The Cove
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about The Cove: ChatGPT · Claude · Perplexity
The Cove is a project by The Lagoons Phase One L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 31 sales registered in the trailing 12 months at a median AED 3.00M (2 279 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 31 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | The Lagoons Phase One L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 7 Nov 2016 |
| Construction started | 14 Jan 2017 |
| Declared completion | 17 Nov 2021 — registry date, not a handover promise |
| Units in the project | 291 |
| Project area | 145 463 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 1826 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jan 2026: in the 9 months since, no month reached the five registered sales a median needs (20 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 16 technical inspections for this project, from 27 Jul 2017 at 5.5% to 17 Nov 2021 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 17 Nov 2021 | 100.0% | +4.8 pp |
| 7 Sep 2021 | 95.2% | +1.5 pp |
| 24 May 2021 | 93.7% | +3.5 pp |
| 7 Feb 2021 | 90.1% | +3.9 pp |
| 1 Nov 2020 | 86.2% | +6.1 pp |
| 9 Jul 2020 | 80.1% | +9.1 pp |
| 12 Mar 2020 | 71.0% | +6.9 pp |
| 22 Jan 2020 | 64.0% | +13.8 pp |
| 7 Oct 2019 | 50.2% | +10.2 pp |
| 1 Jul 2019 | 40.1% | +11.7 pp |
| 17 Feb 2019 | 28.4% | +8.3 pp |
| 30 Oct 2018 | 20.0% | +4.7 pp |
| 14 Aug 2018 | 15.3% | +6.3 pp |
| 2 May 2018 | 9.1% | +2.0 pp |
| 15 Jan 2018 | 7.1% | +1.6 pp |
| 27 Jul 2017 | 5.5% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (8) | 8 | AED 1.73M | 2 270 | 754 sqft | — | — |
| 2-bedroom apartments low sample (15) | 15 | AED 3.00M | 2 279 | 1 339 sqft | — | — |
| 3-bedroom apartments low sample (7) | 7 | AED 4.40M | 2 274 | 1 840 sqft | — | — |
| 4-bedroom apartments insufficient data | 1 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 16 Nov 2026 | 3 B/R Flat — Building 3 | Ready | 1 871 sqft | AED 4 750 000 | 2 539 |
| 13 Nov 2026 | 2 B/R Flat — Building 1 | Ready | 1 283 sqft | AED 3 200 000 | 2 495 |
| 5 Nov 2026 | 3 B/R Flat — Building 1 | Ready | 1 840 sqft | AED 4 700 000 | 2 554 |
| 13 Oct 2026 | 2 B/R Flat — Building 1 | Ready | 1 343 sqft | AED 3 200 000 | 2 383 |
| 29 Sep 2026 | 3 B/R Flat — Building 3 | Ready | 1 871 sqft | AED 4 400 000 | 2 352 |
| 11 Sep 2026 | 2 B/R Flat — Building 1 | Ready | 1 283 sqft | AED 2 750 000 | 2 144 |
| 9 Sep 2026 | 2 B/R Flat — Building 1 | Ready | 1 339 sqft | AED 3 300 000 | 2 465 |
| 26 Aug 2026 | 1 B/R Flat — Building 3 | Ready | 770 sqft | AED 1 700 000 | 2 209 |
| 3 Aug 2026 | 2 B/R Flat — Building 1 | Ready | 1 339 sqft | AED 2 750 000 | 2 054 |
| 6 Jul 2026 | 2 B/R Flat — Building 1 | Ready | 1 339 sqft | AED 3 000 000 | 2 241 |
| 23 Jun 2026 | 2 B/R Flat — Building 1 | Ready | 1 283 sqft | AED 3 350 000 | 2 612 |
| 18 Jun 2026 | 4 B/R Flat — Building 1 | Ready | 4 136 sqft | AED 12 000 000 | 2 901 |
| 4 Jun 2026 | 2 B/R Flat — Building 3 | Ready | 1 344 sqft | AED 3 000 000 | 2 233 |
| 2 Jun 2026 | 2 B/R Flat — Building 1 | Ready | 1 340 sqft | AED 2 650 000 | 1 978 |
| 14 Apr 2026 | 3 B/R Flat — Building 3 | Ready | 1 871 sqft | AED 4 400 000 | 2 352 |
| 9 Apr 2026 | 2 B/R Flat — Building 2 | Ready | 1 206 sqft | AED 2 950 000 | 2 445 |
| 26 Mar 2026 | 2 B/R Flat — Building 1 | Ready | 1 339 sqft | AED 3 050 000 | 2 279 |
| 10 Mar 2026 | 3 B/R Flat — Building 2 | Ready | 1 746 sqft | AED 3 820 000 | 2 187 |
| 10 Mar 2026 | 2 B/R Flat — Building 1 | Ready | 1 662 sqft | AED 4 424 888 | 2 662 |
| 20 Feb 2026 | 2 B/R Flat — Building 2 | Ready | 1 217 sqft | AED 3 550 000 | 2 918 |
| 16 Feb 2026 | 1 B/R Flat — Building 1 | Ready | 826 sqft | AED 2 000 000 | 2 421 |
| 5 Feb 2026 | 1 B/R Flat — Building 2 | Ready | 724 sqft | AED 1 750 000 | 2 417 |
| 2 Feb 2026 | 2 B/R Flat — Building 2 | Ready | 1 313 sqft | AED 2 900 000 | 2 208 |
| 23 Jan 2026 | 3 B/R Flat — Building 2 | Ready | 1 746 sqft | AED 3 700 000 | 2 119 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for The Cove: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 25 | AED 3.02M | 2 279 | AED 75.44M |
| 2025 | 28 | AED 2.95M | 2 313 | AED 72.47M |
| 2024 | 26 | AED 3.15M | 2 256 | AED 82.89M |
| 2023 | 47 | AED 2.81M | 2 141 | AED 138.68M |
| 2022 | 71 | AED 2.79M | 2 066 | AED 208.24M |
| 2021 | 42 | AED 2.78M | 1 970 | AED 132.22M |
| 2020 | 19 | AED 2.24M | 1 851 | AED 40.59M |
| 2019 | 40 | AED 1.73M | 1 840 | AED 79.14M |
| 2018 | 43 | AED 1.61M | 1 704 | AED 74.33M |
| 2017 | 74 | AED 2.26M | 1 804 | AED 164.53M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2022–2026
| Year | 1-bed flat | 2-bed flat | 3-bed flat | Gross yield |
|---|---|---|---|---|
| 2026 YTD | 95k | 155k | 251k | 5.12% |
| 2025 | 100k | 160k | 242k | — |
| 2024 | 90k | 145k | 212k | — |
| 2023 | 80k | 132k | 225k | 5.00% |
| 2022 | 75k | 119k | 190k | 4.51% |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jan 2026 | 5 | AED 3.45M | 2 211 | 2 119 – 2 274 |
| Dec 2025 | 3 | — | — | — |
| Nov 2025 | 3 | — | — | — |
| Oct 2025 | 1 | — | — | — |
| Sep 2025 | 2 | — | — | — |
| Aug 2025 | 3 | — | — | — |
| Jul 2025 | 1 | — | — | — |
| Jun 2025 | 3 | — | — | — |
| May 2025 | 1 | — | — | — |
| Apr 2025 | 2 | — | — | — |
| Mar 2025 | 0 | — | — | — |
| Feb 2025 | 5 | AED 2.85M | 2 172 | 2 126 – 2 296 |
| Jan 2025 | 2 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
Buildings in this project
| Building (DLD name) | Sales | Median price | Median AED/sqft | Off-plan |
|---|---|---|---|---|
| The Cove Building 1 low sample (16) | 16 | AED 3.05M | 2 357 | 0.0% |
| The Cove Building 2 low sample (10) | 10 | AED 2.92M | 2 242 | 0.0% |
| The Cove Building 3 low sample (5) | 5 | AED 3.00M | 2 233 | 0.0% |
| The Cove Ii Building 7 insufficient data | 0 | — | — | — |
| The Cove Ii Building 10 insufficient data | 0 | — | — | — |
| The Cove Ii Building 5 insufficient data | 0 | — | — | — |
| The Cove Ii Building 11 insufficient data | 0 | — | — | — |
| The Cove Ii Building 8 insufficient data | 0 | — | — | — |
| The Cove Ii Building 6 insufficient data | 0 | — | — | — |
| The Cove Podium insufficient data | 0 | — | — | — |
| The Cove Ii Townhouses insufficient data | 0 | — | — | — |
| The Cove Ii Building 9 insufficient data | 0 | — | — | — |
| The Cove Ii Building 4 insufficient data | 0 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of The Cove. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Creekside 18 Finished · The Lagoons Phase One L.L.C |
291 m | 100% |
| 17 Icon Bay Finished · The Lagoons Phase One L.L.C |
305 m | 100% |
| The Dubai Creek Residences Finished · The Lagoons Phase One L.L.C |
425 m | 100% |
| Harbour Views Finished · The Lagoons Phase One L.L.C |
456 m | 100% |
| Creek Gate Finished · The Lagoons Phase One L.L.C |
576 m | 100% |
| Creek Horizon Finished · The Lagoons Phase One L.L.C |
591 m | 100% |
| The Grand Finished · The Lagoons Phase One L.L.C |
660 m | 100% |
| Island Park I Finished · The Lagoons Phase One L.L.C |
682 m | 100% |
| Harbour Gate Finished · The Lagoons Phase One L.L.C |
763 m | 100% |
| Island Park Ii Finished · The Lagoons Phase One L.L.C |
785 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Dubai Creek Harbour
Questions about The Cove
Who is the developer of The Cove?
The Dubai Land Department project registry lists The Lagoons Phase One L.L.C as the developer of The Cove.
Is The Cove completed?
The DLD registry status of The Cove is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 17 Nov 2021 — a registry date, not a handover promise.
How many homes are in The Cove?
The DLD registry records 291 units in The Cove.
What is the price per square foot in The Cove?
Over the last 12 complete months the median registered sale in The Cove was AED 3.00M, or AED 2 279 per sqft, from 31 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for The Cove?
The escrow agent recorded by DLD for The Cove is Mashreq Bank Psc.
Where is The Cove?
The Cove is in the Dubai Creek Harbour community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Creekside 18, about 291 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗