Data Dubai

The Spark By Esnaad

The Spark By EsnaadFinished100% built50 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about The Spark By Esnaad: ChatGPT · Claude · Perplexity

The Spark By Esnaad is a project by Esnaad Real Estate Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 7 sales registered in the trailing 12 months at a median AED 1.47M (1 800 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 1.47M +0.7% y/y
≈ US$ 399k · typical range AED 1.36M – AED 1.81M
DLD verified
Median price per sqft
AED 1 800/sqft +10.6% y/y
typical range 1 783 – 1 871 AED/sqft
DLD verified
Registered sales
7 -70.8% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
57.1%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 7 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperEsnaad Real Estate Development L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD1 Mar 2024
Construction started1 Feb 2024
Units in the project50
Project area4 182 sqm
Escrow agentEmirates Islamic Bank P.J.S.C.
Project number2952

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Mar 2025: in the 19 months since, no month reached the five registered sales a median needs (13 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 4 technical inspections for this project, from 1 Feb 2024 at 0.0% to 5 May 2026 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%2024-02-012026-05-05

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
5 May 2026100.0% +2.9 pp
12 Mar 202697.1% +56.1 pp
23 Apr 202541.0% +41.0 pp
1 Feb 20240.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments insufficient data 4— — — — —
2-bedroom apartments insufficient data 2— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
9 Nov 20262 B/R FlatReady 1 072 sqftAED 1 500 000 1 400
20 Jul 20261 B/R FlatReady 736 sqftAED 1 330 000 1 806
26 Jun 20262 B/R FlatReady 911 sqftAED 1 725 000 1 893
24 Jun 20261 B/R FlatReady 839 sqftAED 1 465 000 1 746
24 Apr 2026ShopOff-plan 1 439 sqftAED 2 000 000 —
13 Feb 20262 B/R FlatOff-plan 1 068 sqftAED 1 900 000 1 780
22 Dec 20251 B/R FlatOff-plan 672 sqftAED 1 285 000 1 913
17 Nov 20251 B/R FlatOff-plan 780 sqftAED 1 400 000 1 794

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for The Spark By Esnaad: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

010202023202420252026010202023202420252026

registered sales per calendar year; the current year is incomplete

By month

012AprMayJunJulAugSepOctNovDecJanFebMar012MayJulSepNovJanMar

registered sales per month, Apr 2025 – Mar 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20265AED 1.73M —AED 8.42M
202524AED 1.41M 1 641AED 34.99M
202414AED 1.43M 1 628AED 19.66M
20231— —AED 8.69M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Mar 20259 AED 1.34M1 624 1 607 – 1 658
Feb 20255 AED 1.42M1 627 1 607 – 1 628
Jan 20251 —— —
Dec 20240 —— —
Nov 20242 —— —
Oct 20245 AED 1.43M1 628 1 617 – 1 646

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 7 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Mohammed Bin Rashid AL Maktoum District 11

Questions about The Spark By Esnaad

Who is the developer of The Spark By Esnaad?

The Dubai Land Department project registry lists Esnaad Real Estate Development L.L.C as the developer of The Spark By Esnaad.

Is The Spark By Esnaad completed?

The DLD registry status of The Spark By Esnaad is Finished, 100% complete at the last DLD inspection.

How many homes are in The Spark By Esnaad?

The DLD registry records 50 units in The Spark By Esnaad.

What is the price per square foot in The Spark By Esnaad?

Over the last 12 complete months the median registered sale in The Spark By Esnaad was AED 1.47M, or AED 1 800 per sqft, from 7 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for The Spark By Esnaad?

The escrow agent recorded by DLD for The Spark By Esnaad is Emirates Islamic Bank P.J.S.C..

Where is The Spark By Esnaad?

The Spark By Esnaad is in the Mohammed Bin Rashid AL Maktoum District 11 community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “The Spark By Esnaad — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/the-spark-by-esnaad/”. Reuse is permitted with attribution.