Park Gate 2

Park Gate 2Active55% built17 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Park Gate 2: ChatGPT · Claude · Perplexity

Park Gate 2 is a project by Dubai Hills Estate L.L.C, recorded at 55% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
0
all property types · trailing 12 complete months
DLD verified
Off-plan share
—
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperDubai Hills Estate L.L.C
StatusActive
Construction progress55% — at the last DLD inspection
Registered with DLD9 Apr 2025
Construction started17 Jun 2025
Declared completion28 Feb 2027 — registry date, not a handover promise
Units in the project17
Project area9 098 sqm
Escrow agentEmirates Nbd Bank (P.J.S.C)
Project number3641

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 5 technical inspections for this project, from 2 Apr 2025 at 0.0% to 8 Jun 2026 at 55.1%. Over the inspections since 2 Apr 2025 it moved 3.89 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2027-02-282025-04-022026-06-08

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
8 Jun 202655.1% +7.5 pp
19 Feb 202647.7% +30.8 pp
5 Nov 202516.9% +14.8 pp
30 Jul 20252.2% +2.2 pp
2 Apr 20250.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Park Gate 2: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

05101520250510152025

registered sales per calendar year; the current year is incomplete

YearSalesMedian priceMedian AED/sqftTotal registered value
202517AED 14.42M —AED 249.03M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 0 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in DUBAI HILLS

Questions about Park Gate 2

Who is the developer of Park Gate 2?

The Dubai Land Department project registry lists Dubai Hills Estate L.L.C as the developer of Park Gate 2.

Is Park Gate 2 completed?

The DLD registry status of Park Gate 2 is Active, 55% complete at the last DLD inspection. The declared completion date in the registry is 28 Feb 2027 — a registry date, not a handover promise.

How many homes are in Park Gate 2?

The DLD registry records 17 units in Park Gate 2.

What is the price per square foot in Park Gate 2?

Too few sales were registered in Park Gate 2 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Park Gate 2?

The escrow agent recorded by DLD for Park Gate 2 is Emirates Nbd Bank (P.J.S.C).

Where is Park Gate 2?

Park Gate 2 is in the DUBAI HILLS community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Park Gate 2 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/park-gate-2/”. Reuse is permitted with attribution.