Data Dubai

Mudon

MudonFinished100% built400 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Mudon: ChatGPT · Claude · Perplexity

Mudon is a project by Dubai Land Residences (L.L.C), recorded at 100% complete at its last Dubai Land Department inspection. 16 sales registered in the trailing 12 months at a median AED 4.99M. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 4.99M +0.8% y/y
≈ US$ 1.36M · typical range AED 4.90M – AED 5.01M
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
16 -46.7% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 16 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperDubai Land Residences (L.L.C)
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD18 Feb 2013
Construction started1 Apr 2013
Declared completion14 Oct 2015 — registry date, not a handover promise
Units in the project400
Project area155 351 sqm
Escrow agentMashreq Bank Psc
Project number1337

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 4 technical inspections for this project, from 27 Feb 2014 at 43.0% to 15 Feb 2016 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2015-10-142014-02-272016-02-15

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
15 Feb 2016100.0% +1.8 pp
15 Sep 201598.2% +13.7 pp
23 Sep 201484.5% +41.5 pp
27 Feb 201443.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
12 Nov 2026VillaReady 3 538 sqftAED 4 900 000 —
11 Nov 2026VillaReady 4 167 sqftAED 4 950 000 —
2 Sep 2026VillaReady 7 159 sqftAED 7 900 000 —
31 Aug 2026VillaReady 3 330 sqftAED 4 900 000 —
25 Aug 2026VillaReady 3 354 sqftAED 4 999 000 —
20 Aug 2026VillaReady 3 888 sqftAED 4 700 000 —
20 Aug 2026VillaReady 3 331 sqftAED 4 900 000 —
31 Jul 2026VillaReady 4 184 sqftAED 4 900 000 —
22 Jul 2026VillaReady 4 098 sqftAED 3 553 776 —
17 Jul 2026VillaReady 5 301 sqftAED 4 985 000 —
5 May 2026VillaReady 3 204 sqftAED 5 100 000 —
13 Apr 2026VillaReady 3 330 sqftAED 5 000 000 —
8 Apr 2026VillaReady 4 184 sqftAED 4 950 000 —
9 Mar 2026VillaReady 3 330 sqftAED 4 900 000 —
16 Jan 2026VillaReady 3 331 sqftAED 5 050 000 —
15 Jan 2026VillaReady 4 626 sqftAED 5 500 000 —
6 Jan 2026VillaReady 3 330 sqftAED 4 990 000 —
5 Jan 2026VillaReady 3 330 sqftAED 4 999 950 —

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Mudon: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

01002002015201620172018201920202021202220232024202520260100200201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

024NovDecJanFebMarAprMayJunJulAugSepOct024DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202616AED 4.99M —AED 81.33M
202526AED 4.97M —AED 131.40M
202429AED 4.45M —AED 128.14M
202329AED 3.70M —AED 107.78M
202229AED 3.20M —AED 95.59M
202136AED 2.88M —AED 102.05M
202021AED 2.38M —AED 49.48M
20198AED 2.48M —AED 20.35M
201818AED 2.52M —AED 46.26M
201720AED 3.04M —AED 60.90M
201637AED 3.30M —AED 122.97M
2015268AED 3.00M —AED 816.14M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent by year, 2015–2026

150k200k250k201520162017201820192020202120222023202420252026150k200k250k201520192023

4-bed villa: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
Year4-bed villa
2026 YTD 236k
2025 235k
2024 218k
2023 175k
2022 150k
2021 140k
2020 135k
2019 150k
2018 157k
2017 172k
2016 185k
2015 180k

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 16 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Mudon. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Mudon-Phase 2
Finished · Mdn Real Estate L.L.C
262 m100%405
Arabian Ranches- Azalea Community
Finished · Emaar Development P.J.S.C.
447 m100%108
Mudon Views
Finished · Mdn Real Estate L.L.C
689 m100%181
Mudon Views - Tower 5
Cancelled · Mdn Real Estate L.L.C
694 m0%1
Ar Ii - Reem Community
Finished · Emaar Development P.J.S.C.
799 m100%131
The Sustainable City
Finished · The Sustainable City Limited
800 m100%319
Arabian Ranches - Samara Community
Finished · Emaar Development P.J.S.C.
822 m100%177
Arabian Ranches - Yasmin Community
Finished · Emaar Properties (P.J.S.C)
838 m100%99
Mudon Phase 3 _ Neighbourhood I- Arabella
Finished · Mdn Real Estate L.L.C
892 m100%668
Damac Hills - Topanga
Finished · Damac Crescent Properties
974 m100%142

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Mudon

Questions about Mudon

Who is the developer of Mudon?

The Dubai Land Department project registry lists Dubai Land Residences (L.L.C) as the developer of Mudon.

Is Mudon completed?

The DLD registry status of Mudon is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 14 Oct 2015 — a registry date, not a handover promise.

How many homes are in Mudon?

The DLD registry records 400 units in Mudon.

What is the price per square foot in Mudon?

Too few sales were registered in Mudon in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Mudon?

The escrow agent recorded by DLD for Mudon is Mashreq Bank Psc.

Where is Mudon?

Mudon is in the Mudon community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Mudon-Phase 2, about 262 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Mudon — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/mudon/”. Reuse is permitted with attribution.