The Maiden Residence
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about The Maiden Residence: ChatGPT · Claude · Perplexity
The Maiden Residence is a project by Tulip Althahabi Real Estate Development L.L.C, recorded at 73% complete at its last Dubai Land Department inspection. 7 sales registered in the trailing 12 months at a median —. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 7 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Tulip Althahabi Real Estate Development L.L.C |
| Status | Active |
| Construction progress | 73% — at the last DLD inspection |
| Registered with DLD | 20 Mar 2025 |
| Construction started | 15 Jan 2024 |
| Declared completion | 31 Dec 2025 — registry date, not a handover promise |
| Units in the project | 71 |
| Project area | 4 999 sqm |
| Escrow agent | National Bank Of Ras Al- Khaimah (P.S.C) |
| Project number | 2960 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2025: in the 14 months since, no month reached the five registered sales a median needs (7 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 22 Aug 2024 at 2.6% to 14 May 2026 at 73.0%. Over the inspections since 9 Dec 2024 it moved 3.55 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 14 May 2026 | 73.0% | +1.7 pp |
| 10 Mar 2026 | 71.3% | +30.2 pp |
| 7 Nov 2025 | 41.1% | +17.4 pp |
| 8 Jul 2025 | 23.7% | +11.4 pp |
| 9 Dec 2024 | 12.3% | +9.7 pp |
| 22 Aug 2024 | 2.6% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
At least 30 of the 71 homes in The Maiden Residence (42%) have no off-plan sale registered with the Dubai Land Department yet, as of 23 Nov 2026. The unit register lists 71 homes and DLD has recorded 41 off-plan sale registrations; because that count also includes resales before completion, the true number without a buyer can only be higher. This is not the developer's availability list.
| Homes | No sale yet, at least | In unit register | Registered sales |
|---|---|---|---|
| Studios | 8 | 32 | 24 |
| 1 bedroom | 18 | 30 | 12 |
| 2 bedrooms | 4 | 9 | 5 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (5) | 5 | — | — | 421 sqft | — | — |
| 1-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 5 Aug 2026 | Studio Flat | Off-plan | 421 sqft | AED 528 104 | 1 254 |
| 12 Mar 2026 | Studio Flat | Off-plan | 714 sqft | AED 466 065 | 653 |
| 27 Jan 2026 | 1 B/R Flat | Off-plan | 873 sqft | AED 680 250 | 779 |
| 3 Dec 2025 | 1 B/R Flat | Off-plan | 801 sqft | AED 861 650 | 1 076 |
| 3 Dec 2025 | Studio Flat | Off-plan | 449 sqft | AED 456 000 | 1 016 |
| 26 Nov 2025 | Studio Flat | Off-plan | 308 sqft | AED 450 000 | 1 463 |
| 19 Nov 2025 | Studio Flat | Off-plan | 308 sqft | AED 265 000 | 861 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for The Maiden Residence: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Sep 2025 – Aug 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 3 | — | — | AED 1.21M |
| 2025 | 38 | AED 774k | 1 046 | AED 15.62M |
| 2023 | 1 | — | — | AED 5.65M |
| 2015 | 1 | — | — | AED 5.25M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Aug 2025 | 7 | AED 744k | 1 005 | 991 – 1 039 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 7 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in International City Phase 3
Questions about The Maiden Residence
Who is the developer of The Maiden Residence?
The Dubai Land Department project registry lists Tulip Althahabi Real Estate Development L.L.C as the developer of The Maiden Residence.
Is The Maiden Residence completed?
The DLD registry status of The Maiden Residence is Active, 73% complete at the last DLD inspection. The declared completion date in the registry is 31 Dec 2025 — a registry date, not a handover promise.
How many homes are in The Maiden Residence?
The DLD registry records 71 units in The Maiden Residence. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in The Maiden Residence?
Too few sales were registered in The Maiden Residence in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.
Who holds the escrow account for The Maiden Residence?
The escrow agent recorded by DLD for The Maiden Residence is National Bank Of Ras Al- Khaimah (P.S.C).
Where is The Maiden Residence?
The Maiden Residence is in the International City Phase 3 community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗