Data Dubai

Qpoint Liwan-Plot R016

Qpoint Liwan-Plot R016Finished100% built72 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Qpoint Liwan-Plot R016: ChatGPT · Claude · Perplexity

Qpoint Liwan-Plot R016 is a project by Al Mazaya Holding Company, recorded at 100% complete at its last Dubai Land Department inspection. 7 sales registered in the trailing 12 months at a median AED 600k (714 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 600k
≈ US$ 163k · typical range AED 560k – AED 810k
DLD verified
Median price per sqft
AED 714/sqft
typical range 694 – 751 AED/sqft
DLD verified
Registered sales
7 +75.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 7 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAl Mazaya Holding Company
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD9 Jun 2009
Construction started19 Mar 2009
Declared completion15 Jan 2017 — registry date, not a handover promise
Units in the project72
Project area6 895 sqm
Escrow agentMashreq Bank Psc
Project number1191

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 14 technical inspections for this project, from 22 May 2012 at 3.8% to 20 Jul 2017 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2017-01-152012-05-222017-07-20

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
20 Jul 2017100.0% +18.8 pp
9 Jan 201781.2% +13.9 pp
10 Aug 201667.3% +5.9 pp
20 Mar 201661.4% +2.2 pp
29 Nov 201559.1% +1.3 pp
2 Jul 201557.9% +5.5 pp
18 Feb 201552.3% +4.2 pp
1 Nov 201448.1% +2.1 pp
17 Jul 201446.0% +1.5 pp
17 Mar 201444.5% +13.6 pp
13 Aug 201330.9% +13.9 pp
8 Apr 201317.0% +5.4 pp
26 Sep 201211.6% +7.8 pp
22 May 20123.8% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments low sample (5) 5AED 570k 737 746 sqft — —
2-bedroom apartments insufficient data 2— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
2 Nov 20261 B/R Flat — Mazaya 9Ready 746 sqftAED 560 000 751
12 Oct 20261 B/R Flat — Mazaya 9Ready 667 sqftAED 510 000 765
2 Oct 20262 B/R Flat — Mazaya 9Ready 1 625 sqftAED 1 000 000 615
7 Sep 20261 B/R Flat — Mazaya 9Ready 746 sqftAED 620 000 831
7 May 20261 B/R Flat — Mazaya 9Ready 746 sqftAED 550 000 737
31 Mar 20261 B/R Flat — Mazaya 9Ready 840 sqftAED 600 000 714
22 Jan 20262 B/R Flat — Mazaya 9Ready 1 625 sqftAED 1 150 000 708
19 Nov 20251 B/R Flat — Mazaya 9Ready 837 sqftAED 570 000 681

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Qpoint Liwan-Plot R016: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0102020152016201720182019202020212022202320242025202601020201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

012NovDecJanFebMarAprMayJunJulAugSepOct012DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20266AED 610k 726AED 4.43M
20255AED 580k 681AED 3.55M
20242— —AED 1.30M
20238AED 408k 523AED 3.40M
20225AED 420k —AED 2.51M
20212— —AED 930k
20203— —AED 1.70M
20196AED 737k 449AED 4.45M
20189AED 950k 685AED 7.88M
201718AED 657k 745AED 12.57M
201623AED 596k 588AED 15.02M
20159AED 520k 587AED 5.15M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent by year, 2017–2026

30k40k50k201720182019202020212022202320242025202630k40k50k2017202020232026

1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
Year1-bed flat
2026 YTD 50k
2025 45k
2024 40k
2023 35k
2022 30k
2021 28k
2020 30k
2019 34k
2018 45k
2017 46k

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 7 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Qpoint Liwan-Plot R016. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Qpoint Liwan-Plot R015
Finished · Al Mazaya Real Estate Fz-Llc
47 m100%90
Qpoint Liwan-Plot R020
Finished · Al Mazaya Real Estate Fz-Llc
121 m100%81
Qpoint Liwan-Plot R008 A&B
Finished · Al Mazaya Real Estate Fz-Llc
135 m100%230
Qpoint Liwan-R019
Finished · Al Mazaya Real Estate Fz-Llc
205 m100%60
Qpoint Liwan-Plot R017
Finished · Al Mazaya Holding Company
246 m100%126
Qline (Qpoint Phase Ii) R010
Finished · Al Mazaya Emirates Real Estate Development Owned By Mazaya Alghad One Person Company L.L.C
266 m100%154
Qpoint Liwan-Plot R022
Finished · Al Mazaya Real Estate Fz-Llc
268 m100%65
Qpoint Liwan-Plot R009
Finished · Al Mazaya Holding Company
297 m100%117
Sunrise Boulevard
Finished · Lux Real Estate
316 m100%6
Qpoint Liwan-Plot R005
Finished · Al Mazaya Real Estate Fz-Llc
327 m100%217

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Liwan1

Questions about Qpoint Liwan-Plot R016

Who is the developer of Qpoint Liwan-Plot R016?

The Dubai Land Department project registry lists Al Mazaya Holding Company as the developer of Qpoint Liwan-Plot R016.

Is Qpoint Liwan-Plot R016 completed?

The DLD registry status of Qpoint Liwan-Plot R016 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 15 Jan 2017 — a registry date, not a handover promise.

How many homes are in Qpoint Liwan-Plot R016?

The DLD registry records 72 units in Qpoint Liwan-Plot R016.

What is the price per square foot in Qpoint Liwan-Plot R016?

Over the last 12 complete months the median registered sale in Qpoint Liwan-Plot R016 was AED 600k, or AED 714 per sqft, from 7 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Qpoint Liwan-Plot R016?

The escrow agent recorded by DLD for Qpoint Liwan-Plot R016 is Mashreq Bank Psc.

Where is Qpoint Liwan-Plot R016?

Qpoint Liwan-Plot R016 is in the Liwan1 community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Qpoint Liwan-Plot R015, about 47 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Qpoint Liwan-Plot R016 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/qpoint-liwan-plot-r016/”. Reuse is permitted with attribution.