Data Dubai

Safeer Tower 1

Safeer Tower 1Finished100% built176 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Safeer Tower 1: ChatGPT · Claude · Perplexity

Safeer Tower 1 is a project by Alseeb Real Estate Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 13 sales registered in the trailing 12 months at a median AED 740k (1 319 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 740k -20.2% y/y
≈ US$ 201k · typical range AED 655k – AED 1.08M
DLD verified
Median price per sqft
AED 1 319/sqft +17.5% y/y
typical range 1 104 – 1 438 AED/sqft
DLD verified
Registered sales
13 -40.9% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 13 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAlseeb Real Estate Development L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD24 Jul 2014
Construction started1 Mar 2014
Declared completion26 Jan 2017 — registry date, not a handover promise
Units in the project176
Project area13 751 sqm
Escrow agentNoor Bank P.J.S.C
Project number1546

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2024: in the 27 months since, no month reached the five registered sales a median needs (40 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 4 technical inspections for this project, from 12 Feb 2015 at 54.4% to 5 Feb 2017 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2017-01-262015-02-122017-02-05

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
5 Feb 2017100.0% +15.4 pp
28 Feb 201684.6% +8.8 pp
20 Dec 201575.8% +21.4 pp
12 Feb 201554.4% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios low sample (7) 7AED 655k 1 438 455 sqft — —
1-bedroom apartments insufficient data 4— — — — —
2-bedroom apartments insufficient data 2— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
14 Oct 20262 B/R FlatReady 1 580 sqftAED 1 650 000 1 044
27 Jul 20261 B/R FlatReady 857 sqftAED 1 050 000 1 225
29 Jun 20261 B/R FlatReady 961 sqftAED 1 060 000 1 104
23 Jun 2026Studio FlatReady 457 sqftAED 640 000 1 400
2 Apr 2026Studio FlatReady 455 sqftAED 600 000 1 319
30 Mar 2026Studio FlatReady 457 sqftAED 665 000 1 455
9 Mar 20261 B/R FlatReady 960 sqftAED 1 177 292 1 226
25 Feb 20262 B/R FlatReady 1 501 sqftAED 1 600 000 1 066
12 Jan 2026Studio FlatReady 445 sqftAED 655 000 1 472
25 Dec 2025Studio FlatReady 445 sqftAED 640 000 1 438
18 Dec 2025Studio FlatReady 445 sqftAED 740 000 1 663
27 Nov 20251 B/R FlatReady 1 011 sqftAED 1 080 000 1 068
13 Nov 2025Studio FlatReady 462 sqftAED 655 000 1 418

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Safeer Tower 1: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

050100201520162017201820192020202120222023202420252026050100201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

024AugSepOctNovDecJanFebMarAprMayJunJul024SepNovJanMarMayJul

registered sales per month, Aug 2024 – Jul 2025

YearSalesMedian priceMedian AED/sqftTotal registered value
20269AED 1.05M 1 226AED 9.10M
202520AED 745k 1 402AED 19.13M
202424AED 875k 1 171AED 24.49M
202322AED 1.01M 908AED 23.14M
202210AED 676k 792AED 6.01M
20214— —AED 2.28M
202014AED 607k 600AED 8.18M
20194— —AED 3.32M
20189AED 600k 1 256AED 8.12M
2017113AED 1.20M 1 497AED 136.07M
20169AED 762k 1 671AED 8.10M
201542AED 768k 1 638AED 40.97M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2017–2026

40k60k201720182019202020212022202320242025202640k60k2017202020232026

Studio: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
YearStudio1-bed flat2-bed flatGross yield
2026 YTD 55k75k——
2025 55k75k110k—
2024 52k75k110k—
2023 45k62k——
2022 38k52k——
2021 30k45k67k—
2020 31k50k——
2019 40k65k——
2018 46k70k——
2017 52k75k105k5.57%

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Jul 20245 AED 1.18M1 226 1 095 – 1 406
Jun 20242 —— —
May 20243 —— —
Apr 20242 —— —
Mar 20240 —— —
Feb 20240 —— —
Jan 20241 —— —
Dec 20231 —— —
Nov 20231 —— —
Oct 20232 —— —
Sep 20233 —— —
Aug 20232 —— —
Jul 20232 —— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 13 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Safeer Tower 1. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Capital Bay B
Finished · Damac Star Properties (L L C)
93 m100%186
Capital Bay A
Finished · Damac Star Properties (L L C)
93 m100%177
Avanti Tower
Finished · Damac Star Properties (L L C)
168 m100%161
Park Central
Finished · Damac Star Properties (L L C)
198 m100%147
Dec Business Tower
Cancelled · Dheeraj & East Coast (L.L.C)
202 m28%—
Oxford Tower
Finished · Deyaar Development (P.J.S.C)
211 m100%105
Sobha Ivory - Ii
Finished · Sobha Properties Limited
253 m100%92
Sobha Ivory
Finished · Jupiter Estates Limited
283 m100%92
Sol Bay
Finished · S O L Properties Development L.L.C
307 m100%325
Sky Bay Hotel
Finished · T F G Real Estate L.L.C
334 m100%711

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Business Bay

Questions about Safeer Tower 1

Who is the developer of Safeer Tower 1?

The Dubai Land Department project registry lists Alseeb Real Estate Development L.L.C as the developer of Safeer Tower 1.

Is Safeer Tower 1 completed?

The DLD registry status of Safeer Tower 1 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 26 Jan 2017 — a registry date, not a handover promise.

How many homes are in Safeer Tower 1?

The DLD registry records 176 units in Safeer Tower 1.

What is the price per square foot in Safeer Tower 1?

Over the last 12 complete months the median registered sale in Safeer Tower 1 was AED 740k, or AED 1 319 per sqft, from 13 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Safeer Tower 1?

The escrow agent recorded by DLD for Safeer Tower 1 is Noor Bank P.J.S.C.

Where is Safeer Tower 1?

Safeer Tower 1 is in the Business Bay community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Capital Bay B, about 93 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Safeer Tower 1 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/safeer-tower-1/”. Reuse is permitted with attribution.