Data Dubai

Qpoint Liwan-Plot R094

Qpoint Liwan-Plot R094Finished100% built55 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Qpoint Liwan-Plot R094: ChatGPT · Claude · Perplexity

Qpoint Liwan-Plot R094 is a project by Al Mazaya Real Estate Fz-Llc, recorded at 100% complete at its last Dubai Land Department inspection. 6 sales registered in the trailing 12 months at a median AED 585k (809 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 585k +6.4% y/y
≈ US$ 159k · typical range AED 531k – AED 642k
DLD verified
Median price per sqft
AED 809/sqft +4.3% y/y
typical range 763 – 872 AED/sqft
DLD verified
Registered sales
6 -40.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 6 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAl Mazaya Real Estate Fz-Llc
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD10 Jun 2009
Construction started1 Jul 2009
Declared completion11 Nov 2013 — registry date, not a handover promise
Units in the project55
Project area4 606 sqm
Escrow agentMashreq Bank Psc
Project number1205

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 4 technical inspections for this project, from 13 Aug 2012 at 81.4% to 15 Sep 2013 at 94.2%. Over the inspections since 13 Aug 2012 it moved 0.98 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2013-11-112012-08-132013-09-15

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
15 Sep 201394.2% +0.4 pp
28 May 201393.8% +9.3 pp
26 Jan 201384.5% +3.1 pp
13 Aug 201281.4% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments low sample (5) 5AED 550k 846 620 sqft — —
2-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
22 Oct 20261 B/R Flat — Mazaya 23Ready 579 sqftAED 510 000 881
5 Aug 20261 B/R Flat — Mazaya 23Ready 1 066 sqftAED 650 000 610
26 Feb 20261 B/R Flat — Mazaya 23Ready 620 sqftAED 525 000 846
19 Feb 20261 B/R Flat — Mazaya 23Ready 816 sqftAED 620 000 760
2 Jan 20262 B/R Flat — Mazaya 23Ready 1 102 sqftAED 850 000 771
16 Dec 20251 B/R Flat — Mazaya 23Ready 611 sqftAED 550 000 901

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Qpoint Liwan-Plot R094: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0204020132014201520162017201820192020202220242025202602040201420162018202020242026

registered sales per calendar year; the current year is incomplete

By month

012NovDecJanFebMarAprMayJunJulAugSepOct012DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20265AED 620k 771AED 3.15M
202510AED 550k 848AED 6.20M
20246AED 470k 609AED 2.88M
20225AED 589k 475AED 2.59M
20202— —AED 760k
20191— —AED 800k
20185AED 400k 700AED 2.44M
20174— —AED 2.92M
201610AED 772k 712AED 7.09M
20159AED 640k 797AED 5.97M
201445AED 592k 699AED 28.40M
20132— —AED 1.07M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent by year, 2015–2026

30k40k50k20152016201720182019202020212022202320242025202630k40k50k201520192023

1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
Year1-bed flat
2026 YTD 48k
2025 45k
2024 40k
2023 32k
2022 28k
2021 25k
2020 28k
2019 36k
2018 42k
2017 45k
2016 46k
2015 48k

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 6 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Qpoint Liwan-Plot R094. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Qpoint Liwan- R093
Finished · Al Mazaya Real Estate Fz-Llc
50 m100%65
Qpoint Liwan-Plot R095
Finished · Al Mazaya Real Estate Fz-Llc
50 m100%55
Qpoint Liwan-Plot R096
Finished · Al Mazaya Holding Company
100 m100%55
Qpoint Liwan-Plot R092
Finished · Al Mazaya Real Estate Fz-Llc
108 m100%80
Qpoint Liwan-Plot R097
Finished · Al Mazaya Real Estate Fz-Llc
150 m100%55
Qpoint Liwan-Plot R098
Finished · Al Mazaya Real Estate Fz-Llc
200 m100%55
Qpoint Liwan-Plot R099
Finished · Al Mazaya Real Estate Fz-Llc
250 m100%55
Qline (Qpoint Phase Ii) R085
Finished · Al Mazaya Emirates Real Estate Development Owned By Mazaya Alghad One Person Company L.L.C
285 m100%99
Qpoint Liwan-Plot R100
Finished · Al Mazaya Real Estate Fz-Llc
295 m100%40
Qpoint Liwan-Plot R081
Finished · Al Mazaya Real Estate Fz-Llc
296 m100%95

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Liwan1

Questions about Qpoint Liwan-Plot R094

Who is the developer of Qpoint Liwan-Plot R094?

The Dubai Land Department project registry lists Al Mazaya Real Estate Fz-Llc as the developer of Qpoint Liwan-Plot R094.

Is Qpoint Liwan-Plot R094 completed?

The DLD registry status of Qpoint Liwan-Plot R094 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 11 Nov 2013 — a registry date, not a handover promise.

How many homes are in Qpoint Liwan-Plot R094?

The DLD registry records 55 units in Qpoint Liwan-Plot R094.

What is the price per square foot in Qpoint Liwan-Plot R094?

Over the last 12 complete months the median registered sale in Qpoint Liwan-Plot R094 was AED 585k, or AED 809 per sqft, from 6 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Qpoint Liwan-Plot R094?

The escrow agent recorded by DLD for Qpoint Liwan-Plot R094 is Mashreq Bank Psc.

Where is Qpoint Liwan-Plot R094?

Qpoint Liwan-Plot R094 is in the Liwan1 community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Qpoint Liwan- R093, about 50 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Qpoint Liwan-Plot R094 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/qpoint-liwan-plot-r094/”. Reuse is permitted with attribution.