 700 000 —
1 May 2026VillaReady 7 732 sqftAED 5 600 000 —
28 Apr 2026VillaReady 9 272 sqftAED 8 400 000 —
20 Apr 2026VillaReady 7 255 sqftAED 6 400 000 —
20 Apr 2026VillaReady 6 609 sqftAED 7 326 906 —
31 Mar 2026VillaReady 3 330 sqftAED 4 950 000 —
24 Mar 2026VillaReady 3 330 sqftAED 4 650 000 —
2 Mar 2026VillaReady 5 640 sqftAED 5 800 000 —
16 Jan 2026VillaReady 6 232 sqftAED 6 400 000 —
9 Jan 2026VillaReady 4 198 sqftAED 4 900 000 —
30 Dec 2025VillaReady 7 451 sqftAED 7 100 000 —
30 Dec 2025VillaReady 4 198 sqftAED 4 960 000 —
9 Dec 2025VillaReady 6 702 sqftAED 6 500 000 —
28 Nov 2025VillaReady 4 112 sqftAED 5 100 000 —
14 Nov 2025VillaReady 8 788 sqftAED 9 500 000 —

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Mudon-Phase 2: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

050100201520162017201820192020202120222023202420252026050100201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

0123NovDecJanFebMarAprMayJunJulAugSepOct0123DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202617AED 5.00M —AED 96.00M
202524AED 6.66M —AED 159.41M
202426AED 4.66M —AED 134.84M
202334AED 4.19M —AED 146.58M
202239AED 3.50M —AED 150.62M
202122AED 3.74M —AED 81.91M
202017AED 3.05M —AED 53.16M
201910AED 2.61M —AED 29.15M
20189AED 2.82M —AED 28.63M
201734AED 3.45M —AED 122.26M
2016121AED 4.40M —AED 506.54M
2015135AED 3.57M —AED 489.65M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent by year, 2017–2026

200k300k2017201820192020202120222023202420252026200k300k2017202020232026

4-bed villa: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
Year3-bed villa4-bed villa5-bed villa
2026 YTD 298k300k—
2025 281k250k276k
2024 260k229k—
2023 257k194k235k
2022 160k160k211k
2021 155k145k188k
2020 155k138k175k
2019 165k160k180k
2018 170k169k200k
2017 185k175k175k

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Mudon-Phase 2. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Mudon
Finished · Dubai Land Residences (L.L.C)
262 m100%400
Mudon Views - Tower 5
Cancelled · Mdn Real Estate L.L.C
590 m0%1
Mudon Phase 3 _ Neighbourhood I- Arabella
Finished · Mdn Real Estate L.L.C
631 m100%668
Mudon Views
Finished · Mdn Real Estate L.L.C
632 m100%181
Arabian Ranches- Azalea Community
Finished · Emaar Development P.J.S.C.
702 m100%108
Damac Hills - Richmond
Finished · Damac Crescent Properties
920 m100%118
Damac Hills - Topanga
Finished · Damac Crescent Properties
954 m100%142
The Sustainable City
Finished · The Sustainable City Limited
986 m100%319
Ar Ii - Reem Community
Finished · Emaar Development P.J.S.C.
1,041 m100%131
Arabian Ranches - Samara Community
Finished · Emaar Development P.J.S.C.
1,053 m100%177

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Mudon

Questions about Mudon-Phase 2

Who is the developer of Mudon-Phase 2?

The Dubai Land Department project registry lists Mdn Real Estate L.L.C as the developer of Mudon-Phase 2.

Is Mudon-Phase 2 completed?

The DLD registry status of Mudon-Phase 2 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 15 Nov 2015 — a registry date, not a handover promise.

How many homes are in Mudon-Phase 2?

The DLD registry records 405 units in Mudon-Phase 2.

What is the price per square foot in Mudon-Phase 2?

Too few sales were registered in Mudon-Phase 2 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Mudon-Phase 2?

The escrow agent recorded by DLD for Mudon-Phase 2 is Mashreq Bank Psc.

Where is Mudon-Phase 2?

Mudon-Phase 2 is in the Mudon community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Mudon, about 262 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Mudon-Phase 2 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/mudon-phase-2/”. Reuse is permitted with attribution.