Sobha Hartland Waves Grande
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Sobha Hartland Waves Grande: ChatGPT · Claude · Perplexity
Sobha Hartland Waves Grande is a project by Sobha L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 20 sales registered in the trailing 12 months at a median AED 1.91M (2 096 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 20 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Sobha L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 2 Nov 2021 |
| Construction started | 1 Aug 2021 |
| Declared completion | 31 Oct 2023 — registry date, not a handover promise |
| Units in the project | 440 |
| Project area | 42 118 sqm |
| Escrow agent | Bank Of Baroda |
| Project number | 2305 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2025: in the 15 months since, no month reached the five registered sales a median needs (28 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 7 technical inspections for this project, from 5 Oct 2021 at 6.0% to 31 Oct 2023 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 31 Oct 2023 | 100.0% | +9.0 pp |
| 25 Jul 2023 | 91.0% | +20.7 pp |
| 27 Feb 2023 | 70.2% | +19.9 pp |
| 15 Nov 2022 | 50.4% | +19.3 pp |
| 22 Jul 2022 | 31.0% | +12.1 pp |
| 3 Mar 2022 | 18.9% | +12.9 pp |
| 5 Oct 2021 | 6.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (14) | 14 | AED 1.82M | 2 091 | 911 sqft | — | — |
| 2-bedroom apartments low sample (6) | 6 | AED 2.69M | 2 130 | 1 288 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 9 Nov 2026 | 1 B/R Flat | Ready | 710 sqft | AED 1 550 000 | 2 184 |
| 5 Nov 2026 | 1 B/R Flat | Ready | 910 sqft | AED 1 770 000 | 1 946 |
| 5 Nov 2026 | 1 B/R Flat | Ready | 910 sqft | AED 1 775 000 | 1 951 |
| 10 Aug 2026 | 1 B/R Flat | Ready | 911 sqft | AED 98 683 | 108 |
| 31 Jul 2026 | 1 B/R Flat | Ready | 912 sqft | AED 1 790 000 | 1 963 |
| 16 Jul 2026 | 2 B/R Flat | Ready | 1 410 sqft | AED 2 500 000 | 1 773 |
| 10 Jul 2026 | 1 B/R Flat | Ready | 910 sqft | AED 1 750 000 | 1 924 |
| 19 May 2026 | 1 B/R Flat | Ready | 808 sqft | AED 1 750 000 | 2 166 |
| 27 Apr 2026 | 2 B/R Flat | Ready | 1 404 sqft | AED 2 690 000 | 1 916 |
| 13 Apr 2026 | 1 B/R Flat | Ready | 711 sqft | AED 1 772 000 | 2 491 |
| 30 Mar 2026 | 2 B/R Flat | Ready | 1 249 sqft | AED 2 620 000 | 2 098 |
| 25 Mar 2026 | 2 B/R Flat | Ready | 1 249 sqft | AED 2 700 000 | 2 162 |
| 4 Mar 2026 | 1 B/R Flat | Ready | 910 sqft | AED 1 900 000 | 2 087 |
| 2 Mar 2026 | 1 B/R Flat | Ready | 912 sqft | AED 1 910 000 | 2 094 |
| 16 Feb 2026 | 1 B/R Flat | Ready | 1 055 sqft | AED 2 200 000 | 2 085 |
| 9 Feb 2026 | 1 B/R Flat | Ready | 808 sqft | AED 1 750 000 | 2 166 |
| 23 Jan 2026 | 1 B/R Flat | Ready | 910 sqft | AED 1 850 000 | 2 033 |
| 19 Jan 2026 | 2 B/R Flat | Ready | 1 328 sqft | AED 3 200 000 | 2 409 |
| 15 Jan 2026 | 2 B/R Flat | Ready | 1 246 sqft | AED 2 770 000 | 2 224 |
| 15 Jan 2026 | 1 B/R Flat | Ready | 911 sqft | AED 75 486 | 83 |
| 3 Dec 2025 | 1 B/R Flat | Ready | 911 sqft | AED 2 000 000 | 2 194 |
| 24 Nov 2025 | 1 B/R Flat | Ready | 808 sqft | AED 1 800 000 | 2 228 |
| 4 Nov 2025 | 1 B/R Flat | Ready | 912 sqft | AED 1 900 000 | 2 084 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Sobha Hartland Waves Grande: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Aug 2025 – Jul 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 17 | AED 1.91M | 2 094 | AED 33.15M |
| 2025 | 40 | AED 1.85M | 2 194 | AED 79.48M |
| 2024 | 191 | AED 1.65M | 1 920 | AED 367.64M |
| 2023 | 52 | AED 1.52M | 1 785 | AED 88.72M |
| 2022 | 392 | AED 1.53M | 1 700 | AED 712.66M |
| 2021 | 10 | AED 1.23M | 1 700 | AED 14.50M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2023–2026
| Year | 1-bed flat | 2-bed flat | Gross yield |
|---|---|---|---|
| 2026 YTD | 108k | 155k | — |
| 2025 | 110k | 160k | 6.06% |
| 2024 | 110k | 160k | 6.71% |
| 2023 | 100k | — | — |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jul 2025 | 9 | AED 1.77M | 1 972 | 1 941 – 2 249 |
| Jun 2025 | 2 | — | — | — |
| May 2025 | 3 | — | — | — |
| Apr 2025 | 3 | — | — | — |
| Mar 2025 | 6 | AED 1.79M | 2 094 | 2 045 – 2 135 |
| Feb 2025 | 3 | — | — | — |
| Jan 2025 | 1 | — | — | — |
| Dec 2024 | 6 | AED 2.06M | 2 067 | 1 867 – 2 291 |
| Nov 2024 | 9 | AED 1.81M | 2 029 | 1 974 – 2 116 |
| Oct 2024 | 8 | AED 1.78M | 2 005 | 1 955 – 2 078 |
| Sep 2024 | 17 | AED 1.89M | 2 042 | 1 875 – 2 262 |
| Aug 2024 | 11 | AED 1.76M | 1 931 | 1 831 – 2 192 |
| Jul 2024 | 12 | AED 1.74M | 1 950 | 1 886 – 2 223 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in SOBHA HARTLAND
Questions about Sobha Hartland Waves Grande
Who is the developer of Sobha Hartland Waves Grande?
The Dubai Land Department project registry lists Sobha L.L.C as the developer of Sobha Hartland Waves Grande.
Is Sobha Hartland Waves Grande completed?
The DLD registry status of Sobha Hartland Waves Grande is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 31 Oct 2023 — a registry date, not a handover promise.
How many homes are in Sobha Hartland Waves Grande?
The DLD registry records 440 units in Sobha Hartland Waves Grande.
What is the price per square foot in Sobha Hartland Waves Grande?
Over the last 12 complete months the median registered sale in Sobha Hartland Waves Grande was AED 1.91M, or AED 2 096 per sqft, from 20 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Sobha Hartland Waves Grande?
The escrow agent recorded by DLD for Sobha Hartland Waves Grande is Bank Of Baroda.
Where is Sobha Hartland Waves Grande?
Sobha Hartland Waves Grande is in the SOBHA HARTLAND community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗