Qpoint Liwan-Plot R004
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Qpoint Liwan-Plot R004: ChatGPT · Claude · Perplexity
Qpoint Liwan-Plot R004 is a project by Al Mazaya Real Estate Fz-Llc, recorded at 100% complete at its last Dubai Land Department inspection. 11 sales registered in the trailing 12 months at a median AED 515k (571 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 11 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Al Mazaya Real Estate Fz-Llc |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 9 Jun 2009 |
| Construction started | 18 Dec 2008 |
| Declared completion | 17 Aug 2014 — registry date, not a handover promise |
| Units in the project | 220 |
| Project area | 18 830 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 1188 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 5 technical inspections for this project, from 20 Jun 2012 at 80.5% to 19 Jun 2014 at 98.7%. Over the inspections since 14 Apr 2013 it moved 0.68 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 19 Jun 2014 | 98.7% | +3.2 pp |
| 18 Aug 2013 | 95.5% | +6.5 pp |
| 14 Apr 2013 | 89.0% | +2.4 pp |
| 15 Oct 2012 | 86.6% | +6.1 pp |
| 20 Jun 2012 | 80.5% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (7) | 7 | AED 450k | 624 | 641 sqft | — | — |
| 2-bedroom apartments insufficient data | 3 | — | — | — | — | — |
| 3-bedroom apartments insufficient data | 1 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 4 Sep 2026 | 3 B/R Flat — Mazaya 3 | Ready | 1 813 sqft | AED 930 000 | 513 |
| 4 Jun 2026 | 1 B/R Flat — Mazaya 3 | Ready | 934 sqft | AED 515 000 | 551 |
| 13 May 2026 | 2 B/R Flat — Mazaya 3 | Ready | 1 246 sqft | AED 700 000 | 562 |
| 30 Apr 2026 | 1 B/R Flat — Mazaya 3 | Ready | 618 sqft | AED 410 270 | 664 |
| 29 Apr 2026 | 2 B/R Flat — Mazaya 3 | Ready | 1 501 sqft | AED 700 000 | 466 |
| 6 Apr 2026 | 1 B/R Flat — Mazaya 3 | Ready | 641 sqft | AED 400 000 | 624 |
| 13 Feb 2026 | 2 B/R Flat — Mazaya 3 | Ready | 1 168 sqft | AED 680 000 | 582 |
| 2 Feb 2026 | 1 B/R Flat — Mazaya 3 | Ready | 593 sqft | AED 450 000 | 759 |
| 28 Jan 2026 | 1 B/R Flat — Mazaya 3 | Ready | 910 sqft | AED 520 000 | 571 |
| 29 Dec 2025 | 1 B/R Flat — Mazaya 3 | Ready | 594 sqft | AED 380 000 | 640 |
| 13 Nov 2025 | 1 B/R Flat — Mazaya 3 | Ready | 893 sqft | AED 499 000 | 559 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Qpoint Liwan-Plot R004: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 9 | AED 520k | 571 | AED 5.31M |
| 2025 | 8 | AED 378k | 494 | AED 3.17M |
| 2023 | 1 | — | — | AED 0 |
| 2022 | 3 | — | — | AED 787k |
| 2021 | 12 | AED 388k | 420 | AED 5.18M |
| 2020 | 3 | — | — | AED 1.43M |
| 2019 | 8 | AED 380k | 587 | AED 3.71M |
| 2018 | 10 | AED 505k | 628 | AED 5.48M |
| 2017 | 15 | AED 490k | 628 | AED 8.72M |
| 2016 | 28 | AED 480k | 731 | AED 16.57M |
| 2015 | 103 | AED 670k | 732 | AED 70.73M |
| 2014 | 7 | AED 470k | 688 | AED 4.45M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2015–2022
1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | 1-bed flat | 2-bed flat | Gross yield |
|---|---|---|---|
| 2022 | 26k | 41k | — |
| 2021 | 25k | 40k | — |
| 2020 | 28k | 45k | — |
| 2019 | 35k | 53k | — |
| 2018 | 40k | 60k | — |
| 2017 | 46k | 70k | — |
| 2016 | 50k | 75k | 10.87% |
| 2015 | 50k | 74k | 8.80% |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 11 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Qpoint Liwan-Plot R004. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Qpoint Liwan - Plot R003 Finished · Al Mazaya Real Estate Fz-Llc |
54 m | 100% |
| Qpoint Liwan - Plot R002 Finished · Al Mazaya Real Estate Fz-Llc |
65 m | 100% |
| Qpoint Liwan-Plot R005 Finished · Al Mazaya Real Estate Fz-Llc |
73 m | 100% |
| Qpoint Liwan-Plotr001 Finished · Al Mazaya Holding Company |
100 m | 100% |
| Qline (Qpoint Phase Ii) R010 Finished · Al Mazaya Emirates Real Estate Development Owned By Mazaya Alghad One Person Company L.L.C |
147 m | 100% |
| Qpoint Liwan-Plot R009 Finished · Al Mazaya Holding Company |
154 m | 100% |
| Qpoint Liwan-Plot R017 Finished · Al Mazaya Holding Company |
226 m | 100% |
| Qpoint Liwan-Plot R015 Finished · Al Mazaya Real Estate Fz-Llc |
355 m | 100% |
| Qpoint Liwan-Plot R016 Finished · Al Mazaya Holding Company |
391 m | 100% |
| Qpoint Liwan-R019 Finished · Al Mazaya Real Estate Fz-Llc |
423 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Liwan1
Questions about Qpoint Liwan-Plot R004
Who is the developer of Qpoint Liwan-Plot R004?
The Dubai Land Department project registry lists Al Mazaya Real Estate Fz-Llc as the developer of Qpoint Liwan-Plot R004.
Is Qpoint Liwan-Plot R004 completed?
The DLD registry status of Qpoint Liwan-Plot R004 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 17 Aug 2014 — a registry date, not a handover promise.
How many homes are in Qpoint Liwan-Plot R004?
The DLD registry records 220 units in Qpoint Liwan-Plot R004.
What is the price per square foot in Qpoint Liwan-Plot R004?
Over the last 12 complete months the median registered sale in Qpoint Liwan-Plot R004 was AED 515k, or AED 571 per sqft, from 11 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Qpoint Liwan-Plot R004?
The escrow agent recorded by DLD for Qpoint Liwan-Plot R004 is Mashreq Bank Psc.
Where is Qpoint Liwan-Plot R004?
Qpoint Liwan-Plot R004 is in the Liwan1 community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Qpoint Liwan - Plot R003, about 54 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗