Data Dubai

Qpoint Liwan-Plotr001

Qpoint Liwan-Plotr001Finished100% built63 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Qpoint Liwan-Plotr001: ChatGPT · Claude · Perplexity

Qpoint Liwan-Plotr001 is a project by Al Mazaya Holding Company, recorded at 100% complete at its last Dubai Land Department inspection. 6 sales registered in the trailing 12 months at a median AED 835k (586 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 835k +7.1% y/y
≈ US$ 227k · typical range AED 805k – AED 858k
DLD verified
Median price per sqft
AED 586/sqft +8.9% y/y
typical range 551 – 613 AED/sqft
DLD verified
Registered sales
6 -14.3% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 6 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAl Mazaya Holding Company
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD8 Nov 2008
Construction started9 Mar 2008
Declared completion19 Jan 2014 — registry date, not a handover promise
Units in the project63
Project area7 133 sqm
Escrow agentMashreq Bank Psc
Project number895

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Oct 2024: in the 24 months since, no month reached the five registered sales a median needs (13 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 5 technical inspections for this project, from 20 Mar 2011 at 46.4% to 15 Sep 2013 at 99.0%. Over the inspections since 20 Nov 2012 it moved 0.81 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2014-01-192011-03-202013-09-15

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
15 Sep 201399.0% +0.7 pp
10 Apr 201398.3% +28.6 pp
10 Jan 201369.7% -21.3 pp
20 Nov 201291.0% +44.6 pp
20 Mar 201146.4% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
2-bedroom apartments low sample (6) 6AED 835k 586 1 461 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
11 Jun 20262 B/R Flat — TALA 1Ready 1 410 sqftAED 860 000 610
11 Mar 20262 B/R Flat — TALA 1Ready 1 386 sqftAED 850 000 613
3 Mar 20262 B/R Flat — TALA 1Ready 1 576 sqftAED 1 020 000 647
5 Feb 20262 B/R Flat — TALA 1Ready 1 461 sqftAED 820 000 561
27 Jan 20262 B/R Flat — TALA 1Ready 1 461 sqftAED 780 000 534
27 Nov 20252 B/R Flat — TALA 1Ready 1 461 sqftAED 800 000 548

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Qpoint Liwan-Plotr001: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

051015201520162017201820192020202120222023202420252026051015201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

001NovDecJanFebMarAprMayJunJulAugSepOct001DecFebAprJunAugOct

registered sales per month, Nov 2024 – Oct 2025

YearSalesMedian priceMedian AED/sqftTotal registered value
20265AED 850k 610AED 4.33M
20256AED 800k 541AED 4.50M
202414AED 508k 530AED 7.74M
20233— —AED 1.74M
20226AED 570k 403AED 3.23M
202112AED 598k 411AED 6.73M
202018AED 555k 432AED 9.74M
20191— —AED 358k
20182— —AED 920k
20171— —AED 490k
20162— —AED 1.09M
20159AED 834k 787AED 7.50M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent by year, 2014–2019

60k70k80k20142015201620172018201960k70k80k201420162018

2-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
Year2-bed flat
2019 56k
2018 62k
2017 70k
2016 78k
2015 80k
2014 70k

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Oct 20246 AED 513k594 528 – 674

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 6 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Qpoint Liwan-Plotr001. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Qpoint Liwan - Plot R002
Finished · Al Mazaya Real Estate Fz-Llc
47 m100%78
Qpoint Liwan - Plot R003
Finished · Al Mazaya Real Estate Fz-Llc
100 m100%91
Qpoint Liwan-Plot R004
Finished · Al Mazaya Real Estate Fz-Llc
100 m100%220
Qpoint Liwan-Plot R005
Finished · Al Mazaya Real Estate Fz-Llc
172 m100%217
Qpoint Liwan-Plot R009
Finished · Al Mazaya Holding Company
228 m100%117
Qline (Qpoint Phase Ii) R010
Finished · Al Mazaya Emirates Real Estate Development Owned By Mazaya Alghad One Person Company L.L.C
235 m100%154
Qpoint Liwan-Plot R017
Finished · Al Mazaya Holding Company
304 m100%126
Qpoint Liwan-Plot R015
Finished · Al Mazaya Real Estate Fz-Llc
452 m100%90
Qpoint Liwan-Plot R016
Finished · Al Mazaya Holding Company
489 m100%72
Qpoint Liwan-R019
Finished · Al Mazaya Real Estate Fz-Llc
504 m100%60

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Liwan1

Questions about Qpoint Liwan-Plotr001

Who is the developer of Qpoint Liwan-Plotr001?

The Dubai Land Department project registry lists Al Mazaya Holding Company as the developer of Qpoint Liwan-Plotr001.

Is Qpoint Liwan-Plotr001 completed?

The DLD registry status of Qpoint Liwan-Plotr001 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 19 Jan 2014 — a registry date, not a handover promise.

How many homes are in Qpoint Liwan-Plotr001?

The DLD registry records 63 units in Qpoint Liwan-Plotr001.

What is the price per square foot in Qpoint Liwan-Plotr001?

Over the last 12 complete months the median registered sale in Qpoint Liwan-Plotr001 was AED 835k, or AED 586 per sqft, from 6 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Qpoint Liwan-Plotr001?

The escrow agent recorded by DLD for Qpoint Liwan-Plotr001 is Mashreq Bank Psc.

Where is Qpoint Liwan-Plotr001?

Qpoint Liwan-Plotr001 is in the Liwan1 community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Qpoint Liwan - Plot R002, about 47 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Qpoint Liwan-Plotr001 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/qpoint-liwan-plotr001/”. Reuse is permitted with attribution.