The Spark By Esnaad
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about The Spark By Esnaad: ChatGPT · Claude · Perplexity
The Spark By Esnaad is a project by Esnaad Real Estate Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 7 sales registered in the trailing 12 months at a median AED 1.47M (1 800 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 7 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Esnaad Real Estate Development L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 1 Mar 2024 |
| Construction started | 1 Feb 2024 |
| Units in the project | 50 |
| Project area | 4 182 sqm |
| Escrow agent | Emirates Islamic Bank P.J.S.C. |
| Project number | 2952 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Mar 2025: in the 19 months since, no month reached the five registered sales a median needs (13 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 4 technical inspections for this project, from 1 Feb 2024 at 0.0% to 5 May 2026 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 5 May 2026 | 100.0% | +2.9 pp |
| 12 Mar 2026 | 97.1% | +56.1 pp |
| 23 Apr 2025 | 41.0% | +41.0 pp |
| 1 Feb 2024 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments insufficient data | 4 | — | — | — | — | — |
| 2-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 9 Nov 2026 | 2 B/R Flat | Ready | 1 072 sqft | AED 1 500 000 | 1 400 |
| 20 Jul 2026 | 1 B/R Flat | Ready | 736 sqft | AED 1 330 000 | 1 806 |
| 26 Jun 2026 | 2 B/R Flat | Ready | 911 sqft | AED 1 725 000 | 1 893 |
| 24 Jun 2026 | 1 B/R Flat | Ready | 839 sqft | AED 1 465 000 | 1 746 |
| 24 Apr 2026 | Shop | Off-plan | 1 439 sqft | AED 2 000 000 | — |
| 13 Feb 2026 | 2 B/R Flat | Off-plan | 1 068 sqft | AED 1 900 000 | 1 780 |
| 22 Dec 2025 | 1 B/R Flat | Off-plan | 672 sqft | AED 1 285 000 | 1 913 |
| 17 Nov 2025 | 1 B/R Flat | Off-plan | 780 sqft | AED 1 400 000 | 1 794 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for The Spark By Esnaad: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Apr 2025 – Mar 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 5 | AED 1.73M | — | AED 8.42M |
| 2025 | 24 | AED 1.41M | 1 641 | AED 34.99M |
| 2024 | 14 | AED 1.43M | 1 628 | AED 19.66M |
| 2023 | 1 | — | — | AED 8.69M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Mar 2025 | 9 | AED 1.34M | 1 624 | 1 607 – 1 658 |
| Feb 2025 | 5 | AED 1.42M | 1 627 | 1 607 – 1 628 |
| Jan 2025 | 1 | — | — | — |
| Dec 2024 | 0 | — | — | — |
| Nov 2024 | 2 | — | — | — |
| Oct 2024 | 5 | AED 1.43M | 1 628 | 1 617 – 1 646 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 7 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Mohammed Bin Rashid AL Maktoum District 11
Questions about The Spark By Esnaad
Who is the developer of The Spark By Esnaad?
The Dubai Land Department project registry lists Esnaad Real Estate Development L.L.C as the developer of The Spark By Esnaad.
Is The Spark By Esnaad completed?
The DLD registry status of The Spark By Esnaad is Finished, 100% complete at the last DLD inspection.
How many homes are in The Spark By Esnaad?
The DLD registry records 50 units in The Spark By Esnaad.
What is the price per square foot in The Spark By Esnaad?
Over the last 12 complete months the median registered sale in The Spark By Esnaad was AED 1.47M, or AED 1 800 per sqft, from 7 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for The Spark By Esnaad?
The escrow agent recorded by DLD for The Spark By Esnaad is Emirates Islamic Bank P.J.S.C..
Where is The Spark By Esnaad?
The Spark By Esnaad is in the Mohammed Bin Rashid AL Maktoum District 11 community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗