Data Dubai

Qpoint Liwan-Plot R004

Qpoint Liwan-Plot R004Finished100% built220 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Qpoint Liwan-Plot R004: ChatGPT · Claude · Perplexity

Qpoint Liwan-Plot R004 is a project by Al Mazaya Real Estate Fz-Llc, recorded at 100% complete at its last Dubai Land Department inspection. 11 sales registered in the trailing 12 months at a median AED 515k (571 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 515k +39.0% y/y
≈ US$ 140k · typical range AED 430k – AED 690k
DLD verified
Median price per sqft
AED 571/sqft +23.2% y/y
typical range 555 – 632 AED/sqft
DLD verified
Registered sales
11 +83.3% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 11 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAl Mazaya Real Estate Fz-Llc
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD9 Jun 2009
Construction started18 Dec 2008
Declared completion17 Aug 2014 — registry date, not a handover promise
Units in the project220
Project area18 830 sqm
Escrow agentMashreq Bank Psc
Project number1188

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 5 technical inspections for this project, from 20 Jun 2012 at 80.5% to 19 Jun 2014 at 98.7%. Over the inspections since 14 Apr 2013 it moved 0.68 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2014-08-172012-06-202014-06-19

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
19 Jun 201498.7% +3.2 pp
18 Aug 201395.5% +6.5 pp
14 Apr 201389.0% +2.4 pp
15 Oct 201286.6% +6.1 pp
20 Jun 201280.5% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments low sample (7) 7AED 450k 624 641 sqft — —
2-bedroom apartments insufficient data 3— — — — —
3-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
4 Sep 20263 B/R Flat — Mazaya 3Ready 1 813 sqftAED 930 000 513
4 Jun 20261 B/R Flat — Mazaya 3Ready 934 sqftAED 515 000 551
13 May 20262 B/R Flat — Mazaya 3Ready 1 246 sqftAED 700 000 562
30 Apr 20261 B/R Flat — Mazaya 3Ready 618 sqftAED 410 270 664
29 Apr 20262 B/R Flat — Mazaya 3Ready 1 501 sqftAED 700 000 466
6 Apr 20261 B/R Flat — Mazaya 3Ready 641 sqftAED 400 000 624
13 Feb 20262 B/R Flat — Mazaya 3Ready 1 168 sqftAED 680 000 582
2 Feb 20261 B/R Flat — Mazaya 3Ready 593 sqftAED 450 000 759
28 Jan 20261 B/R Flat — Mazaya 3Ready 910 sqftAED 520 000 571
29 Dec 20251 B/R Flat — Mazaya 3Ready 594 sqftAED 380 000 640
13 Nov 20251 B/R Flat — Mazaya 3Ready 893 sqftAED 499 000 559

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Qpoint Liwan-Plot R004: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

050100201420152016201720182019202020212022202320252026050100201520172019202120232026

registered sales per calendar year; the current year is incomplete

By month

0123NovDecJanFebMarAprMayJunJulAugSepOct0123DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20269AED 520k 571AED 5.31M
20258AED 378k 494AED 3.17M
20231— —AED 0
20223— —AED 787k
202112AED 388k 420AED 5.18M
20203— —AED 1.43M
20198AED 380k 587AED 3.71M
201810AED 505k 628AED 5.48M
201715AED 490k 628AED 8.72M
201628AED 480k 731AED 16.57M
2015103AED 670k 732AED 70.73M
20147AED 470k 688AED 4.45M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2015–2022

40k60k2015201620172018201920202021202240k60k2015201720192021

1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
Year1-bed flat2-bed flatGross yield
2022 26k41k—
2021 25k40k—
2020 28k45k—
2019 35k53k—
2018 40k60k—
2017 46k70k—
2016 50k75k10.87%
2015 50k74k8.80%

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 11 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Qpoint Liwan-Plot R004. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Qpoint Liwan - Plot R003
Finished · Al Mazaya Real Estate Fz-Llc
54 m100%91
Qpoint Liwan - Plot R002
Finished · Al Mazaya Real Estate Fz-Llc
65 m100%78
Qpoint Liwan-Plot R005
Finished · Al Mazaya Real Estate Fz-Llc
73 m100%217
Qpoint Liwan-Plotr001
Finished · Al Mazaya Holding Company
100 m100%63
Qline (Qpoint Phase Ii) R010
Finished · Al Mazaya Emirates Real Estate Development Owned By Mazaya Alghad One Person Company L.L.C
147 m100%154
Qpoint Liwan-Plot R009
Finished · Al Mazaya Holding Company
154 m100%117
Qpoint Liwan-Plot R017
Finished · Al Mazaya Holding Company
226 m100%126
Qpoint Liwan-Plot R015
Finished · Al Mazaya Real Estate Fz-Llc
355 m100%90
Qpoint Liwan-Plot R016
Finished · Al Mazaya Holding Company
391 m100%72
Qpoint Liwan-R019
Finished · Al Mazaya Real Estate Fz-Llc
423 m100%60

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Liwan1

Questions about Qpoint Liwan-Plot R004

Who is the developer of Qpoint Liwan-Plot R004?

The Dubai Land Department project registry lists Al Mazaya Real Estate Fz-Llc as the developer of Qpoint Liwan-Plot R004.

Is Qpoint Liwan-Plot R004 completed?

The DLD registry status of Qpoint Liwan-Plot R004 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 17 Aug 2014 — a registry date, not a handover promise.

How many homes are in Qpoint Liwan-Plot R004?

The DLD registry records 220 units in Qpoint Liwan-Plot R004.

What is the price per square foot in Qpoint Liwan-Plot R004?

Over the last 12 complete months the median registered sale in Qpoint Liwan-Plot R004 was AED 515k, or AED 571 per sqft, from 11 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Qpoint Liwan-Plot R004?

The escrow agent recorded by DLD for Qpoint Liwan-Plot R004 is Mashreq Bank Psc.

Where is Qpoint Liwan-Plot R004?

Qpoint Liwan-Plot R004 is in the Liwan1 community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Qpoint Liwan - Plot R003, about 54 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Qpoint Liwan-Plot R004 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/qpoint-liwan-plot-r004/”. Reuse is permitted with attribution.