Qpoint Liwan-Plot R008 A&B
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Qpoint Liwan-Plot R008 A&B: ChatGPT · Claude · Perplexity
Qpoint Liwan-Plot R008 A&B is a project by Al Mazaya Real Estate Fz-Llc, recorded at 100% complete at its last Dubai Land Department inspection. 16 sales registered in the trailing 12 months at a median AED 725k (815 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 16 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Al Mazaya Real Estate Fz-Llc |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 8 Jun 2009 |
| Construction started | 1 Jun 2009 |
| Declared completion | 1 Jun 2014 — registry date, not a handover promise |
| Units in the project | 230 |
| Project area | 20 741 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 1183 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Sep 2025: in the 13 months since, no month reached the five registered sales a median needs (19 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 27 Jun 2012 at 76.0% to 19 Apr 2014 at 91.0%. Over the inspections since 20 Nov 2012 it moved 1.60 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 19 Apr 2014 | 91.0% | +1.0 pp |
| 25 Dec 2013 | 90.0% | +2.8 pp |
| 18 Aug 2013 | 87.3% | +12.0 pp |
| 14 Apr 2013 | 75.2% | +11.2 pp |
| 20 Nov 2012 | 64.0% | -12.0 pp |
| 27 Jun 2012 | 76.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (10) | 10 | AED 572k | 847 | 700 sqft | — | — |
| 2-bedroom apartments low sample (5) | 5 | AED 910k | 788 | 1 321 sqft | — | — |
| 3-bedroom apartments insufficient data | 1 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 10 Nov 2026 | 2 B/R Flat — Mazaya 10 - A | Ready | 1 332 sqft | AED 1 100 000 | 826 |
| 10 Aug 2026 | 1 B/R Flat — Mazaya 10 - B | Ready | 605 sqft | AED 650 000 | 1 074 |
| 27 Jul 2026 | 1 B/R Flat — Mazaya 10 - A | Ready | 688 sqft | AED 570 000 | 829 |
| 22 Jul 2026 | 1 B/R Flat — Mazaya 10 - A | Ready | 698 sqft | AED 615 000 | 881 |
| 8 Jul 2026 | 1 B/R Flat — Mazaya 10 - A | Ready | 698 sqft | AED 550 000 | 788 |
| 8 Jul 2026 | 1 B/R Flat — Mazaya 10 - A | Ready | 709 sqft | AED 550 000 | 776 |
| 8 May 2026 | 1 B/R Flat — Mazaya 10 - B | Ready | 729 sqft | AED 470 000 | 645 |
| 6 Apr 2026 | 1 B/R Flat — Mazaya 10 - A | Ready | 702 sqft | AED 575 000 | 819 |
| 1 Apr 2026 | 2 B/R Flat — Mazaya 10 - B | Ready | 1 042 sqft | AED 910 000 | 873 |
| 25 Mar 2026 | 2 B/R Flat — Mazaya 10 - A | Ready | 1 171 sqft | AED 950 000 | 811 |
| 5 Mar 2026 | 1 B/R Flat — Mazaya 10 - B | Ready | 894 sqft | AED 800 000 | 895 |
| 18 Feb 2026 | 2 B/R Flat — Mazaya 10 - A | Ready | 1 332 sqft | AED 1 050 000 | 788 |
| 9 Feb 2026 | 3 B/R Flat — Mazaya 10 - B | Ready | 1 765 sqft | AED 1 185 000 | 671 |
| 30 Jan 2026 | 1 B/R Flat — Mazaya 10 - A | Ready | 845 sqft | AED 850 000 | 1 006 |
| 31 Dec 2025 | 2 B/R Flat — Mazaya 10 - A | Ready | 1 321 sqft | AED 900 000 | 681 |
| 17 Dec 2025 | 2 B/R Flat — Mazaya 10 - B | Ready | 1 398 sqft | AED 900 000 | 644 |
| 18 Nov 2025 | 1 B/R Flat — Mazaya 10 - B | Ready | 577 sqft | AED 499 000 | 865 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Qpoint Liwan-Plot R008 A&B: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Oct 2025 – Sep 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 13 | AED 650k | 819 | AED 9.72M |
| 2025 | 36 | AED 642k | 726 | AED 26.09M |
| 2024 | 25 | AED 640k | 560 | AED 15.94M |
| 2023 | 16 | AED 405k | 531 | AED 7.62M |
| 2022 | 15 | AED 350k | 455 | AED 5.99M |
| 2021 | 14 | AED 468k | 432 | AED 6.80M |
| 2020 | 7 | AED 495k | 437 | AED 3.83M |
| 2019 | 7 | AED 625k | 503 | AED 4.55M |
| 2018 | 8 | AED 596k | 637 | AED 4.86M |
| 2017 | 18 | AED 572k | 668 | AED 11.20M |
| 2016 | 17 | AED 573k | 706 | AED 11.44M |
| 2015 | 132 | AED 650k | 712 | AED 91.71M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2014–2026
1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | 1-bed flat | 2-bed flat | Gross yield |
|---|---|---|---|
| 2026 YTD | 47k | 70k | — |
| 2025 | 45k | 66k | 8.11% |
| 2024 | 38k | 62k | — |
| 2023 | 33k | 54k | — |
| 2022 | 29k | 42k | — |
| 2021 | 26k | 40k | — |
| 2020 | 31k | 45k | — |
| 2019 | 36k | 53k | — |
| 2018 | 44k | 62k | — |
| 2017 | 50k | 65k | — |
| 2016 | 53k | 72k | — |
| 2015 | 52k | 75k | 9.20% |
| 2014 | 50k | — | 9.36% |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Sep 2025 | 5 | AED 650k | 723 | 683 – 750 |
| Aug 2025 | 2 | — | — | — |
| Jul 2025 | 4 | — | — | — |
| Jun 2025 | 4 | — | — | — |
| May 2025 | 4 | — | — | — |
| Apr 2025 | 3 | — | — | — |
| Mar 2025 | 2 | — | — | — |
| Feb 2025 | 4 | — | — | — |
| Jan 2025 | 2 | — | — | — |
| Dec 2024 | 1 | — | — | — |
| Nov 2024 | 3 | — | — | — |
| Oct 2024 | 4 | — | — | — |
| Sep 2024 | 3 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
Buildings in this project
| Building (DLD name) | Sales | Median price | Median AED/sqft | Off-plan |
|---|---|---|---|---|
| Mazaya 10 - A low sample (9) | 9 | AED 615k | 811 | 0.0% |
| Mazaya 10 - B low sample (7) | 7 | AED 800k | 865 | 0.0% |
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 16 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Qpoint Liwan-Plot R008 A&B. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Qpoint Liwan-Plot R016 Finished · Al Mazaya Holding Company |
135 m | 100% |
| Qpoint Liwan-Plot R015 Finished · Al Mazaya Real Estate Fz-Llc |
182 m | 100% |
| Qpoint Liwan-Plot R020 Finished · Al Mazaya Real Estate Fz-Llc |
187 m | 100% |
| Sunrise Boulevard Finished · Lux Real Estate |
254 m | 100% |
| Qpoint Liwan-R019 Finished · Al Mazaya Real Estate Fz-Llc |
323 m | 100% |
| Qpoint Liwan-Plot R022 Finished · Al Mazaya Real Estate Fz-Llc |
348 m | 100% |
| Qpoint Liwan-Plot R017 Finished · Al Mazaya Holding Company |
379 m | 100% |
| Qline (Qpoint Phase Ii) R010 Finished · Al Mazaya Emirates Real Estate Development Owned By Mazaya Alghad One Person Company L.L.C |
388 m | 100% |
| Donna Towers Cancelled · Seasif Group Fzco |
392 m | 79% |
| Sunrise Boulevard 10 Finished · Lux Real Estate |
422 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Liwan1
Questions about Qpoint Liwan-Plot R008 A&B
Who is the developer of Qpoint Liwan-Plot R008 A&B?
The Dubai Land Department project registry lists Al Mazaya Real Estate Fz-Llc as the developer of Qpoint Liwan-Plot R008 A&B.
Is Qpoint Liwan-Plot R008 A&B completed?
The DLD registry status of Qpoint Liwan-Plot R008 A&B is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 1 Jun 2014 — a registry date, not a handover promise.
How many homes are in Qpoint Liwan-Plot R008 A&B?
The DLD registry records 230 units in Qpoint Liwan-Plot R008 A&B.
What is the price per square foot in Qpoint Liwan-Plot R008 A&B?
Over the last 12 complete months the median registered sale in Qpoint Liwan-Plot R008 A&B was AED 725k, or AED 815 per sqft, from 16 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Qpoint Liwan-Plot R008 A&B?
The escrow agent recorded by DLD for Qpoint Liwan-Plot R008 A&B is Mashreq Bank Psc.
Where is Qpoint Liwan-Plot R008 A&B?
Qpoint Liwan-Plot R008 A&B is in the Liwan1 community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Qpoint Liwan-Plot R016, about 135 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗