Parkside 2
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Parkside 2: ChatGPT · Claude · Perplexity
Parkside 2 is a project by Emaar Dubai South Dwc Llc, recorded at 100% complete at its last Dubai Land Department inspection. 30 sales registered in the trailing 12 months at a median AED 2.44M (1 421 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 30 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Emaar Dubai South Dwc Llc |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 17 Jan 2019 |
| Construction started | 1 Jun 2019 |
| Declared completion | 30 Jun 2023 — registry date, not a handover promise |
| Units in the project | 422 |
| Project area | 78 785 sqm |
| Escrow agent | Dubai Islamic Bank (Public Joint Stock Company) |
| Project number | 2130 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Mar 2026: in the 7 months since, no month reached the five registered sales a median needs (12 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 12 technical inspections for this project, from 25 Aug 2019 at 0.2% to 30 May 2023 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 30 May 2023 | 100.0% | +5.0 pp |
| 13 Apr 2023 | 95.0% | +4.8 pp |
| 19 Dec 2022 | 90.2% | +10.1 pp |
| 30 Aug 2022 | 80.1% | +15.3 pp |
| 26 Apr 2022 | 64.8% | +14.6 pp |
| 29 Nov 2021 | 50.1% | +9.8 pp |
| 8 Aug 2021 | 40.4% | +15.2 pp |
| 18 Apr 2021 | 25.2% | +10.5 pp |
| 21 Dec 2020 | 14.7% | +3.4 pp |
| 5 Oct 2020 | 11.2% | +5.0 pp |
| 4 Feb 2020 | 6.3% | +6.1 pp |
| 25 Aug 2019 | 0.2% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 3-bedroom apartments | 20 | AED 2.30M | 1 517 | 1 483 sqft | — | — |
| 4-bedroom apartments low sample (10) | 10 | AED 3.09M | 982 | 3 146 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 23 Nov 2026 | 4 B/R Villa | Ready | 2 606 sqft | AED 3 000 000 | 1 151 |
| 10 Nov 2026 | 3 B/R Villa | Ready | 1 483 sqft | AED 2 170 000 | 1 463 |
| 9 Nov 2026 | 4 B/R Villa | Ready | 2 486 sqft | AED 2 900 000 | 1 167 |
| 28 Oct 2026 | 3 B/R Villa | Ready | 1 483 sqft | AED 2 500 000 | 1 686 |
| 27 Oct 2026 | 3 B/R Villa | Ready | 1 483 sqft | AED 2 250 000 | 1 517 |
| 16 Oct 2026 | 3 B/R Villa | Ready | 1 490 sqft | AED 2 075 000 | 1 393 |
| 30 Sep 2026 | 3 B/R Villa | Ready | 1 483 sqft | AED 2 135 000 | 1 440 |
| 21 Sep 2026 | 3 B/R Villa | Ready | 1 483 sqft | AED 2 250 000 | 1 517 |
| 15 Sep 2026 | 3 B/R Villa | Ready | 2 004 sqft | AED 2 630 000 | 1 313 |
| 27 Aug 2026 | 3 B/R Villa | Ready | 1 483 sqft | AED 2 150 000 | 1 450 |
| 27 Aug 2026 | 4 B/R Villa | Ready | 3 584 sqft | AED 2 920 000 | 815 |
| 3 Aug 2026 | 4 B/R Villa | Ready | 4 436 sqft | AED 3 425 000 | 772 |
| 29 Jul 2026 | 3 B/R Villa | Ready | 1 516 sqft | AED 2 150 000 | 1 418 |
| 5 May 2026 | 3 B/R Villa | Ready | 1 475 sqft | AED 2 050 000 | 1 389 |
| 10 Apr 2026 | 3 B/R Villa | Ready | 1 483 sqft | AED 2 525 000 | 1 703 |
| 24 Mar 2026 | 4 B/R Villa | Ready | 3 201 sqft | AED 3 000 000 | 937 |
| 12 Mar 2026 | 4 B/R Villa | Ready | 2 487 sqft | AED 3 000 000 | 1 206 |
| 12 Mar 2026 | 4 B/R Villa | Ready | 2 893 sqft | AED 3 185 000 | 1 101 |
| 11 Mar 2026 | 4 B/R Villa | Ready | 2 486 sqft | AED 2 860 000 | 1 150 |
| 2 Mar 2026 | 4 B/R Villa | Ready | 3 765 sqft | AED 3 300 000 | 877 |
| 23 Feb 2026 | 3 B/R Villa | Ready | 1 483 sqft | AED 2 490 000 | 1 679 |
| 23 Feb 2026 | 4 B/R Villa | Ready | 3 091 sqft | AED 3 125 000 | 1 011 |
| 17 Feb 2026 | 3 B/R Villa | Ready | 1 506 sqft | AED 2 500 000 | 1 660 |
| 4 Feb 2026 | 3 B/R Villa | Ready | 1 483 sqft | AED 2 400 000 | 1 619 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Parkside 2: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 24 | AED 2.50M | 1 405 | AED 62.62M |
| 2025 | 48 | AED 2.23M | 1 399 | AED 115.66M |
| 2024 | 113 | AED 2.00M | 1 035 | AED 226.78M |
| 2023 | 78 | AED 1.56M | 971 | AED 128.11M |
| 2022 | 40 | AED 1.36M | 722 | AED 53.47M |
| 2021 | 28 | AED 1.11M | 617 | AED 33.43M |
| 2020 | 103 | AED 1.10M | 681 | AED 122.42M |
| 2019 | 289 | AED 1.10M | 682 | AED 343.27M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2023–2026
| Year | 3-bed villa | 4-bed villa | Gross yield |
|---|---|---|---|
| 2026 YTD | 100k | 135k | 4.42% |
| 2025 | 100k | 135k | 4.70% |
| 2024 | 95k | 130k | 5.62% |
| 2023 | 92k | 130k | 6.17% |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Mar 2026 | 5 | AED 3.00M | 1 101 | 937 – 1 150 |
| Feb 2026 | 4 | — | — | — |
| Jan 2026 | 3 | — | — | — |
| Dec 2025 | 2 | — | — | — |
| Nov 2025 | 4 | — | — | — |
| Oct 2025 | 4 | — | — | — |
| Sep 2025 | 3 | — | — | — |
| Aug 2025 | 2 | — | — | — |
| Jul 2025 | 4 | — | — | — |
| Jun 2025 | 7 | AED 2.20M | 1 369 | 1 180 – 1 423 |
| May 2025 | 8 | AED 2.17M | 1 449 | 1 391 – 1 488 |
| Apr 2025 | 6 | AED 2.12M | 1 349 | 1 197 – 1 417 |
| Mar 2025 | 4 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai World Central
Questions about Parkside 2
Who is the developer of Parkside 2?
The Dubai Land Department project registry lists Emaar Dubai South Dwc Llc as the developer of Parkside 2.
Is Parkside 2 completed?
The DLD registry status of Parkside 2 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 30 Jun 2023 — a registry date, not a handover promise.
How many homes are in Parkside 2?
The DLD registry records 422 units in Parkside 2.
What is the price per square foot in Parkside 2?
Over the last 12 complete months the median registered sale in Parkside 2 was AED 2.44M, or AED 1 421 per sqft, from 30 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Parkside 2?
The escrow agent recorded by DLD for Parkside 2 is Dubai Islamic Bank (Public Joint Stock Company).
Where is Parkside 2?
Parkside 2 is in the Dubai World Central community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗