Urbana Iii
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Urbana Iii: ChatGPT · Claude · Perplexity
Urbana Iii is a project by Emaar Dubai South Dwc Llc, recorded at 100% complete at its last Dubai Land Department inspection. 24 sales registered in the trailing 12 months at a median AED 1.66M (1 091 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 24 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Emaar Dubai South Dwc Llc |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 22 Mar 2017 |
| Construction started | 12 Aug 2017 |
| Declared completion | 31 May 2020 — registry date, not a handover promise |
| Units in the project | 372 |
| Project area | 59 218 sqm |
| Escrow agent | Dubai Islamic Bank (Public Joint Stock Company) |
| Project number | 1880 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Nov 2025: in the 11 months since, no month reached the five registered sales a median needs (18 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 9 technical inspections for this project, from 14 Nov 2017 at 3.4% to 21 May 2020 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 21 May 2020 | 100.0% | +4.9 pp |
| 30 Dec 2019 | 95.1% | +5.0 pp |
| 21 Aug 2019 | 90.1% | +9.7 pp |
| 5 May 2019 | 80.5% | +19.2 pp |
| 25 Dec 2018 | 61.2% | +21.2 pp |
| 9 Sep 2018 | 40.1% | +19.0 pp |
| 1 May 2018 | 21.1% | +6.0 pp |
| 28 Feb 2018 | 15.2% | +11.8 pp |
| 14 Nov 2017 | 3.4% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 2-bedroom apartments low sample (17) | 17 | AED 1.57M | 1 210 | 1 217 sqft | — | — |
| 3-bedroom apartments low sample (7) | 7 | AED 2.20M | 937 | 2 335 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 16 Oct 2026 | 2 B/R Flat — STACKED HOUSE BLOCK-38 | Ready | 1 157 sqft | AED 1 425 000 | 1 231 |
| 14 Oct 2026 | 2 B/R Flat — STACKED HOUSE BLOCK-25 | Ready | 1 157 sqft | AED 1 400 000 | 1 210 |
| 7 Sep 2026 | 2 B/R Flat — STACKED HOUSE BLOCK-43 | Ready | 1 217 sqft | AED 1 300 000 | 1 068 |
| 14 Aug 2026 | 3 B/R Flat — STACKED HOUSE BLOCK-18 | Ready | 2 153 sqft | AED 2 250 000 | 1 045 |
| 21 Jul 2026 | 3 B/R Flat — STACKED HOUSE BLOCK-11 | Ready | 2 389 sqft | AED 1 925 000 | 806 |
| 13 Jul 2026 | 2 B/R Flat — STACKED HOUSE BLOCK-49 | Ready | 1 217 sqft | AED 1 325 000 | 1 088 |
| 3 Jul 2026 | 3 B/R Flat — STACKED HOUSE BLOCK-13 | Ready | 2 320 sqft | AED 2 150 000 | 927 |
| 22 Jun 2026 | 2 B/R Flat — STACKED HOUSE BLOCK-29 | Ready | 609 sqft | AED 663 444 | 1 090 |
| 8 May 2026 | 2 B/R Flat — STACKED HOUSE BLOCK-13 | Ready | 1 217 sqft | AED 1 575 000 | 1 294 |
| 9 Apr 2026 | 3 B/R Flat — STACKED HOUSE BLOCK-48 | Ready | 2 386 sqft | AED 2 235 000 | 937 |
| 17 Feb 2026 | 2 B/R Flat — STACKED HOUSE BLOCK-43 | Ready | 1 217 sqft | AED 1 550 000 | 1 273 |
| 6 Feb 2026 | 2 B/R Flat — STACKED HOUSE BLOCK-17 | Ready | 1 626 sqft | AED 1 810 000 | 1 113 |
| 2 Feb 2026 | 2 B/R Flat — STACKED HOUSE BLOCK-49 | Ready | 1 711 sqft | AED 1 740 000 | 1 017 |
| 30 Jan 2026 | 2 B/R Flat — STACKED HOUSE BLOCK-09 | Ready | 1 649 sqft | AED 1 800 000 | 1 091 |
| 24 Dec 2025 | 2 B/R Flat — STACKED HOUSE BLOCK-21 | Ready | 1 626 sqft | AED 1 775 000 | 1 091 |
| 22 Dec 2025 | 2 B/R Flat — STACKED HOUSE BLOCK-36 | Ready | 1 214 sqft | AED 1 551 500 | 1 277 |
| 12 Dec 2025 | 2 B/R Flat — STACKED HOUSE BLOCK-13 | Ready | 1 157 sqft | AED 1 560 000 | 1 348 |
| 8 Dec 2025 | 2 B/R Flat — STACKED HOUSE BLOCK-14 | Ready | 1 630 sqft | AED 1 700 000 | 1 043 |
| 27 Nov 2025 | 3 B/R Flat — STACKED HOUSE BLOCK-20 | Ready | 2 153 sqft | AED 2 200 000 | 1 022 |
| 26 Nov 2025 | 2 B/R Flat — STACKED HOUSE BLOCK-38 | Ready | 1 217 sqft | AED 1 600 000 | 1 314 |
| 21 Nov 2025 | 2 B/R Flat — STACKED HOUSE BLOCK-21 | Ready | 1 157 sqft | AED 1 590 000 | 1 374 |
| 14 Nov 2025 | 3 B/R Flat — STACKED HOUSE BLOCK-24 | Ready | 2 444 sqft | AED 2 300 000 | 941 |
| 6 Nov 2025 | 2 B/R Flat — STACKED HOUSE BLOCK-06 | Ready | 1 214 sqft | AED 1 610 000 | 1 326 |
| 5 Nov 2025 | 3 B/R Flat — STACKED HOUSE BLOCK-15 | Ready | 2 335 sqft | AED 2 150 000 | 921 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Urbana Iii: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 14 | AED 1.66M | 1 089 | AED 23.15M |
| 2025 | 44 | AED 1.60M | 1 105 | AED 74.25M |
| 2024 | 80 | AED 1.29M | 937 | AED 109.19M |
| 2023 | 97 | AED 1.20M | 998 | AED 117.92M |
| 2022 | 78 | AED 1.32M | 722 | AED 109.33M |
| 2021 | 51 | AED 1.25M | 694 | AED 67.01M |
| 2020 | 43 | AED 1.17M | 752 | AED 51.56M |
| 2019 | 79 | AED 1.01M | 787 | AED 84.94M |
| 2018 | 29 | AED 1.01M | 621 | AED 31.70M |
| 2017 | 28 | AED 1.04M | 632 | AED 30.47M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2020–2026
2-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | 2-bed flat | 3-bed flat | Gross yield |
|---|---|---|---|
| 2026 YTD | 80k | 110k | — |
| 2025 | 80k | 104k | 5.23% |
| 2024 | 70k | 93k | 5.46% |
| 2023 | 60k | 78k | 5.03% |
| 2022 | 48k | 70k | 4.13% |
| 2021 | 40k | 59k | 3.66% |
| 2020 | 44k | — | 3.82% |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Nov 2025 | 6 | AED 1.88M | 1 168 | 961 – 1 323 |
| Oct 2025 | 1 | — | — | — |
| Sep 2025 | 6 | AED 1.68M | 1 139 | 876 – 1 280 |
| Aug 2025 | 2 | — | — | — |
| Jul 2025 | 1 | — | — | — |
| Jun 2025 | 5 | AED 1.53M | 1 215 | 1 056 – 1 232 |
| May 2025 | 5 | AED 1.68M | 1 024 | 1 016 – 1 166 |
| Apr 2025 | 2 | — | — | — |
| Mar 2025 | 2 | — | — | — |
| Feb 2025 | 5 | AED 1.50M | 1 102 | 840 – 1 232 |
| Jan 2025 | 5 | AED 1.35M | 1 109 | 1 093 – 1 109 |
| Dec 2024 | 4 | — | — | — |
| Nov 2024 | 5 | AED 1.51M | 929 | 928 – 945 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
Buildings in this project
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
5 projects with a page on this site are registered within 1.2 km of Urbana Iii. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Urbana Finished · Emaar Dubai South Dwc Llc |
404 m | 100% |
| Golf Views Finished · Emaar Dubai South Dwc Llc |
515 m | 100% |
| Golf Links Finished · Emaar Dubai South Dwc Llc |
852 m | 100% |
| Urbana Ii Finished · Emaar Dubai South Dwc Llc |
869 m | 100% |
| Saffron Cancelled · Emaar Dubai South Dwc Llc |
937 m | 0% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Dubai World Central
Questions about Urbana Iii
Who is the developer of Urbana Iii?
The Dubai Land Department project registry lists Emaar Dubai South Dwc Llc as the developer of Urbana Iii.
Is Urbana Iii completed?
The DLD registry status of Urbana Iii is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 31 May 2020 — a registry date, not a handover promise.
How many homes are in Urbana Iii?
The DLD registry records 372 units in Urbana Iii.
What is the price per square foot in Urbana Iii?
Over the last 12 complete months the median registered sale in Urbana Iii was AED 1.66M, or AED 1 091 per sqft, from 24 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Urbana Iii?
The escrow agent recorded by DLD for Urbana Iii is Dubai Islamic Bank (Public Joint Stock Company).
Where is Urbana Iii?
Urbana Iii is in the Dubai World Central community. 5 other projects with a page on this site are registered within 1.2 km; the closest is Urbana, about 404 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗