Data Dubai

Avanti Tower

Avanti TowerFinished100% built161 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Avanti Tower: ChatGPT · Claude · Perplexity

Avanti Tower is a project by Damac Star Properties (L L C), recorded at 100% complete at its last Dubai Land Department inspection. 11 sales registered in the trailing 12 months at a median AED 1.27M (1 409 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 1.27M +19.9% y/y
≈ US$ 346k · typical range AED 1.03M – AED 1.62M
DLD verified
Median price per sqft
AED 1 409/sqft +8.3% y/y
typical range 1 346 – 1 473 AED/sqft
DLD verified
Registered sales
11 -45.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 11 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperDamac Star Properties (L L C)
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD4 May 2014
Construction started1 Aug 2014
Declared completion16 Dec 2018 — registry date, not a handover promise
Units in the project161
Project area12 327 sqm
Escrow agentEmirates Nbd Bank (P.J.S.C)
Project number1506

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Sep 2023: in the 37 months since, no month reached the five registered sales a median needs (48 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 12 technical inspections for this project, from 10 Dec 2014 at 8.4% to 16 Dec 2018 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2018-12-162014-12-102018-12-16

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
16 Dec 2018100.0% +8.3 pp
1 Jul 201891.7% +10.5 pp
19 Feb 201881.1% +15.0 pp
23 Oct 201766.1% +13.5 pp
19 Jul 201752.6% +7.5 pp
3 Apr 201745.0% +7.3 pp
23 Nov 201637.8% +7.6 pp
31 Aug 201630.2% +10.2 pp
21 Apr 201620.0% +7.6 pp
18 Nov 201512.4% +2.2 pp
14 Apr 201510.1% +1.7 pp
10 Dec 20148.4% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios insufficient data 2— — — — —
1-bedroom apartments low sample (5) 5AED 1.25M 1 367 883 sqft — —
2-bedroom apartments insufficient data 2— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
8 Sep 20261 B/R FlatReady 682 sqftAED 970 000 1 422
31 Jul 20261 B/R FlatReady 883 sqftAED 1 085 000 1 229
16 Jul 20261 B/R FlatReady 929 sqftAED 1 250 000 1 346
21 May 2026Studio FlatReady 532 sqftAED 750 000 1 409
25 Feb 2026ShopReady 976 sqftAED 2 295 160 —
23 Feb 20261 B/R FlatReady 929 sqftAED 1 270 000 1 367
10 Feb 20262 B/R Hotel ApartmentReady 1 294 sqftAED 1 517 533 1 173
4 Feb 2026ShopReady 750 sqftAED 1 729 920 —
14 Jan 20262 B/R FlatReady 1 241 sqftAED 2 015 000 1 624
11 Dec 2025Studio FlatReady 472 sqftAED 700 000 1 482
19 Nov 20251 B/R FlatReady 865 sqftAED 1 275 000 1 473

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Avanti Tower: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

01020302015201620172018201920202021202220232024202520260102030201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

024OctNovDecJanFebMarAprMayJunJulAugSep024NovJanMarMayJulSep

registered sales per month, Oct 2023 – Sep 2024

YearSalesMedian priceMedian AED/sqftTotal registered value
20269AED 1.27M 1 367AED 12.88M
202521AED 1.05M 1 327AED 22.64M
202419AED 1.12M 1 286AED 21.72M
202327AED 1.29M 1 346AED 30.89M
202233AED 1.19M 1 284AED 39.36M
202110AED 886k 1 359AED 11.12M
20202— —AED 2.13M
20198AED 1.31M 1 523AED 10.64M
201812AED 1.34M 1 718AED 15.63M
201712AED 1.04M 1 801AED 13.02M
20162— —AED 2.47M
20153— —AED 4.49M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent by year, 2019–2026

40k50k60k2019202020212022202320242025202640k50k60k2019202120232025

Studio: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
YearStudio1-bed flat2-bed flat
2026 YTD 50k81k—
2025 60k85k—
2024 60k85k122k
2023 55k76k110k
2022 48k70k95k
2021 38k60k—
2020 35k60k—
2019 48k68k—

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Sep 20235 AED 890k1 337 1 289 – 1 346
Aug 20232 —— —
Jul 20232 —— —
Jun 20232 —— —
May 20231 —— —
Apr 20233 —— —
Mar 20235 AED 622k1 109 1 103 – 1 459
Feb 20234 —— —
Jan 20231 —— —
Dec 20222 —— —
Nov 20223 —— —
Oct 20220 —— —
Sep 20221 —— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 11 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Avanti Tower. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Oxford Tower
Finished · Deyaar Development (P.J.S.C)
54 m100%105
Capital Bay B
Finished · Damac Star Properties (L L C)
90 m100%186
Capital Bay A
Finished · Damac Star Properties (L L C)
90 m100%177
Safeer Tower 1
Finished · Alseeb Real Estate Development L.L.C
168 m100%176
Dec Business Tower
Cancelled · Dheeraj & East Coast (L.L.C)
176 m28%—
Sobha Ivory - Ii
Finished · Sobha Properties Limited
211 m100%92
Sobha Sapphire
Finished · Sobha Ventures Limited
238 m100%172
Sol Bay
Finished · S O L Properties Development L.L.C
245 m100%325
Park Central
Finished · Damac Star Properties (L L C)
271 m100%147
Sobha Ivory
Finished · Jupiter Estates Limited
308 m100%92

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Business Bay

Questions about Avanti Tower

Who is the developer of Avanti Tower?

The Dubai Land Department project registry lists Damac Star Properties (L L C) as the developer of Avanti Tower.

Is Avanti Tower completed?

The DLD registry status of Avanti Tower is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 16 Dec 2018 — a registry date, not a handover promise.

How many homes are in Avanti Tower?

The DLD registry records 161 units in Avanti Tower.

What is the price per square foot in Avanti Tower?

Over the last 12 complete months the median registered sale in Avanti Tower was AED 1.27M, or AED 1 409 per sqft, from 11 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Avanti Tower?

The escrow agent recorded by DLD for Avanti Tower is Emirates Nbd Bank (P.J.S.C).

Where is Avanti Tower?

Avanti Tower is in the Business Bay community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Oxford Tower, about 54 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Avanti Tower — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/avanti-tower/”. Reuse is permitted with attribution.