Data Dubai

Qpoint Liwan-Plot R020

Qpoint Liwan-Plot R020Finished100% built81 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Qpoint Liwan-Plot R020: ChatGPT · Claude · Perplexity

Qpoint Liwan-Plot R020 is a project by Al Mazaya Real Estate Fz-Llc, recorded at 100% complete at its last Dubai Land Department inspection. 5 sales registered in the trailing 12 months at a median AED 550k (845 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 550k
≈ US$ 150k · typical range AED 550k – AED 570k
DLD verified
Median price per sqft
AED 845/sqft
typical range 734 – 845 AED/sqft
DLD verified
Registered sales
5 +25.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 5 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAl Mazaya Real Estate Fz-Llc
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD10 Jun 2009
Construction started1 May 2009
Declared completion24 Sep 2014 — registry date, not a handover promise
Units in the project81
Project area6 241 sqm
Escrow agentMashreq Bank Psc
Project number1217

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Dec 2021: in the 58 months since, no month reached the five registered sales a median needs (19 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 7 technical inspections for this project, from 26 Sep 2012 at 74.0% to 24 Sep 2014 at 95.1%. Over the inspections since 28 May 2013 it moved 1.02 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2014-09-242012-09-262014-09-24

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
24 Sep 201495.1% +5.0 pp
28 May 201490.1% +0.1 pp
3 Feb 201490.0% +0.4 pp
15 Sep 201389.6% +10.8 pp
28 May 201378.8% +1.3 pp
4 Feb 201377.5% +3.5 pp
26 Sep 201274.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments low sample (5) 5AED 550k 845 651 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
18 Nov 20262 B/R Flat — Farah tower 1Ready 1 068 sqftAED 850 000 796
13 Aug 20261 B/R Flat — Farah tower 1Ready 814 sqftAED 570 000 701
9 Jul 20261 B/R Flat — Farah tower 1Ready 811 sqftAED 595 000 734
17 Feb 20261 B/R Flat — Farah tower 1Ready 651 sqftAED 550 000 845
11 Feb 20261 B/R Flat — Farah tower 1Ready 651 sqftAED 550 000 845
11 Feb 20261 B/R Flat — Farah tower 1Ready 651 sqftAED 550 000 845

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Qpoint Liwan-Plot R020: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

020402015201620172019202020212022202320242025202602040201520172020202220242026

registered sales per calendar year; the current year is incomplete

By month

001JanFebMarAprMayJunJulAugSepOctNovDec001FebAprJunAugOctDec

registered sales per month, Jan 2022 – Dec 2022

YearSalesMedian priceMedian AED/sqftTotal registered value
20265AED 550k 845AED 2.81M
20253— —AED 1.78M
20245AED 500k 659AED 2.71M
20232— —AED 764k
20224— —AED 1.74M
20219AED 300k 369AED 2.73M
20206AED 365k 464AED 2.38M
20197AED 430k 551AED 3.06M
20173— —AED 1.44M
201611AED 630k 789AED 7.45M
201545AED 600k 802AED 29.61M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2015–2026

30k40k50k60k20152016201720182019202020212022202320242025202630k40k50k60k201520192023

1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
Year1-bed flatGross yield
2026 YTD 46k—
2025 47k—
2024 42k—
2023 34k—
2022 30k—
2021 27k—
2020 30k—
2019 36k—
2018 42k—
2017 47k—
2016 50k—
2015 57k9.50%

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Dec 20218 AED 300k369 368 – 369

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 5 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Qpoint Liwan-Plot R020. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Qpoint Liwan-Plot R016
Finished · Al Mazaya Holding Company
121 m100%72
Qpoint Liwan-Plot R015
Finished · Al Mazaya Real Estate Fz-Llc
133 m100%90
Qpoint Liwan-R019
Finished · Al Mazaya Real Estate Fz-Llc
153 m100%60
Qpoint Liwan-Plot R022
Finished · Al Mazaya Real Estate Fz-Llc
162 m100%65
Qpoint Liwan-Plot R008 A&B
Finished · Al Mazaya Real Estate Fz-Llc
187 m100%230
Sunrise Boulevard
Finished · Lux Real Estate
241 m100%6
Qpoint Liwan-Plot R017
Finished · Al Mazaya Holding Company
291 m100%126
Qline (Qpoint Phase Ii) R010
Finished · Al Mazaya Emirates Real Estate Development Owned By Mazaya Alghad One Person Company L.L.C
340 m100%154
Qpoint Liwan-Plot R009
Finished · Al Mazaya Holding Company
359 m100%117
Sunrise Boulevard 10
Finished · Lux Real Estate
398 m100%6

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Liwan1

Questions about Qpoint Liwan-Plot R020

Who is the developer of Qpoint Liwan-Plot R020?

The Dubai Land Department project registry lists Al Mazaya Real Estate Fz-Llc as the developer of Qpoint Liwan-Plot R020.

Is Qpoint Liwan-Plot R020 completed?

The DLD registry status of Qpoint Liwan-Plot R020 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 24 Sep 2014 — a registry date, not a handover promise.

How many homes are in Qpoint Liwan-Plot R020?

The DLD registry records 81 units in Qpoint Liwan-Plot R020.

What is the price per square foot in Qpoint Liwan-Plot R020?

Over the last 12 complete months the median registered sale in Qpoint Liwan-Plot R020 was AED 550k, or AED 845 per sqft, from 5 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Qpoint Liwan-Plot R020?

The escrow agent recorded by DLD for Qpoint Liwan-Plot R020 is Mashreq Bank Psc.

Where is Qpoint Liwan-Plot R020?

Qpoint Liwan-Plot R020 is in the Liwan1 community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Qpoint Liwan-Plot R016, about 121 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Qpoint Liwan-Plot R020 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/qpoint-liwan-plot-r020/”. Reuse is permitted with attribution.